BIM & FM in Hong Kong Public Rental Housing Projects.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Building Information Management (BIM)
Project Planning: Assembling a Mortenson “Integrated Work Plan”
The implementation of the eWISA Water Care Assistant Flip Human Water Care Works Elize Marè.
1 Belene NPP Project Configuration Management Presented by Alexey Matveev Varna, May
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
ICASAS305A Provide Advice to Clients
BIM Sarah Birchall and Jo Harris 25 th September 2014.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Process Engineer’s Role in Project Management Dr Abdullah Malik.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
The BIM Project Execution Planning Procedure
Introduction to BIM BIM Curriculum 01.
FundingPro  Trust Funding Software System Advanced Planning Solutions, LLC (877) 891-FUND © 2003 Advanced Planning Solutions,
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
Construction Project Management: Technology driven answers for schedule and budget savings.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
© 2012 Excitech Ltd IFC for Revit Users Excitech.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Formats ACT 380.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
Project Execution Planning for Building Information Modeling Progress Meeting #2 – July 29 th, 2008 A buildingSMART Alliance project sponsored by: The.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V.
The Benefits of Using BIM Software in Building Design and Construction By Jared Heber.
RUTGERS INTELLIGENT TRANSPORTATION SYSTEMS INSPECTION AND MAINTENANCE SOFTWARE (RITSIMS) NJDOT TRAINING CASE STUDY.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
2004/051 >> Supply Chain Solutions That Deliver Users.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
EastCoast CAD/CAM IFC COBie Plus (via Fabrication for AutoCAD MEP) David E. Quigley, Chief Operating Officer Keith Brown, MEP Consulting Engineer 2013.
TOKMO and COBIE Igor Starkov President Tokmo Solutions, Inc.
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
Quicx developed by Chinook Systems Inc. David Wampler, Software Manager Wanda Lenkewich, Owner 2014 buidlingSMART Challenge107-Jan-14.
EcoDomus PM Data Management Igor Starkov President EcoDomus, Inc.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
Models and COBie Templates Mariangélica Carrasquillo-Mangual Research Civil Engineer Construction Engineering Research Laboratory.
Dana K “Deke” Smith FAIA Birgitta Foster Executive Director Assisting Director buildingSMART alliance 1.
CAB Technical Committee BIM Working Group
Company: EcoDomus, Inc. Product: EcoDomus PM
The Design Team Carl James.
Supporting quality devices
BIM EXECUTION PLANNING PROCESS
SPEAKING THE SAME LANGUAGE: Ensuring a smooth lab turnover, from construction to operations John Ott  Introduce Presentation topic and us.
RIBA Plan of Work 2013.
Project Execution Planning for Building Information Modeling
2013 COBie Challenge for Facility Managers
Copyright Scott Bloss, All rights reserved.
LCI – Supply Chain Collaboration
Document Handover Training Session
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
BIM EXECUTION PLANNING PROCESS
Product Development Scenario Overview
Your Facility Your Information
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
DBIA Manual of Practice
RIBA Plan of Work 2013.
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

BIM & FM in Hong Kong Public Rental Housing Projects

BIO

Outline  BIM Application in USA, UK and other countries  BIM Application in Hong Kong  Interview  Case Study  A new process for BIM-combined construction  Frameworks for preparing as-built BIM model  Maintenance of BIM model in whole lifecycle  Suggestions

BIM Application in USA, UK and other countries  The U.S. is the first county to apply BIM. The U.S. General Services Administration (GSA) has published series of BIM guide and National 3D- 4D-BIM Program and applied them in more than 35 projects.  The U.S. Army Corps of Engineers (USACE) planed to achieve full operational of BIM no later than  Pennsylvania State University (PSU) developed a BIM Project Execution Plan on July 2010, which was a product of the buildingSMART alliance Project. The facility data like level of development (LOD) and data standard structure COBie were suggested to be defined for facility management.  In UK, Cabinet Office published the Government Construction Strategy in May 2011 and annunciated that it will coordinate government to enable all members of the supply chain to work collaboratively through BIM.

BIM Application in Hong Kong  Since 2006, in Hong Kong, more than 19 public rental housing projects have adopted BIM in their design and construction stages.  Hong Kong Housing Authority (HA) also developed their in-house BIM standards and user guide for guiding the architect and engineers to use BIM properly during design stage.  Hong Kong establish Institute of BIM and held BIM conference every year.

HA Contract Requirement  The following additional will be incorporated into the as-built BIM model prior to handover fo facility management. -Room number and building name, staircase number, washroom number, lift lobby number; -Door Schedules; -Window Schedules; -Roofing System; -Fresh & flush water supply system, drainage system for building blocks and underground; -Other textual information subject to agreement of facility management at later stage; eg. Planter number, green roof number; -Retrieval of building services system installation information by hyperlink to related folder of data bank. -Data Rich As-Built BIM Model for facility management

How to combine BIM&FM ?  Step 1 Build the BIM models and make sure it consistent with as-built drawings  Step 2 Sorting the BIM models and add necessary parameters to components and equipments in BIM model.  Step 3 Export NWC format from BIM model.  Step 4 Build up a Naviswork FM platform for facility management.

What do main contractors and sub-contractors do in handover stage?  Main Contractors:  Make sure all the as-built drawings consistent with reality  Gather all the FM information from sub contractors in time  Sub-contractors:  Provide all the equipments/Materials’ catalogues and Warrant Information  Provide equipments layout with Ref. number mark up  Provide contract required equipments TC reports  Provide contract required equipments Operation Manual

Procedure for Preparing As-built Model BIM Team raise up the Input Data Set Contractor should prepare information such as catalogues, drawings and supplier contact. Input Data Set includes information being input in the BIM model such as geometry information of models, catalogue and quantity schedules. Discuss Input Data Set with Owner/FM Managers During Construction Period, BIM Team collect information from Contractor and sub-contractor In BIM model, clicking on a object will bring up its catalog, supplier and the mobile number of the servicing staff. During As-built Period, BIM team take photos on site and make sure the as-built model consistent with reality. Contractor must leads BIM team to finish this inspection. BIM team finish the as-built model and submit to Housing Authority for checking. Contractors and BIM team has the same responsibility on as-built model. Facility Management Period Lifecycle management

Using Navisworks to Set Up FM platform  BIM can help facility professionals:  Space Management  Facility managers can build a detailed and accurate space inventory based on BIM models, helping clients make more efficient use of their real estate and significantly reducing costs.  Maintenance Management  Facilities professionals can access BIM model to obtain accurate FM information for each equipments efficiently, having accurate as-built information to reduce the cost and time required for renovations  View floor plans and 3D views from BIM models  Helping clients understand how they use space and quickly locate building equipments. Fast then traditional method of searching CAD drawing.

ComponentsEquipments Each of equipment should have serial number Components like pipes, ducts, cable trays, trunkings only need to provide geometry information and routing layout. Both of the components and equipments can be seen in the 3D visual environment. Facilities

Equipments Library 1.Save all the Equipments in Library 2.Naming the Equipments (Each of equipment should have its own equipment number) 3.Input the Equipments Value (in BIM software) -Equipment No. -Location (Floor, Room) -Manufacturer -Startup Date -Warranty Expiration Date -Status -Repair History -Link Documents

FM Manager can access the geometry information and other material information in Navisworks interface. Navisworks provides CSD view for each floor. Navisworks 3D Interface

Navisworks also provides 3D views for each floor. Facility manager can easily access the pipe or duct information by clicking the component in 3D views.

 Add FM demo Pictures

File Submission FM Submission:.nwd format  Whole Building (ARCHI + SE Model)  Whole Building Drainage System + Plumbing System  Each Floor Model (Combined Service Model + ARCHI+SE Model)  Critical Place Model (optional) *Each model link with equipments catalogue, TC report or operation manual, detail information please refers to contract requirements.

Challenges Forward  Challenge I:  Updating FM model is not allowed in Navisworks Platform  Solution 1:  Outsourcing BIM model Updating Work to BIM consultant  Solution 2:  Housing Department trains its own operation staffs to update BIM models and Navisworks FM platform processes to maintain the building information

Challenges  Challenge II:  Exsiting CAFM Software can’t import BIM information  Solution 1:  Follow U.S. BIM guideline and install new CAFM software which can import COBie format.  Solution 2:  BIM consultant write plug-in to export data rich IFC format which can be imported by existing CAFM software.