MDI Overview Hitoshi Yamamoto Tohoku University GDE/LCWS06, Bangalore, March 9, 2006.

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

Background studies Takashi Maruyama SLAC GDE Baseline Assessment Workshop SLAC, January 18-21, 2011.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
山本 均 Hitoshi Yamamoto 東北大学 Tohoku University 北京、十一月二十三日、二 00 六年 Beijing, Nov 24, 2006 WWS Report MDI Report.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
20 March 2005Ken Moffeit LCWS1 Highlights from the MDI workshop Spin Rotation System for 2 IR’s Downstream polarimetry Ken Moffeit.
1 27 Sep 05 Discussion of anti-DID ( “DIDNT” ? ) A.Seryi September 27, 2005.
Status of ongoing studies for comparing 2-mrad and 20-mrad IRs T. Maruyama SLAC.
IP crossing-angle and LC technology recommendation Philip Bambade LAL, Orsay 5 th ITRP meeting, Caltech, USA Session on detector & physics issues June.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Overview of Extraction Line Designs and Issues
August 2005Snowmass Workshop IP Instrumentation Wolfgang Lohmann, DESY Measurement of: Luminosity (precise and fast) Energy Polarisation.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle HH-Zeuthen-LC-Meeting Zeuthen September.
Philip Burrows MDI session, LCWS06 Bangalore, 10/3/06 SiD MDI Issues Philip Burrows John Adams Institute Oxford University Thanks to: Marty Breidenbach,
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Polarimetry at the LC Source Which type of polarimetry, at which energies for LC ? Sabine Riemann (DESY), LEPOL Group International Workshop on Linear.
Jan MDI WS SLAC Electron Detection in the Very Forward Region V. Drugakov, W. Lohmann Motivation Talk given by Philip Detection of Electrons and.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle LCWS 2004 Paris April 19 th 2004.
September 20, 2006 Global Design Effort 1 Process of change of BDS baseline to 14/14 configuration BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto,
Analysis of Beamstrahlung Pairs ECFA Workshop Vienna, November 14-17, 2005 Christian Grah.
LDC Meeting Vienna 17. November 2005 Karsten Büßer LDC Machine Detector Interface Update.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
Photon collider: ILC configuration and IR issues ( how to make 14mr compatible with gamma-gamma) Valery Telnov Budker INP IRENG07, Sept.18, 2007, SLAC.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
Karsten Büßer Instrumentation of the Forward Region of the TESLA Detector International Europhysics Conference on High Energy Physics Aachen, July 19th.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Interaction Region Issues and Beam Delivery R&D Issues & IR Design Status R&D Plans T. Markiewicz Klaisner Review 4/15/1999.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
WG4: (Beam Delivery, Interaction Region, …) SUMMARY Grahame Blair, Tomoyuki Sanuki, Andrei Seryi On behalf of WG4 participants 15 November 2004 First ILC.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
IR/Backgrounds & Beam Instrumentation Summary Tom Markiewicz/SLAC ALCPG’09, UNM, Albuquerque 3 October 2009 Six Sessions, 20 talks Instrumentation: –WAB.
1 BILC07/ACFA Charge Hitoshi Yamamoto BILC07, Beijing
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
Ken Moffeit SLAC LCWA09 1 Polarization Considerations for CLIC Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Octobre 2007LAL Orsay Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY.
LCWS Paris – April 19-23, 2004 Polarimeter Issues K. Peter Schüler Polarimeter Issues 1 Polarimeter Studies for TESLA O General Considerations O.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
Very Forward Instrumentation: BeamCal Ch. Grah FCAL Collaboration ILD Workshop, Zeuthen Tuesday 15/01/2008.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
FCAL Takashi Maruyama SLAC SiD Workshop, 15 – 17 November, 2010, Eugene, Oregon.
BDIR/MDI Summary ECFA Final Plenary
Layout of Detectors for CLIC
BDIR/MDI Summary ECFA Final Plenary
Testbeam plans for LEP instrumentation
Beam Delivery update Andrei Seryi December 12, 2005
Overview of Polarimetry
Presentation transcript:

MDI Overview Hitoshi Yamamoto Tohoku University GDE/LCWS06, Bangalore, March 9, 2006

MDI Panel ■ Members ◆ LEP panel (Luminosity, Energy, Polarization) Wolfgang Lohmann, Tsunehiko Omori, Eric Torrence ◆ GDE Philip Bambade, Witold Kozanecki, Tom Markiewicz, Andei Seryi, HY (chair) ◆ Detector concepts Phil Burrows, Karstern Buesser, Toshiaki Tauchi (+...) ■ Charge ◆ (In short) Maintain oversight of IR/MDI issues that are relevant both to accelerator and detectors and report to WWS and GDE Area Group. Organize joint MDI sessions. Formed Dec by WWS and GDE

MDI Sessions (GDE+WWS) ■ Friday 10th, 11am-12:30pm (J.N. Tata) ◆ MDI issues - A. Seryi ◆ IR designs by detector concepts GLD IR design - Toshiaki. Tauchi LDC IR design - Karsten Buesser SiD IR design - Phil Burrows Discussion ■ Saturday 11th, 10am-11:30am (J.N. Tata) (over the coffee break) ◆ 1 IR vs 2 IR Introduction by Tom. Markiewicz + Discussion ◆ Detector backgrounds Introduction by Karsten. Buesser + Discussion ◆ MDI for gamma-gamma Introduction by Klauss. Moenig + Discussion Goal : communication between acc. and det.

MDI Sessions (WWS) ■ Sunday 12th, 9am-10:30pm (J.N. Tata) End station A R&D program Energy spectrometry (End station A) Fast and precise Luminosity measurement Systematic limitations to luminosity BeamCal Veto performance Physics Data for Detector Calibration ■ Sunday 12th, 2pm-4pm (J.N. Tata) The ATF laser wire system Laser requirements Stimulated Breit-Wheeler process as a source of pairs Power losses in the 20 mrad extraction line at 1 TeV Energy depositions in the extraction line First estimate of backgrounds reflected at... Final doublet layouts and power densities The stabilisation of final focus (StaFF) system Study on Low-Energy Positron Polarimetry Polarized positron source (E166)

1 IR vs 2 IR ■ 2 IR 2 detectors : 2 mrad/20 mard ◆ 2 IR’s shifted longitudinally by ~140m, tranversely ~20m 2 IR halls (baseline) ◆ One long hall to contain 2 IR and 2 detectors (alternative)

■ 1 IR : may be~14 mrad xing ◆ 1 detector : simple ◆ 2 detectors : means push-pull Switchover time ~ 1 day, Frequency ~ every 3month So that luminosity in one ‘in’ does not generate physics (1 day to find Higgs? - at design lum.) Shielding - self shielding (‘PACMAN’) → No shielding wall. Floor motion ~ a few mm. → Wall and floor to be independent. Final quads attached to detector. SC solenoid may stay cool. → MDI sesssion(3/11 10am), A. Seryi’ s GDE talk (3/9 17:30)

Energy Measurement ■ Goal: ◆ 100ppm (10 -4 ) absolute energy measurement ■ Baseline: ◆ 1 upstream + 1 downstream spectrometers / beam ◆ Upstream spectrometer 4-magnet chicane + RF BPMs 1mm offset +  100nm:10 -4 ◆ Downstream spectrometer 3-magnet chicane w/wigglers + SR photon detectors BPM Wiggler SR detector

20mrad xing extraction line diagnostics SR detectors Wigglers Polarimeter Energy chicane Compton detector Z0Z0 250 GeV Compton IP

2mrad xing extraction line disgnostics Plan view Side view wigglers SR detectors Energy chicane Polarimeter Compton detector

Energy Measurement R&Ds ■ Upstream spectrometer Calibration and operation precedure RF BPM design (better than 100nm accuracy) BPM tests : ATF (nBPM program), SLAC ESA. ■ Downstream spectrometer Detailed simulation (realistic magntic fields, backgrounds) Design, evaluation of wiggler magnets. SR detector (quartz fiber) readout test. ■ Full scale prototypes ◆ Both BPM-based and SR-based, at SLAC ESA

Polarization Measurement ■ Goal : ◆ 0.25% accuracy (particularly on Z) ■ Baseline : ◆ 1 upstream + 1 downstrem polarimeters / beam ◆ Compton polarimeter Shoot circularly-polarized photon at the electron beam at a focus. Measure the compton-scattered electron. Polarization vector at IP = that at the polarimeter → beam direction at IP parallel to that at the polarimeter 4-magnet chicane

Luminosity Measurement ■ Accuracy goal : or better absolute ■ Detector : LUMCAL(LUMMON/FCAL) ◆ ~30-90 mrad ◆ ~10 Bhabhas/train ◆ Default : Si-W calorimeter ■ R&Ds The precision achievable for different xing angles? Careful systematics studies desirable for Giga-Z, larger polar angles? Backgrounds from pairs etc.? ■ ‘Physics’ events (central detector) : ◆ Acollinear Bhabha → Luminosity spectrum etc.

LDC IR configration (2mrad xing) GLD IR configration (2mrad xing)

20 mrad 2 mrad 4 m 26 cm 2 m 20 cm BeamCal SiD IR configuration

B e+ e- outgoing incoming slow e- : along B fast e- : along beam Pairs K. Buesser e+ kicked up/down : contains beam profile info. Larger xing angle → larger bkg. (e+ ⇔ e- for the other side of IP) 20 mrad xing

Pairs-Region Detectors ■ 5~30 mrad ■ pairs/bunch ■ BEAMCAL (BCAL) ◆ Fine-segmented Diamond-W ◆ Fast luminosity/beam profile feedback ◆ Also used to reject 2-photon bkg in SUSY pair prodction. ■ Pair monitor ◆ Single-layer silicon (less radiation) ◆ Slow luminosity/beam profile feedback ■ R&Ds ◆ Electron tagging (BEAMCAL) ◆ Prototyping ◆ Beam profile : work for large xing angles? ◆ Fast feedback for Si pair monitor

DID (Detector-Integrated Dipole) ■ Xing angle (w/o correction) ◆ beam sees B transeverse of solenoid → spiral ◆ Still head-on (mod xing angle) ? Yes for e+e-. No for e-e-. Problems still for e+e- : SR emittance growth (significant in some cases) Polarization vector rotation (minor problem?) e+e-B e+e- e-e-

DID and anti-DID ■ Align B with incoming e+/e- beams (on av.) : DID ◆ Solves SR emittance growth. ◆ ×2 Bt for outgoing beams → Worse pair background ■ Align B with outgoing e+/e- beams (on av.) : antiDID ◆ Pair background ~ 0mrad xing angle. ◆ ×2 Bt for incoming beams → Worse for SR emittance growth ~OK for 14 mrad, tight for 20mrad. e+e- BB e+e- BB DID or antiDID, not both simultaneouly

Detector Backgrounds ■ Pairs ◆ Direct : Important particularly for vertexing ◆ Indirect : backscattering to TPC ◆ DID or anti-DID or neither? ■ Muons ◆ Upstream muon spoiler ◆ Iron shielding on beampipe ■ Neutrons ■ 2-photon hadrons, radiative Bhabhas ■ Disrupted beam, beam halo, SR ■ What are detector telerances? → MDI session 3/11 ~10:30am

BDS for gamma-gamma ■ At least ~25mrad xing needed. ◆ Upgrade from 20mrad (14mrad also possible) ◆ 1.8m shift for detector + new tunnels for dumps. → 3/11 11am gamma-gamma MDI session, A. Seryi’s BDS (GDE) talk (3/9 17:30)

No Summary Please attend the sessions/talks and participate in discussions

Polarimeter (upstream)

Polarization Measurement R&Ds ■ Extraction-line polarimeter Backgrounds due to SR, disrupted beam, beamstrahlung, radiative Bhabas. Sensitivities to misalignments of spin vector, collision offsets. Compatibility with energy spectrometer. Sensitivities to crossing angles and DID. Detailed designs of Compton laser, IP and detector. ◆ Alternative laser : Fabry-Perot cavity