July 2014, TE-CRG-MLEDMS 1395287 Naming Key Issues – List of Naming conventions in use QAC Naming Conventions Sub-committee Meeting n.2 S. Knoops QAC TE(-CRG)

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
New Employee Orientation Electrical Safety Orientation Lockout/Tagout (LOTO) and Electrical Safety In The Workplace FN000387/CR.
An overview of the CERN CMMS
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
MFI Office Maintenance Management Project Presentation 30th of May
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
© Palaniappan R Kannan PMP.,CFSE 1 IEC Standard – What is it? IEC is a Standard for the functional safety of Electric / Electronic / Programmable.
MP5 migration: D7i – P. Martel & B. Vercoutter – TS Workshop Archamps – May 25 th 2005 – EDMS Agenda New Functionalities and Possibilities Underused.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
AGH TRAINEE AT 01 JULY – 30 SEPTEMBER INTRODUCTION 1. CERN 2. Vacuum Group 3. ICM Section 4. My tasks 2Magdalena Karpiel.
Lockout/Tag Out Guidelines Procedures to protect employees and co-workers.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
1 User’s perspectives on the management of Elements Important for Safety (EIS) AMMW - CERN Anne Funken, Marc Tavlet / BE-ASR-SU.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Application – Identifying, Listing Equipment, and Documentation
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
The Road to New Plant Approvals Graeme Claridge. New Plant Approvals How do we get to this stage.
Atlanta Area OAUG Meeting January 18, 2008 Using Oracle eAM to Support Asset Reliability.
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
Review of the processes released in the framework of the MMP Goran Perinić.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
TE-CRG Activities D. Delikaris, TE-CRG.
Proven systems for managing asset integrity & reliability by implementing effective, paperless Ex maintenance and inspection strategies Streamlining the.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
Cryogenic safety organisation at CERN
Crab Cavity Technical Coordination meeting:
DESY / XFEL – Tunnel layout, transport and handling solutions
Maintenance Action Plan following OMP of May 15th 2017
Asset & Maintenance EN-HE group
Cryo equipment strategy in the R2E context
Configuration Management and Layout Database ELENA Project
The MTF adjusted system to meet Vacuum Group needs
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
News from QAC and Central Services
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
EP Experiments safety validation process Safety Permits
Thomas Otto, TE Department, CERN
GIS Portal Racks Project
Work Order System Infor 10 (EAM) JCIM
Mikael Jakobsson ESS Installation Manager
Property, Plant and Equipment (PPE) register in Infor EAM
Infor EAM in the Handling Engineering Group at CERN
Case management as logbook for the cryogenic installations at CERN
HL-LHC Quality management
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

July 2014, TE-CRG-MLEDMS Naming Key Issues – List of Naming conventions in use QAC Naming Conventions Sub-committee Meeting n.2 S. Knoops QAC TE(-CRG) representative – GCO CRG

July 2014, TE-CRG-MLEDMS Some other key-Issues As seen in last meeting for the electrical cabinets, 2 positions were created in INFOR EAM for the same equipment (one by EN/EL and one by CRG) as the naming was not “compatible” -> a solution has been found and update of database is ongoing. pressure “vessels”: CRPEMS We also have the creation of 2 assets in the INFOR database for the same equipment: one by CRG (e.g HCDFBAM701-CR000001) and one by HSE for the pressure “vessels”: CRPEMS in order to be able to create the inspection report with their program SAILOR. -> temporary solution has been found, as long as they are not modifying the SAILOR program: the document EDMS will be attached by hand by CRG to the right asset. But the CRPEMS asset is still existing (otherwise the report cannot be created). safety valves CRPSV-xxxxx We do not have this problem for safety valves CRPSV-xxxxx as we decided to attach these assets to our functional positions Q%SV% for all our safety valves at the surface, pressure vessels CRRP-xxxxx and also for the pressure vessels CRRP-xxxxx were we did the same: we attach them to our functional positions QxD or QxV. This process was “logic” as there were no assets created at the surface. On the other hand, we have seen that some assets were created on the DFBs for safety valves and here we have decided to take the CRPSV-xxxxx and put “obsolete” the assets HC%-xxxxxxxxx. Nevertheless, HSE is having parallel databases and listings to the ones we are using for the follow-up of the 2- yearly/4-yearly inspections. This should be centralized in one database with one maintenance plan and the reporting should be “integrated” and not in an external database with only a EDMS document telling when should be the next inspection. This problem could affect SAFETY assessment and concerning methods, HSE should be involved in the discussions.

July 2014, TE-CRG-MLEDMS List of naming conventions, used in CRG Main document CRG: EDMS : CRYOGENIC FACILITIES AND EQUIPMENT NAMING CONVENTION USED IN CMMS AND OTHER DATABASES References: LHC-PM-QA Equipment Naming Conventions LHC-PM-QA LHC Part Identification Maintenance Management Project, Concept Report, EDMS document Has now intergrated the following documents: Naming Conventions for Cryogenic Instrumentation of the LHC-Machine installed in the tunnel, LHC-QI-QA-0002, EDMS document Naming Conventions for Cryogenic Instrumentation, LHC-QI-QA-0002, EDMS document Naming Conventions for Enclosure Systems of Cryogenic Electronics in the LHC Tunnel, LHC-QY-QA-0001, EDMS document Equipment TAG Code System for Accelerator Cryogenics, LHC-ACR Internal Note 98-03, EDMS document IDENTIFICATEURS POUR BASE DE DONNEES DU SYSTEME DE CONTROLE DES CRYOGENIES DES EXPERIENCES LHC, internal Note LHC/ECR 00-8, or EDMS doc LHC Project Report 92