The Design Partnership LLP Architects + Planners The UC Project Management Institute is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-AIA members are available upon request This program is registered with the AIA-CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods and services will be addressed at the conclusion of this
The Design Partnership LLP Architects + Planners BIM Augments Sustainability in UCSF Laboratory Renovation A Case Study in Sustainable BIM Use Eric Peabody & Christie Coffin
The Design Partnership LLP Architects + Planners LEARNING OBJECTIVES ● Project Program & Context ● Lessons Learned: Successes ○ Reuse & Remodel Instead Of Building New ○ Increase Efficiency ○ Prevent Over-ordering ○ Prevent Rework Wastage ● Next Steps: Comprehensive Simulation ○ Advanced Simulation ○ LEED Tracking
The Design Partnership LLP Architects + Planners ○ University of California San Francisco at Parnassus Heights Campus ○ 16 story H-8 laboratory building ○ 1960’s Building with piecemeal upgrades ○ Large program / small space ○ 5 high profile researchers ○ Pathology basic cancer research PROJECT PROGRAM University of California San Francisco Pathology Basic Research Laboratory
The Design Partnership LLP Architects + Planners PROJECT PROGRAM University of California San Francisco Pathology Basic Research Laboratory
The Design Partnership LLP Architects + Planners PROJECT CONTEXT University of California San Francisco Pathology Basic Research Laboratory ○ Spiraling Construction Costs ○ Shortage of Effective Contractors and Building Trades People ○ Lack of Staging Area at Site ○ Significant Space Needs That Prohibit Easy Access to Lecture Halls Below ○ UCSF Commitment to Sustainability
The Design Partnership LLP Architects + Planners BASIC SUSTAINABILITY ISSUES ● Small Is Sustainable ○ High Efficiency ○ Shared Space ● Adaptable Is Sustainable ○ Modular Design ○ Fixed Supports (Core Lab) ○ Adaptable Variations (Support Labs) ● Green Specifications ○ Demolition (50-75% Recycling Target) ○ New Finishes and Equipment
The Design Partnership LLP Architects + Planners PROJECT DELIVERY IMPROVEMENT BIM is Virtual Design & Construction Automatic Document Coordination 3D Systems Coordination Virtual Building Simulation Direct Fabrication
The Design Partnership LLP Architects + Planners LESSONS LEARNED: SUCCESSES Specific advantages from BIM’s increased level of information and tighter coordination: ○ Reuse & Remodel Instead of Building New ○ Prevent Rework Wastage ○ Prevent Over-ordering ○ Increase Efficiency ○ Beneficial Occupancy Sooner, Reduce Period of Disuse
The Design Partnership LLP Architects + Planners LESSONS LEARNED: REUSE AND REMODEL
The Design Partnership LLP Architects + Planners LESSONS LEARNED: REUSE AND REMODEL
The Design Partnership LLP Architects + Planners LESSONS LEARNED: INCREASE EFFICIENCY Real-time Gross vs. Net Area Tracking 91.44% Efficiency
The Design Partnership LLP Architects + Planners LESSONS LEARNED: INCREASE EFFICIENCY Real-time Gross vs. Net Area Tracking
The Design Partnership LLP Architects + Planners LESSONS LEARNED: PREVENT OVER-ORDERING Accurate Material Take-offs
The Design Partnership LLP Architects + Planners LESSONS LEARNED: PREVENT OVER-ORDERING Accurate Material Take-offs
The Design Partnership LLP Architects + Planners LESSONS LEARNED:PREVENT REWORK Prefabricate to use materials more efficiently Images courtesy of Marelich Mechanical
The Design Partnership LLP Architects + Planners LESSONS LEARNED:PREVENT REWORK Prefabricate to use materials more efficiently Images courtesy of Marelich Mechanical
The Design Partnership LLP Architects + Planners LESSONS LEARNED:PREVENT REWORK Make parts only once Images courtesy of Marelich Mechanical
The Design Partnership LLP Architects + Planners LESSONS LEARNED:PREVENT REWORK Prefabricate to use labor more efficiently Images courtesy of Marelich Mechanical
The Design Partnership LLP Architects + Planners LESSONS LEARNED:PREVENT REWORK Reduce worker & product transportation Images courtesy of Marelich Mechanical
The Design Partnership LLP Architects + Planners LESSONS LEARNED:PREVENT REWORK Complete Pre-installation Coordination Images courtesy of Marelich Mechanical
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners NEXT STEPS: SIMULATION Extend the use of BIM through virtual prototyping and building simulation: ○ Advanced Simulation ○ Daylighting ○ LEED Tracking
The Design Partnership LLP Architects + Planners NEXT STEPS: ADVANCED SIMULATION 3D model simplifies the transition to energy modeling packages: Programming & Schematic Design ○ Green Building Studio Design Development & Construction Documents ○ Ecotect ○ IES Virtual Environment ○ DOE2 ○ eQUEST ○ 3D Studio/VIZ
The Design Partnership LLP Architects + Planners LEED Comercial Interiors (CI) 68 Prerequisites & Credits to Track 38 Special Affinity for BIM 56% of LEED CI Documentation NEXT STEPS: LEED TRACKING Simplify & Auto-document LEED Requirements
The Design Partnership LLP Architects + Planners NEXT STEPS: LEED TRACKING Simplify & Auto-document LEED Requirements
The Design Partnership LLP Architects + Planners NEXT STEPS: LEED TRACKING
The Design Partnership LLP Architects + Planners
The Design Partnership LLP Architects + Planners Questions? Thank you for your time. Sincerely, Eric Peabody & Christie Coffin This concludes the American Institute of Architects Continuing Education Systems Program.