11
22 BBeyond established in HengGang District of Shenzhen in BBeyond built factory and start mass production in KengZi Town in Mar TThe capability is only 20 thousand Sqm/month in 2006 and it is expanded to 70 thousand Sqm/month in TThe lamination process is made preparation in Apr and started to mass production the same year in August. MMake preparations for JiangXi Beyond PCB Industrial Zone in GanZhou City in The floor space is 100 thousand Sqm. The buildings are finished at the end of Year We will start produce in the end of Oct There are 2 phase constructions. The 1st phase is to produce 6-8 layers PCB 60 thousand Sqft/month. The 2nd phase is to produce HDI PCB 40 thousand Sqft/month from Company Development Evolution
33 Graphic design of Ganzhou Beyond
44 Plant side of Ganzhou Beyond
55 Produciton workshop of Ganzhou Beyond
66 Organization Structure Board of shareholders Board of Directors President Shenzhen BeyondGanzhou BeyondMarketing CenterPurchasing CenterFinancial CenterHR Center Korea Branch BNP co., Ltd
7 Staffing tables Shenzhen Beyond Sci-tech Co.,LTD Ganzhou Beyond Sci-tech Co.,LTD First phase 500 staffs. It will be started from Otc The capacity of 2 plants will be 110 thousand Sqm monthly. Production Department QC Department CAM Department Marketing and Sales Department HR, Purchase & Finance Department Total
88 Capacity Growth
99 Turnover Turnover (million USD)
10 Product Distribution
11 Process Capability ItemCapabilityItemCapability Material FR-4 Line width/space 4MIL/4MIL(out layer) Halogen Free3.5MIL/3.5MIL(inner layer) Aluminum base(1L) PSR Registration Accuracy MIN 1.5MIL Ceramic base Surface Finished HAL TG 130 ~170 ℃ HAL Lead Free Finished Board Thickness 0.3~2.5mmImmersion Gold/Tin/Silver Inner layer Board Thickness 0.1~1.5mmOSP Lamination4~12 layers Outline Tolerance Punching ±0.1mm Min Hole size0.2mmCNC Routing ±0.13mm Hole Diameter Tolerance ±0.075mm Board Size Limited V-Cut: 80~460mm Plating aspect ratio 8 : 1No V-Cut: No limited
12 Lead Time LayersSampleMass Production Double Sides3~4 Working Days7~10 Working Days 4-Layers7~8 Working Days 12~14 Working Days 6-Layers8~10 Working Days14~16 Working Days 8-Layers10~12 Working Days15~18 Working Days
13 Market Distribution Main domestic customers : Wasion, Xuji, Kaifa, Hisense, BYD etc. Overseas meter customers : AFZAR, AR, KOHLER, MAKSAY etc. Main Japan customers: SHARP, NINTENDO, TESMIK, KAYBRIGHT etc. Main European customers: BOSCH, HOCHIKI, BASELECTRON, GRAYHILL etc. Main Korean customers: SAMSUNG, LG, KIA, DAEWOO, BNP etc.
14 Production Equipment Laminate machine Drilling PTH
15 Production Equipment Routing Pretreatment Developing OSP Auto V-cut
16 Test Equipment E-test AOI Impedance Test Ion Pollution Tester
17 System Certification No. : E UL certification TS16949 : 2009 No. : ISO14001 : 2004 No. : ISO13485:2003 No. : Year 2004………UL certification Year 2008………TS16949:2009 Year 2012………Cleaner Production Year 2012………ISO14001:2004 Year 2012………CQC 3C certification Year 2015………ISO13485:2003 Year 2004………UL certification Year 2008………TS16949:2009 Year 2012………Cleaner Production Year 2012………ISO14001:2004 Year 2012………CQC 3C certification Year 2015………ISO13485:2003
18 Customer List Meter & InstrumentAuto Power SupplierSecurity System Vehicle Carries Medical Equipment ChargerComputerCopierDVB
19 The China head office Laura (肖雪) Overseas Customer Manager Shenzhen Beyond Sci-tech Co.,LTD Building 2, ShaLi Industrial Zone, ShaTian Country, KengZi Town LongGang District, ShenZhen City, GuangDong, China Mobile : Office Tel: Office Fax: Skype: laura-pcb-beyond The Korea sales office (BNP) Mattia yang (양원준 차장) sales Manager C-110, , Songhyun-dong, Dong-gu, Incheon, Korea Mobile : Office Tel: Office Fax:
20