H.-G. Moser, MPP project review, December 17, 2012 Belle & Belle II 1 Belle: ongoing analyses, papers Belle II: accelerator upgrade status Belle II detector.

Slides:



Advertisements
Similar presentations
2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
SuperKEKB Construction Plan Kazunori AKAI KEK 7 Feb Accelerator Review Committee.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
The Belle Experiment at KEK Christoph Schwanda Institute of High Energy Physics (HEPHY) Austrian Academy of Sciences Symposium Wissenschaftliche Kooperation.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
K.Furukawa, KEK, Nov Injector Linac Progress towards SuperKEKB Progress of Injector Linac Kazuro Furukawa for Injector Linac 1.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
The Belle II DEPFET Pixel Detector
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
ECLOUD’12 (the 5 th electron-cloud workshop) Kyo Shibata (on behalf of KEKB Vacuum Group) SuperKEKB Vacuum System KEK Tsukuba site SuperKEKB Linac.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
C. Kiesling, B2GM PXD Session, KEK, March , Towards a Neural z-Vertex Trigger for the CDC News from the DEPFET Collaboration New Schedule.
J.W. ASEPS KEKB Upgrade Plan: SuperKEKB J.W. Flanagan ASEPS
H.-G. Moser, MPP project review, December 14, 2015 Belle & Belle II 1 Belle, Belle II Introduction Belle II: accelerator upgrade status Belle II detector.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
1 Characterization of Pilot Run Modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik IMPRS Young Scientist Workshop Ringberg.
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Module Assembly - Overview and SWB bumping -
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 The Belle II Vertex Pixel Detector IMPRS Young Scientist Workshop July , 2014 Ringberg Castle Kreuth, Germany Felix Mueller.
Preparations on DEPFET gate-mode Operation with Hybrid 4.1.x 17. April Christian Koffmane 1,2 for HLL team 1 Max-Planck-Institut für Physik, München.
Belle II Science and Overall Project Tom Browder University of Hawaii.
H.-G. Moser, Advisory Board Meeting, July 2, 2013 Flavour Physics 1 B-Physics at Belle and Belle II Physics at B-Factories Upgrade at KEK: SuperKEKB and.
DEPFET workshop, Kloster Seeon, May 2014 Summary 1 Highlights Technical Coordination TB report schedule remarks.
H.-G. Moser, Jennifer Consortium Meeting, Rome, June 10-12, B factories - results and motivation for upgrade SuperKEB - how to reach 40x more luminosity.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
Belle II status and plans
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Status of HESR 18th March Gießen Dieter Prasuhn.
B2GM Sessions PXD I: Wednesday, June 6, 16:50-20:20
KEK news ( ) S.Tanaka.
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
The CSOI approach for integrated micro channels
Report on WP2 Activities
Hybrid Pixel R&D and Interconnect Technologies
Gated Mode - System Aspects
Gated Mode - System Aspects
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Large Booster and Collider Ring
Planning for the TDR KEK schedule: Technical Design Report (TDR)
The Belle II Vertex Pixel Detector (PXD)
Flavour Physics Belle II experiment at SuperKEKB Tsukuba, Japan
Injector Performance Requirements Conventional Facilities Update
LAL meeting on e+ studies, Oct. 2010
Presentation transcript:

H.-G. Moser, MPP project review, December 17, 2012 Belle & Belle II 1 Belle: ongoing analyses, papers Belle II: accelerator upgrade status Belle II detector upgrade Activities at MPP  DEPFET status  Gated mode  Mechanics & Assembly  Cooling Team Director: Allen Caldwell Project Leader: Hans-Günther Moser Staff: Laci Andricek, Jelena Ninkovic (Minerva), Christian Kiesling, Rainer Richter, Vladimir Chekelian, Andreas Wassatsch Postdocs: Jeremy Dalseno, Luigi Li Gioi PhD. Students: Veronika Chobonova, Christian Koffmane, Andreas Moll, Elena Nedelkovska, kolja Prothmann, Andreas Ritter, Martin Ritter, Pit Vanhoefer, Master Students: Fernando Abudinen, Felix Müller, Stefan Petrovics Sebastian Skambraks Technical Support: Karlheinz Ackermann,… HLL: Anastasja Plis, Martina Schnecke. ….

H.-G. Moser, MPP project review, December 17, 2012 Analysis of Belle Data 2 Final analyses using complete Belle data set (711 fb -1, 772x10 6 B-events) 2012: 13 papers with MPP members as authors, 3 more available as preprint Activities at MPP: published paper in prep. vv

H.-G. Moser, MPP project review, December 17, 2012 Analysis of   3 Decays highly suppressed -> high background level New analysis strategy: minimize cuts, use multi-variable fit instead => Improve sensitivity Excluded: 23.8° < Φ 2 < 66.8° Kolja Prothmann To be published

H.-G. Moser, MPP project review, December 17, Analysis of   Tree dominated, color suppressed decay 4 pion final state, large background (0.1% signal!) Helicity analysis to separate CP even & odd states Extract   using isospin analysis Pit Vanhoefer, presented at CKM2012 (  o -> 7.2 o )

H.-G. Moser, MPP project review, December 17, 2012 e- 2.6 A e+ 3.6 A To get x40 higher luminosity Colliding bunches e+ Damping ring New beam pipes & bellows Belle II New IR Replace beam pipes to suppress electron cloud (TiN-coated beam pipe with antechambers) Redesign the lattice to squeeze the emittance (replace short dipoles with longer ones, increase wiggler cycles) Reinforce RF systems for higher beam currents New positron capture section New superconducting final focusing magnets near the IP Low emittance electron gun KEKB to SuperKEKB Improve beam monitors and control system 5

H.-G. Moser, MPP project review, December 17, 2012 SuperKEKB construction 6 Calendar Japan FY ・・ ・・・ KEKB operation KEKB operation SuperKEKB operation Upgrade Linac operation for SuperKEKB, PF, PF-AR Upgrade Linac operation for SuperKEKB, PF, PF-AR Linac Belle II roll in QCS install Belle roll out Detector upgrade to Belle II Dismantling KEKB Fabrication and tests of ring components Install and set up DR tunnel MR & DR buildings Electricity and cooling facility Linac upgrade / operation for PF&PF-AR Nov Jan summer SuperKEKB Schedule

H.-G. Moser, MPP project review, December 17, e+ Damping Ring circumference 136m Injector Linac superKEKB construction beam pipes after baking and TiN coating. They are temporary stocked until moved to tunnel 100 new bending pipes are installed Tunnel construction for new bending ring

H.-G. Moser, MPP project review, December 17, Work on the upgrade/replacement of various sub detectors has started Belle has been lifted and prepared for a rotation into the new position with respect to KEKB Belle II upgrade

H.-G. Moser, MPP project review, December 17, 2012 Significant improvement in z-vertex resolution PXD: 2 layer Si pixel detector (DEPFET technology) (R = 1.4, 2.2 cm) monolithic sensor thickness 75 µm (!), pixel size 50 x 55 µm² to 50 x 85µm² (depending on layer and z) SVD: 4 layer Si strip detector (DSSD) (R = 3.8, 8.0, 11.5, 14.0 cm) 15  m 30  m Belle Belle II p  sin(  ) [GeV/c] σ [µm] PXD PXD+SVD Silicon Tracking Belle II 9

H.-G. Moser, MPP project review, December 17, Preferred scenario: SuperKEKB ready January 2015 commissioning without quads and solenoid till July 2015 commissioning with quads, solenoid & Belle II (w/o VXD)April 2016 PXD integrated with VXD standalone testsAugust 2015 PXD installed in Belle II summer 2016 Physics run starts end of 2016 Alternatively SuperKEKB could be commissioned with quads and w/o Belle & solenoid No consequences for PXD delivery, but physics would be delayed by a couple of months Commissioning

H.-G. Moser, MPP project review, December 17, 2012 PXD Schedule 11 Schedule follows sensor production: first sensors available in July > module/ladder assembly: November 2014-May > PXD integration: March 2015-May 2015 All other tasks (ASICs, cables, power, cooling, mechanics, DAQ, slow control) will be finished before end of 2014 (not critical)

H.-G. Moser, MPP project review, December 17, 2012 DEPFET Production 12 Finally we got the special SOI wafers we need in acceptable quality. First production batch with 13 wafers started in HLL in July one wafer has sensors for 1 inner and 2 outer ladders Nominal processing time (including thinning): 2 years Processing runs smoothly, ahead of schedule Second batch with 18 wafers will follow soon (unfortunately the engineer who should do the processing left, hire a new) Yield requirements: 20% for outer layer 27% for inner layer electrical dummy for electronic test Ready, needs to be assembled and tested

H.-G. Moser, MPP project review, December 17, 2012 Injection Noise & Gating 13 Sensor filled with hits from freshly injected bunches => ~ 20% dead time Gating : Sensor is made blind for a short time during high background (noisy bunch) Signals detected in the clean period before are preserved Simulations, lab tests with lasers and particle beams demonstrate feasibility of gating

H.-G. Moser, MPP project review, December 17, 2012 Verification with laser & beam 14 Inject (using a laser) 180k electrons (MIP: 6k electrons) scan clear voltage => 12V needed for complete shield Test storage capacity during gating Measure injected signal before and after gate => No losses up to 14V clear voltage Efficiency of gatingProtection of a signal Gating works! No changes to DEPFET sensor needed (no interference with current production) Some changes to ASICs needed (Switcher/DHP) System aspects (large instant currents during gating) currently under study  Additional capacitors needed (ca. 0.01% X 0 increase of average material) Decoupling 10nF Decoupling 100nF

H.-G. Moser, MPP project review, December 17, 2012 Support & Services 15 > 1 m Mechanics workshop: Design of support & cooling structure Complex service routing (long Kapton tapes & CO 2 inlets) Module assembly: Gluing of two modules to a ladder Soldering of Kapton tapes Service routing

H.-G. Moser, MPP project review, December 17, 2012 Cooling 16 2-phase CO 2 cooling Common project with ATLAS (pixel) MARCO (prototype) is being commissioned at CERN Will be shipped to Munich in January tested and certified To be used for beam test in October Main issue: replacement of PVSS control by EPICS IBBelle (final units) will be designed and built in Munich need two units for KEK one for ATLAS IBL

H.-G. Moser, MPP project review, December 17, 2012 Summary 17 Many activities in the analysis of Belle data could need more PhD-students (but positions limited, especially IMPRS) Upgrade of KEKB to superKEKB and Belle to Belle II progressing well PXD Sensor production has started and is running smoothly batch of 13 wafers in production since July 39 of 82 steps processed 2 nd batch (18 wafers) to be started asap Other system components progressing well Gated mode operation solves injection noise problem Delivery date of PXD: August 2015 First data taking: End of 2016 Belle II collaboration meeting in Bad Aibling, July 2012