LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 2 Departure for CERN 24/07 with delivery originally.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
After the foundations have been completed the walls are set out and construction commences. wall structures.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
High Power Hg Target Conceptual Design Review Hg Target Interface with Solenoid V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
Plain & Reinforced Concrete-1 CE-313
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
Cavity support scheme options Thomas Jones 25/06/15.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
Importer Security Filing and Additional Carrier Requirements “10+2” Program.
Discovering Maritime Transportation. Significance of the Industry  Transport roughly 14% of total national freight  26.5% of total domestic ton-miles.
Absorber Production Status Contents (1)MICE absorber design/status (2)MICE absorber instrumentation (3)Schedule (4)Summary Sasanqua at KEK on 13-DEC,’09.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
LAV damage and repair – M. Moulson (Frascati) – Photon Veto WG – CERN – 5 April 2011 Damage to A3 during transport 2 10 blocks were broken during transport.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 14 December 2010.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Metalex First Article Undulator Shipment from ANL to SLAC 6/9-12/06 Details: The Undulator Segment was Bolted to the Bottom of the Shipping Crate Using.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
BANDSAWS CUTTING CAPABILITIES 1. Shearing is a metal fabricating process used to cut straight lines on flat metal stock. During the shearing process,
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
LARP Collaboration Meeting Racetrack Coil Fabrication
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
4. Local strength calculation
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Date of download: 11/12/2016 Copyright © ASME. All rights reserved. From: Natural Frequencies of Plate Supported Thermowells J. Pressure Vessel Technol.
SPL RF coupler: integration aspects
LAV HV repair plans Matthew Moulson
Schedule for the FAIR Antiproton Target
LAV front-end and readout status
Subject :- Manufacturing Processes-1
Gingin Advisory Committee Meeting 08 Dec 2009
COMMON RAIL FUEL INJECTION SYSTEM
PP 14° Bi-Weekly meeting S1-Global, June 1, 2009
LARP Phase II Secondary Collimator RC-0 and RC-1
STEEL PLATES.
SNS Coupler Shipping Plans
Presentation transcript:

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 2 Departure for CERN 24/07 with delivery originally scheduled for 25/07 Container width ~ 3.5 m Width > 3 m = Wide Load Need police escort! Mount Blanc Tunnel shut down both directions 10 km/h in tunnel Window for tunnel transit 0:00-5:00 on 25/07 Afternoon of 24/07: Tanker truck spills acid on A5 south of Ivrea A11 reaches Mont Blanc Tunnel at 08:00, not allowed through 24 hour delay – truck parked in shade

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 3 Many problems with ShockLog data recorders After firmware upgrade, battery life = 2 hrs No data for both A7 and A8 transports Only 1 monitored shipment with shipping container (A6) No temperature data with thermal blanket Problem resolved by using 3.6V 2600 mA LiSOCl 2 batteries Excellent thermal stability over nearly 48 hrs

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 4 Acceleration data [g] − transverse − vertical − longitudinal Oversize load rules (> 3 m) Max speed 80 km/h Smoother transport than even for A6

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 Status of A9, A10 vessels 5 Plate steel for A9 cylinder: Ordered from Outokumpu (CR) 2 plates, 9 m long, 40 mm thick, 304LN (stabilized in nitrogen) Characteristically low permeability (μ/μ 0 < 1.05) Usually very expensive (€17/kg ~ 4× cost of 304L), but highly discounted Flanges: Ordered from a foundry near Varese Forged 304L, to be solubilized after forging to obtain low μ/μ 0 Production will be monitored 200-mm nozzles: Cut from whole steel on cannon mill, can be solubilized if needed All material should be delivered by end of Sep 2012 A9 vessel delivery: late Jan/early Feb 2013 A10 vessel delivery: late Jun 2013

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 Status of A9, A10 vessels 6 3 points in azimuth 6 points in z μ/μ 0 = for all points except one (1.012) Measurements of μ/μ 0 for 2700 mm length of 304L for 200-mm ISO-F nozzles

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 Preparation of blocks for A9 7 Goal is to prepare all bananas for A9, A10 before arrival of vessels Laboratory space re-arranged for construction of blocks and bananas 81 of 240 blocks complete for A9