Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF ODH Discussion How to avoid ODH2 conditions? August 5, 2015.
Software Tools for Operations and Maintenance Planning Theo Larrieu, Steve Suhring.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 31, 2015.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker October 21, 2015.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Re-scoping UITF Matt Poelker November 14, 2015.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design Update Puck and Gun Magnet February 16, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker April 12, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker February 23, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Internal Personnel Safety Review UITF Overview and Introduction Matt Poelker.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
UITF Laser and Gun High Voltage John Hansknecht UITF Operational Review March 18, 2016.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
ELENA installation progress F. Butin / ELENA collaboration.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 12, 2016.
LCLS-II Technical Requirements
RF Systems and Controls for the LERF CM Tests
CBETA Technical Review
ELENA installation and commissioning status
UITF – Upgrade Injector Test Facility
CEBAF Injector Update PREX/CREX March 3-4, 2017
Why are we removing our very good gun?
UITF Project Status Meeting
UITF Project Status Meeting
UITF Operational Review
Upgraded Injector Test Facility
Upgraded Injector Test Facility - UITF
Electron Source Configuration
Center for Injectors and Sources
Upgraded Injector Test Facility
LERF Readiness Review: Charge
A. Freyberg Aug 2016 ECT’16 =>
Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.
Test of Booster at UITF Reza Kazimi (12/12/18)
Polarized Source: Recent Activities
ISRC and LEBT Vacuum System Design
Upgraded Injector Test Facility
(Beam) Commissioning Plan
UITF Conduct of Operations Review
UITF Conduct of Operations Review
LCLS e- Beams System Overview
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF

Thomas Jefferson National Accelerator Facility Page 2 UITF Progress meeting

Thomas Jefferson National Accelerator Facility Page 3 UITF Progress meeting Charge Codes! Facilities ITFPTB UITFBL ITFCRY Facilities Cryo Infrastructure including some RF Polarized Target Beamline UITF

Thomas Jefferson National Accelerator Facility Page 4 UITF Progress meeting Cave 1 electric and network complete NEXT: Clean off ledge and move IPC Status Facilities

Thomas Jefferson National Accelerator Facility Page 5 UITF Progress meeting Status Facilities Precast concrete bids to arrive soon – this package includes bracing and means to secure 2 nd layer

Thomas Jefferson National Accelerator Facility Page 6 UITF Progress meeting Facilities (T. Renzo)

Thomas Jefferson National Accelerator Facility Page 7 UITF Progress meeting Facilities Tasks and Timeline February 2016 Cave1 electrical work complete Facilities has issued PR for Cave2 concrete and bracing, out for bids March Installation Group willing to secure Cave2 structure, install other utilities April Facilities moves IPC outside Cave2 Concrete for Cave2 arriving on site, installing it Physics installs 2nd layer of concrete, adds bracing May Cave2 including labyrinth complete, roof not yet installed June Facilities focus shifts to utilities inside Cave2: electricity, lights, fire suppression, gate July Facilities continues to work on utilities inside Cave2: electricity, lights, fire suppression, gate August Facilities completes utilities inside Cave2: electricity, lights, fire suppression, gate, entire Cave2 roof installed. All bracing complete Facilities provides power to big Bertha from diesel generator (this could happen later, since no Beam to HDIce until Jan 2017)

Thomas Jefferson National Accelerator Facility Page 8 UITF Progress meeting Installed transfer line, leak checked OK Purchased a turbo pump for leaky shield line Building the heat exchanger Controls getting worked Status Cryo Group

Thomas Jefferson National Accelerator Facility Page 9 UITF Progress meeting Met with Cryo, SRF, RF, and Kazimi of Ops Discussing relief valves from ODH point of view Who does what? e.g. Cryo makes u-tubes and SRF stabs them, Cryo pulls cables, SRF provides connectors Expect 8 MeV beam with available klystrons Status New ¼ CM Test at CMTF June Install at UITF July

Thomas Jefferson National Accelerator Facility Page 10 UITF Progress meeting Cryo, SRF, RF and new 1/4 CM Recall, we agreed on means to “park” the ¼ CM when not accelerating beam: circulate 80K LN2 through 35K shield line. UITF should not be a burden on CTF 34 wks per year LN2 temp could fluctuate 80 to 100 K, no problem for parking but…. How to cool HDIce? I think we are leaning toward CTF connection… Nagging ODH assessment is “nagging” because some issues were ill-defined: parking strategy and relief valves New ¼ CM requires waveguide tuners Chad Seaton building the high power rf control board Next biggest issue: designing the waveguide layout

Thomas Jefferson National Accelerator Facility Page 11 UITF Progress meeting Gun HV power supply installed inside SF6 tank, very little corona at 60 psi Gun table and 80/20 keV beamline structure moved into place NEXT: add gun HV chamber, install big beamline elements, buy stuff…. Status Gun Group buncher HV power supply Barrel polished in 2 days

Thomas Jefferson National Accelerator Facility Page 12 UITF Progress meeting Gun and Beamline at GTS

Thomas Jefferson National Accelerator Facility Page 13 UITF Progress meeting

Thomas Jefferson National Accelerator Facility Page 14 UITF Progress meeting Yan Wang’s POISSON simulations validated by Fay Hannon using CST 3D field mapper Status Gun Group 11 MV/m 8 MV/m

Thomas Jefferson National Accelerator Facility Page 15 UITF Progress meeting The new gun happy at 325 kV, stopping at this voltage for now. Shifting focus to building the beamline and photocathode deposition chamber (LDRD magnetized beam tests) Building the electron gun at LERF GTS

Thomas Jefferson National Accelerator Facility Page 16 UITF Progress meeting Status Operations Network switcher hardware installed Computer terminals installed in control room 6100 IOCs ordered, but we can use older IOCs if needed sooner Groups are installing hardware in racks, and conversations have started with Software (Scott Higgins our POC)

Thomas Jefferson National Accelerator Facility Page 17 UITF Progress meeting Status Engineering I&C building stripline bpm electronics DC power prep-ing magnet racks, pulling cables RF control boards in fab RF group building second water skid RF group building the klystron control panel Safety System Group on track, ODH and PSS Installation Group done with Cave1, can help with Cave2 when it makes sense

Thomas Jefferson National Accelerator Facility Page 18 UITF Progress meeting Status Reviews UITF Accelerator Review: where beamline design is reviewed by Ops/CASA/SRF, March 18, 2016 Geoff Krafft, Mike Spata, Reza Kazimi, Arne Freyberger, Todd Satogata, Bob Rimmer Need to send out pre-review material soon: beamline design, optics envelope, machine protection Safety Systems Review, May 2016 Machine and Personnel, including radiation protection SCMB? UITF Readiness Review, August 2016 Commissioning and Operations plans Experimental Readiness Review, December 2016 Focused on HDIce Documents: FSAD, mini-AOD, ESAD

Thomas Jefferson National Accelerator Facility Page 19 UITF Progress meeting Status HDIce Lots of scattering at MeV energy. Beam size very large at target. Decided to flip the orientation of the target Cave2 design seems fine either way, need a Physics designer to be responsible for installation at UITF Target here Upstream radiation baffle blows up beam In this configuration, we can achieve desired small beam size at target Target here, better e-beam

Thomas Jefferson National Accelerator Facility Page 20 UITF Progress meeting Status HDIce Stripline BPMs see 7nA beam with 1 Hz integration time. But we want to see 1nA beam, or even less at UITF. Don’t want to fly blind

Thomas Jefferson National Accelerator Facility Page 21 UITF Progress meeting Status HDIce Need to work out details with HDIce and T. Allison, J. Musson I peak I baseline Acceptable duration of high peak current: long enough to see but not long enough to depolarize

Thomas Jefferson National Accelerator Facility Page 22 UITF Progress meeting Monthly Meeting with Mont Purpose: to inform Lab Leadership of the UITF status Action Items (from previous meetings) Project Update –Progress Update –Milestones Update –Budget Update –Highlights & Concerns –Next meeting agenda

Thomas Jefferson National Accelerator Facility Page 23 UITF Progress meeting Major components Facilities Engineering Mech Design Installation Cryo Safety Systems I&C DC Power Low Level RF systems High Power RF Survey & Alignment SRF Build new ¼ CM Commission with RF Operations Network and communications Progress Update Green means we can see progress

Thomas Jefferson National Accelerator Facility Page 24 UITF Progress meeting Major components Source Group Reliable 350kV ops Beam to cup in front of ¼ CM Beam to cup in front of HDIce EHSQ Shielding approval, ODH assessment Global hazard review FSAD Accel Readiness Review Commissioning Plan HDIce Installation at Cave Beam on HDIce Progress Update Green means we can see progress