ILC Activities in Asia H. Yamamoto (Tohoku U.) LAL Orsay, May 2005.

Slides:



Advertisements
Similar presentations
TIME 2005: TPC for the ILC 6 th Oct 2005 Matthias Enno Janssen, DESY 1 A Time Projection Chamber for the International Linear Collider R&D Studies Matthias.
Advertisements

Selected topics from the recent GLD studies Akiya Miyamoto KEK 19 July, 2006 GLD lunch time meeting At VCLW06.
GLC Detector Geometry Y. Sugimoto. Introduction Figure of merit : Main Tracker.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
A new idea of the vertex detector for ILC Y. Sugimoto Nov
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
The GLD Concept. MDI Issues Impact on Detector Design L*  Background (back-scattered e+-, , n) into VTX, TPC Crossing angle  Minimum veto angle for.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
Gakujyutsu sousei ( 学術創成) JSPS funding ■ ILC detector R&D fund ■ GLD’s 3 detector componenets ◆ Vertexing ◆ TPC ◆ Calorimter (mostly HCAL) ■ + Optimization.
Introduction to Large/Huge Detector study 10. Nov. meeting in 7 th ACFA LCWS in Taipei Y. Sugimoto KEK.
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Report from WWS and charge to the workshop Hitoshi Yamamoto 3/3/05 KEK.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Summary of Simulation and Reconstruction Shaomin CHEN (Tsinghua University)  Framework and toolkit  Application in ILC detector design Jupiter/Satellites,
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Detector R&D for ILC Y. Sugimoto Mar Outline Detector for ILC Boundary Conditions Performance Goals Detector Concepts Milestones R&D of Sub-detectors.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
1 Report to Simulation Meeting 20 May, 2004 Akiya Miyamoto, KEK.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
JSPS Report Hitoshi Yamamoto Tohoku University. ILC detector R&D funds secured for the next ~4 years Worldwide Study R&D panel report, 2006/1 As of Jan.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
1 ILC Detector Activities in Japan Hitoshi Yamamoto Tohoku University IRFU Linear Collider Days, Sacley November 29, 2013.
Coil and HCAL Parameters for CLIC Solenoid and Hadron-calorimetry for a high energy LC Detector 15. December LAPP Christian Grefe CERN.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
Impact parameter resolutions for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
“Huge” Detector Concept 3 Sep 2004 ECFA LC Durham Satoru Yamashita ICEPP, University of Tokyo On behalf of many colleagues Towards our common.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
Software Status for GLD Concepts Akiya Miyamoto 31-October-2007 ILD Optimization Meeting References: - Y.Sugimoto, “GLD and GLDc”, talk at ALCPG07, ILD.
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
1 Design Activity of Large Detector for ILC July 18, 2007 Yasuhiro Sugimoto KEK.
1 ILD – A Large Detector for ILC Nov. 6, 2007 Yasuhiro Sugimoto KEK.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
12/20/2006ILC-Sousei Annual KEK1 Particle Flow Algorithm for Full Simulation Study ILC-Sousei Annual KEK Dec. 20 th -22 nd, 2006 Tamaki.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
SiD R&D Plan and Opportunities for New Collaborators
SiD Calorimeter R&D Collaboration
ILC Detector R&D in Japan
Detectors for Linear Colliders - ILC and CLIC -
Electron Source Configuration
Detector Optimization using Particle Flow Algorithm
Barry Barish Paris ICHEP 24-July-10
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
The MPPC Study for the GLD Calorimeter Readout
Sheraton Waikiki Hotel
Presentation transcript:

ILC Activities in Asia H. Yamamoto (Tohoku U.) LAL Orsay, May 2005

Machine

H.Yamamoto, France 2005/5 ITRP ‘Decision’ ■ August 2005 International Technology Recommendation Panel (ITRP) headed by Barry Barish recommended that LC be based on super-conducting RF technology. ◆... we are recommending a technology not a design. We expect that the final design be developed by a team drawn from the combined warm and cold linear collider communities...

H.Yamamoto, France 2005/5 LC Efforts Worldwide are Moving ■ Official name : ILC (International Linear Collider) ■ First ILC workshop : Nov at KEK ■ GDE director elected in Mar : Barry Barish ■ Timeline Second ILC workshop : August 2005 at Snowmass Good control of basic Linac configuration by end 2005 Report on needed machine R&Ds : end 2005 CDR with reliable costing : end 2006

H.Yamamoto, France 2005/5 LC Project Office at KEK ■ Organized ~ one year ago ■ Current members F. Takasaki (head) K. Yokoya H. Hayano N. Toge S. Yamashita Urakawa ■

H.Yamamoto, France 2005/5 Working Groups at KEK ■ WG1 Overall design (K. Kubo) ■ WG2 RF (H. Hayano) ■ WG3 Injectors (M. Kuriki) ■ WG4 Beam Delivery System (T. Sanuki) ■ WG5 Cavities (K. Saito) ■ Facility (A. Enomoto) ■ Site (R. Sugawara) Having regular meetings

H.Yamamoto, France 2005/5 Focus on Three Areas ■ Establishing the technology for 35 MV/m gradient ■ Pursue possible higher accelerating gradient : STF (Superconducting RF Test Facility) ■ Beam technology development using KEK-ATF : ATF, ATF2 (Accelerator Test Facility) ■ All effots are in collaboration with the other regions

H.Yamamoto, France 2005/5 ATF2 (extention of ATF) ■ Fully international collaboration KEK, SLAC, DESY, LLNL, BINP, LAL Orsay, UK Labs, and universities etc. ■ Goal : Establish stable beam size of ~35nm ◆ Use the small emittance of ATF (  y ~3 E-8m) Stable beam center of 2nm or less ◆ Bunch to bunch feed back for ILC type train ■ Good test bench even after ILC starts

H.Yamamoto, France 2005/5 ATF2 plan view

H.Yamamoto, France 2005/5 KEK 3-cavity BPM ■ nm mover, nm feedback ■ BPM, electronics Built at KEK:

H.Yamamoto, France 2005/5 ATF2 Timeline ■ Mini workshops Dec at KEK, Jan 5 at SLAC ■ Report (proposal) ~ May 2005 ■ Component production: autumn 2005 ■ Floor construction: summer 2006 ■ Start operation: Jan 2007 ■ Aim for 37nm end 2007 ■ Budget ~ $3M

H.Yamamoto, France 2005/5 ATF ■ Goals : Beam dynamics study (fast-ion instability, wiggler etc.) Beam diagnostics (laser wire, cavity BPM, etc.) Extraction improvement (coupling, stabilization) Development of fast extraction kicker ■ Achieved  y ~3 E-8m

H.Yamamoto, France 2005/5 ATF Configuration

H.Yamamoto, France 2005/5 STF (Superconducting RF Test Facility) ■ ILC Requires a large number of RF cavities Desirable to have multiple bases for Superconducting RF cavities (TTF2, SMTF, STF) ■ A building is allocated at KEK W/ test accelerator tunnel (~100m long) Currently used for J-PARC, to be evacuated this summer ■ Goals : Establish the technology for 35 MV/m gradient Pursue possible higher accelerating gradient Industrialization (cost reduction, mass production) Train young researchers and students ■ Joined Tesla Technology Collaboration DESY,SLAC,FNAL,Jlab,KEK,INFN-Milan/LNL,Cornell,PAL,IHEP

H.Yamamoto, France 2005/5 STF Covers... ■ SC cavities fabrication, surface treatment, tests ■ Cryomodule installation, alignment, input coupler, tuner mechanism ■ Power source modulator, klystron etc. ■ He plant high efficiency ■ Beam instrumentation ILC beam generation, BPM, etc. ■ Cavity surface treatment facility CBP, CP, EP, HPR, clean room

H.Yamamoto, France 2005/5 KEK Recipe for Cavity Fabrication PressEBWCBPLight CP AnnealingEPHPRBake This recipe pushed the Tesla TTF 9-cell cavity to near 40 MV/m. Even before ITRP decision - in parallel with warm LC R&Ds

H.Yamamoto, France 2005/5 STF Plans ■ Projects : Phase I (2005~2006) ◆ Establish reliable and stable 35 MV/m cavity with reasonalbe yield ◆ Provide data for 45 MV/m cavity ◆ Provide solutions to existing ILC-SC engineering ◆ Construct cavity treatment facility Phase II (2007~) ◆ Construct assymbly facility of cryomodule ◆ Assemble cryomodule ◆ Construct test facility of cyomodule ■ Smooth transition to organization under GDE when it is in place (→Phase II is quite uncertain at present)

H.Yamamoto, France 2005/5

■ Improved low-loss cavity ■ Now being tested ■ DESY,SLAC,FNAL,Jlab,KEK ‘Ichiro cavity’ 9-cell Cavity

H.Yamamoto, France 2005/5 Nb/Cu-clad seamless cavity Cost reduction (~1/3) and industrialization

H.Yamamoto, France 2005/5 Machine Summary ■ After the ITRP decision on technology, we have re- organized the entire LC R&D strategy ■ Three main areas are defined : Establishing 35 MV/m technology, pursue higher gradient, and utilize ATF effectively. ■ All efforts are conducted within the framework of international collaboration. (With GDE’s initiative in mind) ■ Collaborators are now flowing in: how about YOU?

Detector

H.Yamamoto, France 2005/5 History ■ 1992 : “JLC-I” report B=2T, R=4.5 m CAL : Compensating EM- and H-CAL, 2.5<R<4.0 m Trk : Small-cell Jet chamber, 0.45<R<2.3 m, L=4.6 m ■ 2003 : “GLC” report B=3T for pair bkg suppression Studies on TPC and digital calorimeters start ■ 2004 : Paris meeting. ITRP technology choice approaching → Re-optimization of the design concept based on JLC/GLC detector (‘large/huge’ or ‘GLD’ detector) ■ 2005 April Contact persons and executive board elected The official name : GLD

H.Yamamoto, France 2005/5 GLD Organization (still flexible) ■ Contact persons H.-B. Park, H.Yamamoto, G. Wilson, M. Ronan, R. Settles, M. Thomson ■ Executive board S. Yamashita - detector optimization A. Miyamoto - software/reconstruction Y. Sugimoto - vertexing H.-J. Kim - intermediate trackers R. Settles - central tracker T. Takeshita - calorimeters T. Tauchi - MDI H. Yamaoka - magnet/support M. Thomson - space/band-width watch dog

H.Yamamoto, France 2005/5 Performance Goals ■ Vertexing 1/5 r beampipe,1/30 pixel size (wrt LHC) : b,c tags... ■ Tracking 1/6 material, 1/10 resolution : tagged Higgs... ■ Jet energy (quark reconstruction) 1/2 resolution : W,Z separation...

H.Yamamoto, France 2005/5 Jet Resolution Strategy ■ Overall jet energy resolution  jet 2 =  ch 2 +   2 +  nh 2 +  confusion 2 +  threashold 2 If no confusion, ■ Fine granularity (ECAL, HCAL) ■ Reduce effective Moliere radius (ECAL) R m eff = R m (1+x g /x a ) ( R m =9mm (W), 16mm (Pb)) ■ And above all... xaxa xgxg

H.Yamamoto, France 2005/5 ■ Increase ECAL radius (R in ) to separate clusters Charged track separation  B R in 2 Neutral separation  R in

H.Yamamoto, France 2005/5 ECAL size (parameters not final) ■ Area of EM CAL (Barrel + Endcap) SiD: ~40 m 2 / layer Tesla: ~80 m 2 / layer GLD: ~ 100 m 2 / layer (JLC: ~130 m 2 / layer)

H.Yamamoto, France 2005/5 Tracking Strategy ■ Momentum resolution Use moderate B field of ~3T ■ Use TPC Low mass Good at high B Large number of samples

H.Yamamoto, France 2005/5 Basic parameters (all parameters not final) SiDTeslaGLD Solenoid B(T)54 3 R(m) L(m) E st (GJ) Main Tracker R min (m) R max (m)  m  7150 N sample  1/pt) 3.6e-51.5e e- 4

H.Yamamoto, France 2005/5 Basic parameters (cont’d) (all parameters not final) SiDTESLA GLD ECAL R in (m) BR in TypeW/Si W/Scint R m eff (mm) BR in 2 /R m eff X0X E+H CAL t (m) In order to utilize the good BR 2 /R meff, fine granurality is needed.

H.Yamamoto, France 2005/5 Overall Geometry

H.Yamamoto, France 2005/5

‘GLD’ is smaller than CMS

H.Yamamoto, France 2005/5 Issues ■ Can such a large magnet be built ? Will the field uniform enough? ■ Can ECAL/HCAl be supported ? By SC coil from outside ■ Cost of ECAL ? Use scintillator (SiPM readout?) ■ Moderate B field → larger r beampipe Vertex resolution good enough? ■ Will such a large TPC work? ■ Studies are on-going

H.Yamamoto, France 2005/5 Solenoid Field Magnetic field distribution Flux lines OK (Muon coverage?) Cost estimate : $~50M

H.Yamamoto, France 2005/5 Return Yoke Max. 1.8mm Max. 90MPa<120MPa Max. 7mm Max. 65MPa<120MPa End Cap Barrel

H.Yamamoto, France 2005/5 ECAL/HCAL Support 9mm t=40mm t=60mm t=100mm 2000tons Fixed 2000tons x 0.3G Fixed 9mm 125MPa Gravity ~ OKEarth quake ~ OK 118MPa<140MPa

H.Yamamoto, France 2005/5 ECAL Pb/Scint = 4mm/1mm 4cmx4cm tile (5X5 tiles)x24 layers Fiber readout

H.Yamamoto, France 2005/5 ECAL Beamtest results : 1~4 GeV  (E) = 16.3/√E  3.6%  (x) = 0.8/√E  3.2cm →Smaller tiles SiPM readout Sampling optimization Shower max layer Scintillator strip ECAL

H.Yamamoto, France 2005/5 SiPM (silicon photo multiplier) ■  m) 2 cell : limitted Geiger many cells/unit (~10000 ■ Vbias ~ 50 V ■ High B operation (5T OK) ■ Gain ~ 10 6 ■ Cheap (~$1/unit for mass purchase?) ■ Can be directly attached to scintillators (only electrical wires come out) ■ Noise?

H.Yamamoto, France 2005/5 SiPM Tests SiPM (Russian) ‘SiPM’ (Hamamatsu) cooled

H.Yamamoto, France 2005/5 ILC Calorimeter R&D in Korea ■ W/Scinti strip calorimeter (ECAL) ■ Simulation studies ■ Fabricate scintillator strips by extrusion ■ Develop and fabricate ‘SiPM’ in house (design work this semester) Kungpook National U, Seoul National U, SungKyunKwan U

H.Yamamoto, France 2005/5 TPC Beamtest in B Field Europe/Asia TPC collaboration (MPI, DESY, IPN Orsay + Asian institutions) ■ JACCEE SC Solenoid 1~1.2 Tesla Lage volume ■ MPI TPC ■ Wire or GEM ■ Study Diffusions etc.

H.Yamamoto, France 2005/5 TPC Beam Test (Preliminary)  x ~ 280  2000mm evenif  geom =0  m Long drift of GLD is (probably) OK

H.Yamamoto, France 2005/5 GEM Tests CERN GEM Biconial hole Fuchigami GEM Straight hole (Chemical etching) Possibly less discharges

H.Yamamoto, France 2005/5 GEM Test 23.5mm 1.5mm Drift region 1mm Readout pads x pad  x track GEM Pad response function

H.Yamamoto, France 2005/5 Vertexing Study ■ Layer-1 radius at 0.5% occupancy (pair bkg) : R1 = 1.92±0.03 cm (3T) R1 = 1.69±0.03 cm (4T) R1 = 1.55±0.03 cm (5T) 3T 4T 5T

H.Yamamoto, France 2005/5 Track Resolutions ■ Based on the R1 values at 0.5% occupancy ■ Tracker radius set to nominal SiD, Tesla, GLD values ■ Full simulation study on-going Impact parameter resolution Momentum resolution

H.Yamamoto, France 2005/5 Vertexing Detector Options : ■ Fine-Pixel CCD (FPCCD) 5x5  m 2 Fully depleted to suppress diffusion → same occupancy as before. Read out in train gap (no need to readout during train). Thinned to 50  m. Who makes it ? Needs an industrial partner. ■ Other options are being pursued (e.g. FAPS-like)

H.Yamamoto, France 2005/5 Intermediate Tracker R&D in Korea ■ 5 layers for r = 9 to 37 cm ■ 10 m 2 of Si strip detector (20  m resolution) n+ implanted p-stop in atoll via in hourglassreadout pad in staggering guard ring p+ implantedreadout strip N sideP side

H.Yamamoto, France 2005/5 Full Simulator (GEANT4) ■ Installation of a new geometry into a full simulator “JUPITER” is under way

H.Yamamoto, France 2005/5 Detector Summary ■ Large radius is diriven by cluster separation to optimize PFA. ■ Moderate B field (~3T) is used, and such a large coil can be built and seems capable to support itself and CALs. ■ Focus is on cost optimization of ECAL. Scintillator/W with SiPM ? ■ Such a Large TPC seems plausible. ■ Tracking and vertexing seem not to be sacrificed. ■ Detailed study based on full simulation and realistic reconstruction code (i.e. fully implemented PFA) is needed and work has just begun. ■ Needs more people to work on : please join in works in this direction!