CLIC activity of S. Iija 16.02.2012 16 Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work.

Slides:



Advertisements
Similar presentations
The No Child Left Behind Act and Title 1 Schools What Parents Should Know and Do.
Advertisements

1 [12-Feb-2014] «BE-RF-PM» CLIC TBM Prototype Status update EDMS №[Number] Dmitry Gudkov 1.
CE Regulation Service PROLAB Tech Rev 1 Machinery Directive Flow Chart A brief guide.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
CLIC activity of Jukka Väinölä Feb 20121J. Väinölä, BE-RF-PM.
New test structures: Status report and technical documentation review
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
«BE-RF-PM» Updates on thermal tests for CLIC prototype module type 0 Ioannis Kossyvakis, Roberto Mondello, Fabrizio Rossi.
Project management tools Tiia Uusimäki. Agenda Activity Planning Tool and Earned Value Management – Why are the tools needed? – Activity Planning tool.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
How can Title I money be used? Districts, schools, and parents and have a lot of choice in how they set up their Title I program, as long as it helps.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
FAO/WHO CODEX TRAINING PACKAGE SECTION TWO UNDERSTANDING THE ORGANIZATION OF CODEX Module 2.5 How do Codex Committees function?
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Agenda : CLIC Civil Engineering and Services (CES) WG.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CERN Accelerating science Indico and Invenio José Benito González López
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
TBTS Test Program & Schedule G. Riddone
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
CLIC activity of R.Raatikainen Feb 20121R.Raatikainen BE-RF-PM Main tasks  Thermo-mechanical modeling of the CLIC/LAB two-beam modules 
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
1 12-February-2014 BE-RF-PM CLIC MODULE Preparation for the duty cycles Written by: Elena Daskalaki Checked by: Alexander Samochkine Approved by: Germana.
Dmitry Gudkov BE/RF CLIC Module Working Group Test Module Type 1 (LAB). Design and integration. 3D model Ref: ST
1 Quality Assurance Working Group Membership and functioning described in the document LHC-PM-QA "Quality Assurance Policy and Project Organization”.
«BE-RF-PM» 1 Wire Ø0.08mm CLIC TBM Booth Posters Modules Line (1:10) AS and PETS samples RF components, vacuum equipment Supporting, magnets,
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
CLIC activity of W. Zhou Feb 20121W. Zhou, BE-RF-PM Procurement Quality assurance.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
Prepare to Build Module 4: Student Course Requests Learning Event Conference Call Info: Access Code: # *6 to mute your phone, *7.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Service Section Technical Training Dec 2005.
2_20_ISA8895_Structure_HumanAsset
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Collaboration New collaborators in 2016:
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
: القسم 21 إجراء المقابلة التحفيزية.
الجزء 22:المقابلة التحفيزية
Prepare to Build Module 3: Scenarios, Time Structure and Rotations
Thermal test (lab modules)
E. Manola-Poggioli 05 December 2001 EDMS doc
Tucson Unified School District
Please ONLY apply if you have the Essential skills
IT Managed Services Transition Weekly Activity Report: May 14th, 2019
IT Managed Services Transition Weekly Activity Report: May 21st, 2019
Port Back Data Collection & Transition
Port Back Data Collection & Transition
Presentation transcript:

CLIC activity of S. Iija Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work

Current activities Updating of structure and co-administration of EDMS (Engineering & Equipment Data Management Services, for the CLIC experiment (Compact Linear Collider): submitting documents to EDMS. Creating of new accelerating structures, PETS and RF component projects in EDMS and following-up the manufacturing process in MTF (Manufacturing and Test Folder). Preparing test reports concerning the RF structures and RF components. Updating the excel table concerning EDMS and MTF progress. French language training. 16 Feb 20122S. Iija, BE-RF-PM

Excel Table of EDMS/MTF progress 16 Feb 2012S. Iija, BE-RF-PM3

Future activities Updating of structure and partial administration of EDMS (Engineering & Equipment Data Management Services, for the CLIC experiment (Compact Linear Collider): submitting documents to EDMS Creating of new accelerating structures, PETS and RF component projects in EDMS and following-up the manufacturing process in MTF (Manufacturing and Test Folder). Updating the excel table concerning EDMS and MTF progress French language training. Preparing the meeting agenda in Indico (Cost & Schedule meetings, Two- beam module review meetings, Test Module meetings, CLIC Technical Cttee meetings), booking the conference rooms (by using Indico) and other administrative work. 16 Feb 2012S. Iija, BE-RF-PM4