PURPOSE & NEED Categorical Exclusion Training Class.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Identify Problems, Planning Objectives and Constraints.
Purpose & Need Class How to Write a Better Statement
TRANSPORTATION PLANNING 1. Transportation Planning Monitor existing conditions Forecast future population and employment growth; projected land uses Identify.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Consultation Under the Endangered Species Act Garwin Yip, NOAA Fisheries Service, Southwest Region.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
Alternatives Categorical Exclusion Training Class.
Welcome Welcome! Please sign in. Your participation is important! Thank you for taking the time to get involved!
New I-65 Interchange at Worthsville Road Welcome!.
March 2014 Water Resource Permitting Purpose & Need.
Environmental Assessment Public Meeting
Learning Outcomes from Report-Writing Unit
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Concept Analysis Document Executive Summary Template, (To view template instructions – Save this template to project files, reopen and then select View,
I n t e g r a t I n g C S S Practitioner Module 3 Module 3: CSS and Livability In Area Wide Planning.
Purpose and Need 1. Importance of Purpose and Need 2  Understanding federal requirements for development of P&N statements  Know that a good P&N is.
EPA!!!!.  One of the first laws ever created to protect the environment  Came into effect due to public concern about the deteriorating human environment.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Discussion Document By G How. History LeadershipStructureProcessesInformationEnvironment The path of Shared Services is littered with failed attempts.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
Vision, Goals, Objectives, and Alternatives. Objectives  Define vision, goals, objectives, and alternatives within the planning context.  Describe collaborator.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
Pristina, February  unidisciplinary  issue exploring  comprehensive  neutral  time uncritical  substantiated  as long as possible 
Communication 2 Report Writing.
Developing Proposals Responding to an RFP to establish a contract.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
WRITING A BETTER PURPOSE AND NEED A COMMON SENSE APPROACH Kevin E. Davis Environmental Supervisor ODOT-OES.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Public Involvement. Why? Who Cares? –What we do matters to the public –Effective PI enables proactive input and enhances the decision- making process.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
Purpose & Need Training How to Write a Better Statement November 12, 2015 FHWA-Ohio Division Presented by: Office of Environmental Services.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Traditional Project Development Process ConstructionPlanningNEPA Design ROW CE, EIS, EA Location and Design Concept approval.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
Managing the Environmental & Project Development Process Presented by the Ohio Department of Transportation NEPA&CEQ.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
CEQ’s Proposed NEPA Guidance Listening Session _________________________ Welcome Please Sign In Horst Greczmiel Council on Environmental Quality April.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Proposed Interim Guidance – Small Starts. 2 Purpose Before Final Rule, evaluate and rate projects to: Advance projects into project development Provide.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Community Impacts Environmental Justice Public Involvement Categorical Exclusion Training Class.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
What If I Have to Go Beyond an IEE?. EA Training Course 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs) How Do I Prepare.
JSGS Professional Workshop Series Copyright ©Heather McWhinney, 2016 WRITING A CABINET DECISION ITEM.
Purpose & Need Training May 10, 2017
Community Impacts Underserved Populations Public Involvement
TSMO Program Plan Development
TECHNICAL REPORT.
Purpose & Need Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Presentation transcript:

PURPOSE & NEED Categorical Exclusion Training Class

Definition  Articulates why the action is being proposed and intended positive outcomes  Explains existing transportation problem(s) to be addressed and the underlying causes 2 Categorical Exclusion Training Class

Why Have a P&N?  Most important part of the environmental document that helps define:  Why expenditure of funds is worthwhile  Priority of the project relative to other needed highway projects is warranted  Justifies the project to stakeholders, the public, and decision-makers  Justifies significant environmental impacts 3 Categorical Exclusion Training Class

Why Have a P&N?  Cornerstone of the Alternatives Analysis  Guides development, evaluation, and elimination of alternatives  Do not discuss solutions  Defines transportation problems/objectives  Coordinate/communicate with stakeholders  Manages controversy  Establishes logical termini/independent utility  Ensures decisions are legally defensible 4 Categorical Exclusion Training Class

Format

Project History  Provides a background of previous studies  Illustrates how the project was initiated and what has been done to date  Legislative mandates  Part of long range plans, MPO studies, etc  Current status of the undertaking 6 Categorical Exclusion Training Class

Purpose Statement  Clear and concise  Typically one or two sentences in length  State the intended positive outcomes  Example statement for a widening project The purpose of the proposed project is to improve mobility, safety, and access along a heavily traveled portion of US 23 between Worthington and Delaware by addressing existing transportation needs  For this example, the needs are congestion, crashes, and roadway geometrics 7 Categorical Exclusion Training Class

Need Elements  Existing transportation problem(s)  Data that is factual and quantified  Discuss existing, future, and desired conditions  Needs can include:  Congestion  Safety/Crashes  Roadway Geometrics  Facility Deficiencies  Emergency Repairs  Access 8 Categorical Exclusion Training Class

Goals and Objectives  Optional  Part of a project’s desired outcomes  Improves pedestrian access; develops a gateway, opens up areas for economic development, etc.  Important to consider  Oftentimes part of a communities visioning document or master plan 9 Categorical Exclusion Training Class

Summary  Restate the purpose statement  Highlight the need elements 10 Categorical Exclusion Training Class

Logical Termini and Independent Utility  Logical Termini  Transportation problem begins/ends  Rational end points  Independent Utility  Interaction with intersecting elements  Does not rely on separate actions 11 Categorical Exclusion Training Class

“Just the Facts”  Eliminate FLUFF  Opinions do not count  Factual and quantified data  Avoid subjective words:  May, maybe, likely, could  Avoid words with legal interpretations  Significant  Segment  Hazardous 12 Categorical Exclusion Training Class

Recommended Length  Categorical Exclusions  One or two paragraphs per need element  EA or EIS  More detail  No more than three to five pages of text  Be comprehensive, specific, and concise 13 Categorical Exclusion Training Class

End Result  Defines existing transportation problem(s)  Creates a baseline to evaluate, eliminate or advance alternatives  Identified needs help establish logical termini and independent utility  Does not restrict consideration of alternatives for other transportation improvements 14 Categorical Exclusion Training Class

Project File  All decision-making must be documented  Documentation can include  Bridge Condition Rating  Certified Traffic Data  Crash Data  Project Related Correspondence (OES Decision)  Follow the NEPA Assignment File Management and Documentation Guidance 15 Categorical Exclusion Training Class

Alternatives Categorical Exclusion Training Class

CEQ Regulations 40 CFR “This section is the heart of the environmental impact statement…it should present the environmental impacts of the proposal and the alternatives in comparative form, thus sharply defining the issues and providing a clear basis for choice among options by the decisionmaker and the public.” 18 Categorical Exclusion Training Class

CEQ Regulations Agencies shall: (a)…explore and objectively evaluate all reasonable alternatives and …briefly discuss the reasons for their having been eliminated (b) Devote substantial treatment to each alternative considered…including the proposed action so that reviewers may evaluate their comparative merits (d)Include the No-Build alternative (e) Identify the agency’s preferred alternative or alternatives, if one or more exists… 19 Categorical Exclusion Training Class

Alternatives Analysis  Critical element of the environmental document  Part of the decision-making process  Must be clear and concise  Justifies selection of the preferred alternative and the elimination of other alternatives  23 CFR (a)(1)  Critical to illustrate how the preferred was selected over other alternatives  Someone unfamiliar with the project should be able to read this section and follow the process 20 Categorical Exclusion Training Class

No-Build Alternative  Considered and discussed as part of analysis  Carried forward as part of the environmental process and project planning and development  Illustrates existing conditions  Sets the stage for developing alternatives Baseline to compare with other alternatives  Documented in the CE 21 Categorical Exclusion Training Class

Remarks  Discuss how each alternative was developed  Include rationale for developing, evaluating, and eliminating alternatives  Explain how and why an alternative was eliminated:  Criteria used  Who was involved in establishing criteria  Who was involved in the decision-making  At what point were alternative(s) eliminated  If an alternative is eliminated because it does not meet the P&N, explain accordingly 22 Categorical Exclusion Training Class

22 Categorical Exclusion Training Class

23 Categorical Exclusion Training Class

Project File  All decision-making must be documented  Documentation can include  OES Approval  Evaluation Matrix  Alternatives Mapping  Project Related Correspondence (OES Decision)  Feasiblity Study  Alternative Evaluation Report  OES Review Comments  Follow the NEPA Assignment File Management and Documentation Guidance 24 Categorical Exclusion Training Class

Points to Remember  Discussion must clearly and concisely demonstrate the decision-making process  Why No-Build is not feasible and prudent  How and why each alternative eliminated  Why the Preferred Alternative was selected  Alternatives Analysis tied to P&N  Preferred Alternative must meet P&N  Focus on environmental impacts  Other considerations can be included 25 Categorical Exclusion Training Class

Points to Remember  Depending upon a project’s type and complexity, more detailed analysis may be needed to explain the rationale for selecting the preferred alternative  Consider agency and public views  Justify completed studies  Utilize impacts matrix  Very important if proposed undertaking and subsequent alternatives are controversial 26 Categorical Exclusion Training Class