Extreme engineering Extreme engineering – part 1 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : 2010.02.15) ready 1 Copyright notice Unauthorised.

Slides:



Advertisements
Similar presentations
A3 - dual carriageway link between London and Portsmouth 6.5km new road, 1.77km in bored tunnel £371 million Construction started January 2007 Project.
Advertisements

Measurement for Civil Engineering works
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
W. J. M. K. PERERA (RU/E/2007/119) Department of Civil and Environmental Engineering.
Foundations Excavations
And Repair Of Structures
Dounreay Nuclear and Chemical Land Contamination.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
CONSTRUCTION.
GABION PRESENTATION.
Basic Civil Engineering-Foundation
TECHNOLOGY AND INNOVATION Substructure design, manufacturing and new concepts Stockholm, 2009 September 15 th INNOVATIONS IN DESIGN AND INSTALLATION.
CE 120 Introduction to Civil Engineering
CE 120 Introduction to Civil Engineering
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
Civil engineering branches & scopes
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
BASICS ELEMENTS OF CIVIL ENGINNERING Prepaid by:
Your logo کاربرد ژئوگرید در افزایش پایداری موج شکنها
Department of Civil Engineering,
高等职业技术教育教材 English for Construction Engineering 建筑工程专业英语 主 编:陆伟成 副 主 编:付 奕 尹春霞.
CEE Civil and Environmental Engineering Department W. M. Kim Roddis, Ph.D., P.E. Department Chair.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
بسم الله الرحمن الرحيم SUBJECT: Technical Research Group: Missions, Objectives, Plans and Priorities Prepared By: M.Hajimohammadi Rev.3.2.
Geo-Engineering In North Wales A Study of the A55 Between Chester and Anglesey.
No Cell Phones, Please. Thank You.. Division of Layne Christensen Company Specialty Foundation Construction Jet Grouting Drilled Micropiles Vibratory.
GEOTECHNICAL ENGINEERING. LAW OF HAMMURABI : İ.Ö.2130 EĞER BİR İNŞAATÇI BİR EV YAPAR, DOĞRU DAVRANMAYIP EVİN ÇÖKMESİNE SEBEBOLURSA O İNŞAATÇI YIKILAN.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
1 MICROFOR Micropile Interstate Cooperative Research on Foundations and slOpe Reinforcement Micropile Interstate Cooperative Research on Foundations and.
Decision Making and Data Management in Geotechnical Engineering
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Company and family presentation – part 5 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Part 10-2b Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-2b, PP 2007, animation+p/r : compr.)
(Part 9-2e, PP 2007, animation+p/r: rev compr.
WELCOME.
Part 10-1b Micropiles and self-drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-1b, PP 2007, animation+p/r : compr.)
Development and Application of High Strength FRP Pipes as Grouted- Reinforcing Members in Slope and Tunnel KSCE Annual Conference and Civil Expo 2004 Daewon.
Part 11 Concrete repairs - sealing of cracks and waterproofing (Part 11, PP 2007, animation+p/r : DEMO) ready Copyright notice Unauthorised.
Ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording.
Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
Part 16 Sequential and single sequence grouting with hybrid and semi-hybrid grouts VII-2009 (Part 16, PP 2007, animation+p/r : DEMO) ready 1.
Welcome to Condor Projects Ltd, a specialist contractor to the civil engineering industry with over 30 years experience
(Part 30, PP 2007, animation+p/r : short version compr.)
Concrete repairs in Dammam
Micropiles and self drilling rods in soil and rock engineering
Part 75-2A Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Jet grouting underpinning of a building on a marl embankment platform
How to make Buildings ductile for Good Seismic Performance?
By Tomasz Najder, Ph.D Civ. Eng.
Concrete repairs, crack sealing
Drilling and sampling in foundation engineering
Part 66/1 “Polyurethane resins in rock grouting and tunnel repairs”
Part 92_4 ”PUR in civil engineering – sealing of retaining walls”
Biological engineering and gabion constructions in coast protection
Part 75-4D Piles, steel-core piles and micropiles. Static test loadings. TNa micropiles.
Faculty Of Civil engineering department BMCET,SURAT.
Part 75-3D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
{Graduation Project} An-Najah National University
Drilling and sampling in foundation engineering
Water projects under The Cohesion Fund.
PREPARED BY SK SOHEL, CE-3RD YEAR GUIDED BY JAYASHREE SENGUPTA
EAG346-Sem II 2014/2015 Lesson 2.
Various Fields in Civil Engineering By R.Janani
No Cell Phones, Please. Thank You..
Drilling and sampling in foundation engineering
European Standard prEN 14199
IWM 2000 Turku, Finland Pasi Korkeakoski
Presentation transcript:

Extreme engineering Extreme engineering – part 1 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited.

NAJDER engineering ®NAJDER engineering ® is a consulting company as well as a specialist contractor within civil and foundation engineering. We are preparing technical concepts, design projects, analyses and performing jobs as a subcontractor. Skånska Cementgjuteriet Skanska ABTomasz Najder joined in the period of Skånska Cementgjuteriet (today Skanska AB) as a member of Supervising Team on the project “Second Dry Dock in Gdynia Shipyard”. Stabilator AB Skanska Group Stabilator Sp. z o.o. Skanska Group Tomasz Najder gained his experiences in Stabilator AB (daughter company in Skanska Group) as site manager, project manager and internal consultant (”trouble- shooter”), as Production Manager (Stabilator AB- International Division in Poland), in Polish-Swedish company Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager. Polibeton Sp. o.o. Najder engineering ® Polimark InternationalAnna Elżbieta Najder (wife) owned Polish company Polibeton Sp. o.o. and now Swedish Najder engineering ® since 1997 (until 2005 operating as Polimark International) – operating globally. Najder engineering ®Anna Monika Najder (daughter) together with Tomasz Najder (as the President of the Board and Executive Manager) owned Polish Najder engineering ® operating in Poland. Now Anna Monika is working as tunnelling consultant in Abu Dhabi. since six generations.Family Najder is working within mining, tunneling and civil engineering since six generations. Family and company history in civil engineering ready 2

3 Tomasz in PragueAnna and Tomasz in IstanbulAnna Monika on IcelandJan in Hallandsås ready

4 Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Tunneling, rock stability high/low-pressure grouting,Tunneling, rock stability and soil improvement (deep mixing method, high/low-pressure grouting, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextile). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Coast protection. Biological engineering, gabion constructions. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. Field of activity ready 4

Tomasz Najder Ph.D Civ. Eng. Born 1951 in Gdańsk (Danzig) in Poland M.Sc. Civ. Eng. at Technical University in Gdańsk / Polen Doctors thesis within geotechnical engineering at Technical University in Gdańsk. Since 1982 in Sweden. Employed in Skanska as Site Manager, Contract Manager, Internal Consultant (”trouble-shooter”) Vice President- Executive Manager of Stabilator Polen. Since 2002 Senior Consultant within family company Najder Engineering ® in Stockholm. Dealing with grouting since ready press 5

6 6 ready TNA systems for micropiling and anchoring - probably the most strongest solution in the world (?)

ready 7 TNA Micropile TNA Ø= 0.20 m - drilled version. Ultimate bearing capacity ca. 120 ton TNA TNA micropiles inside the cellar of the castle The Malbork Castle in Poland – build in XII century as Marienburg Schloss, - the largest brick construction in the world - the largest brick construction in the world

Slope instability just after disaster ready 8 Gniew Castle (Poland) Slope stabilization close to Gniew Castle (Poland) Slope stabilisation with TITAN ground anchors micropiles Slope stabilisation with TITAN ground anchors and micropiles - the example of complicated slope protection

TITAN micropiles longitudinal concrete beam ready 9 Slope restoration at it’s top TITAN - drilling and grouting of TITAN anchors

coast line ~ year 1500 ~ 1800 m 1998 ready 10 Slope stabilization of the Trzęsacz church ruin (Poland) at the Baltic See coast - probably the most sofisticated coast- and slope protection in the world (?) 1870

11 ready Concept of protection 1998 Church and coast line 2008

12 the largest sink shaft in the world. Sikfors Sweden ( ): the largest sink shaft in the world. Diameter 20m, weight T ready

13 ready

14 Reubilding and underpinning of industrial buildings ready

15 ready City Tunnel in Hälsingborg (Sweden) - tunneling and underpinning in urban areas

16 Location of the projects on Iceland the huge inflow Breiđalsheiđi and Botnsheiđi Project ; the huge inflow the longest tunnel system in the world Kárahnjúkar Hydropower Project ; the longest tunnel system in the world - performed in probably most dangerous and complicated rock conditions in tunneling history the huge inflow Héðinsfjarðargöng Project ; the huge inflow ready

17 Ísafjörður - Iceland The tunnels of Breiđalsheiđi and Botnsheiđi Breiđaldalur tunnel shortly after huge water inflow Water inflow ~ 1-2m 3 /sec ready

18 Water pressure ~ approx. 60 bars Water inflow ~ 50 l/sec/hole Water temperature ca. +20ºC Inserting of mechanical packers in high water pressure conditions Face after final grouting ready

19 Diversion Tunnels at dam2.4 km(Kar 14) Headrace Tunnel53.0 km (Kar 14) Grouting galleries at dam 0.5 km (Kar 14) Cable tunnel 1.0 km Hraun Diversion 2.0 km Grjótá Diversion 1.75 km Adit km (Kar 14) Adit 22.7 km (Kar 14) Adit km (Kar 14) Surge Tunnel 1.7 km (Kar 14) Drainage Tunnel 0.7 km (Kar 14) Penstocks 0.82 km (2x) Access to Powerhouse 1.0 km Tailrace Tunnel 1.3 km Total Tunnel Length:73.0 km (D&B=10 km, TBM=63 km) ready 19 Kárahnjúkar Hydropower Project

20 ready

21 ready

22 ready

23 ready

Thank You for Your attention! ready 24 THE END