Hartford Arena Roof Collapse.  January 18th 1978.  Snowstorm.  Roof plummeted 83 feet to the arena floor.  What caused the 300-x 360ft. roof to collapse?

Slides:



Advertisements
Similar presentations
A. T. Tankut Middle East Technical University, Turkey
Advertisements

Structural Steel Construction
Gantt Chart.
Design of Seismic-Resistant Steel Building Structures
Chapter-2 Parts of Steel Bridge.
Roof Framing A Quick Primer
Unless otherwise noted, the content of this course material is licensed under a Creative Commons Attribution 3.0 License.
Axial Members WORKSHEET 11 to answer just click on the button or image related to the answer.
Cold-Formed Steel History, Innovation and Design Jon-Paul Cardin, P.E.
Reinforced Concrete Design-8
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
The Hyatt Regency walkway collapse
LECTURE 7 CLAIMS RELATED TO SUB-CONTRACTORS
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
Skyscraper Construction
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Failure Analysis Breakout Session Comments. One Definition of Insanity Doing the same thing over and over and expecting a different outcome.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Connections and Bracing Configurations
Skilled Trades 1201 Floor Framing
Unit 50 Roof Trusses Truss Types and Components • Principles of Truss Design • Truss Fabrication • Installing Roof Trusses • Truss Safety.
Hip Rafters • Hip Jack Rafters • Constructing Hip Roofs
Buckling Critical Load Considerations
CTC / MTC 222 Strength of Materials
What is a Hallmark Modular Home? A Hallmark Modular Home is designed, engineered and built in the controlled environment of a modern factory. It is computer.
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
Unless otherwise noted, the content of this course material is licensed under a Creative Commons Attribution 3.0 License.
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
Reading Structural Drawings
Reinforced Concrete Design
FORMS, SCAFFOLDING and STAGING
7. APPROXIMATE ANALYSIS OF INDETERMINATE STRUCTURES
LRFD – Floor beam Unbraced top flange. Lateral Torsion Buckling  We have to check if there is plastic failure (yielding) or lateral-torsion buckling.
Spaghaper Design Project THE REPLACEMENTS THURSDAY, JULY 19, 2007 GROUP MEMBERS: Asia Johnson Elder Delaine TerMarKcus Smoot Joseph Childers.
Duquesne University Forbes Expansion
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Structural Engineering
MAE243 Section 1 Fall 2006 Class 2
 Balsa Wood Bridge 8 th. How Does a Bridge Stay Up?
Presented by the Wood Truss Council of America
L’Ambiance Collapse Group 15 David Lawlor Emma Quinn Daniel O’Sullivan Cian O’Sullivan.
Hartford Civic Arena Roof Collapse
L'Ambiance Plaza Collapse Bridgeport, Connecticut April 23, 1987
H ARTFORD C IVIC C ENTRE A RENA R OOF C OLLAPSE..
REVIEW LECTURE #1 KNOWLEDGE BASE REQUIRED: STRENGTH OF MATERIALS
Vietnam Institute for Building Science and Technology (IBST)
Framed Structures Luisana Hernández.
Competency: Draw wall sections and details
Airplane Hangar Design The design of a steel-framed airplane hangar Matthew Klein Edward F. Cross School of Engineering, Walla Walla University, College.
Group 8 Façade failure of the John Hancock Building.
Group 16 Ian Bray Aodhin Mc Bride John McElwee. Background Collapsed January 18 th 1978 – 5 years after construction Large snowstorm caused heavy loading.
DEPARTMENT OF MECHANICAL AND MANUFACTURING ENGINEERING
Wood Frame Systems Civil Engineering and Architecture®
Gantt Chart Presentation Name Course Name
Long Span Truss Installation
Competency: Draw wall sections and details
Design of Steel Beams Dr. Bashar Behnam.
Buckling & Stability Critical Load
Columns and Other Compression Members
Wood Structures Topic 8 Quality Workmanship
4th Annual Construction Law Summit
Buckling & Stability Critical Load
Competency: Draw wall sections and details
سیستم های ساختمانی پیشرفته (2)
Gantt Chart.
Structure is a device for channeling loads that result from the use or presence of the building in relation to the ground. All physical objects have structures.
Design of Steel Beams Dr. Bashar Behnam.
Wall and Ceiling Construction
Building Construction
Presentation transcript:

Hartford Arena Roof Collapse

 January 18th  Snowstorm.  Roof plummeted 83 feet to the arena floor.  What caused the 300-x 360ft. roof to collapse?  Could this disaster have been prevented?  Who was responsible?

Technical Factors  The space frame roof was designed by Fraoi, Blum & Yesselman.  Roof consisted of two main layers.  30-ft diagonal bars, braced in the middle by a layer of horizontal bars.  The 30-ft bars in the top layer also braced.

Several factors.  The design for the space frame roof used cruciform section, which has a small radius of gyration.  The horizontal bars intersected at different points than the diagonal bars making the structure particularly liable to buckling.  The computer analysis used did not take buckling into account.  Compression members in the top layer were significantly overloaded. Up to 852%

 Differences between designs and the as built structure.  Reducing connections strengths.  Only half of the bracing specified for the exterior rods was used and interior rods were only partially braced.

Human & Managerial Factors  The guilty people, engineers and construction managers.  Contract was divided into 5 subcontracts.  Construction manager in a coordinating role.  Uncertainty about who was responsible for certain aspects.

 Qualified structural engineer oversee the construction.  Construction manager refused, waste of money.  The engineers were notified of excessive deflections in the roof of the arena on a number of occasions.  They dismissed the concerns saying that discrepancies between the actual and theoretical values were to be expected.

 Subcontractor questioned deflections. difficulties while fitting steel frame construction, difficulties while fitting steel frame construction, “deal with the problem or be responsible for delays”. “deal with the problem or be responsible for delays”.  Year after, a member of the public notified the engineers of his concern at the distinct downward deflection in the roof. “everything is fine”

 Connections were not assembled according to the designs.  Reduced strength.  American Institute of Steel Construction code violated.  Bad management or incompetence on the part of the engineer.

Lessons Learned.  Save money, innovative design and state of the art computer analysis.  Several agencies were employed to illuminate the cause of the collapse and attribute the blame accordingly.  Roof began failing as soon as it was completed due to design deficiencies.  Torsional buckling as opposed to lateral buckling.

 Six years after, out of court settlement.  “Should one man / contractor hold ultimate responsibility for such a project and do too many cooks spoil the broth?”  The roof designed was not the same as the roof built.  Computer programme is only as good as its programmer. In this case the programme in question did not take buckling into account.  More care with the design & redundancy employed, the failure of a few members would not have resulted in this huge collapse.

 A second opinion needed.  Peer reviews are an essential safety measure.  “Cut corner” project.  It raises the question whether the factor of safety should be increased for buildings of high occupancy?

Space Frame Roof Section of Roof