LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.

Slides:



Advertisements
Similar presentations
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Advertisements

Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Scrubbing Review, 8/9/2015 Paul Cruikshank1. Contents SPS Layout aC factory options Assumptions & Scenarios Transport issues Radiation issues Coating.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Technical Support Activities in PH-ADO-PO
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
LIU and (E)YETS LIU-SPS Coordination Meeting 28/01/15 David Mcfarlane
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
High Order Mode Suppressors (HOMS) for SPS TWC200 (Sébastien Calvo, David Bastard) 25 November 2015 LIU-SPS Coordination Meeting.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
LIU-SPS, 29 April 2015 Paul Cruikshank1. Variants today: Starting point: Assume same boundary conditions as 15/4/2015 presentation Analysis is for SPS.
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
LIU-SPS, 15 April 2015 Paul Cruikshank1. In the beginning…. First slide that Brennan gave me – everything decided ! LIU-SPS, 15 April 2015 Paul Cruikshank2.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
SPSU – May 19, 2009 – Resources needed for SPS coating project– J. Bauche 1 Coating of the SPS Main Dipoles Vacuum Chambers: Resources Needed for Project.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
SPS point 3 LSS3 rearrangement LIU-SPS-200 MHz Power Upgrade May 26, 2011Eric Montesinos / CERN-BE-RF-SR.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
4/11/2014 LIU-SPS ABT review1 M.J. Barnes, L. Ducimetiere, T. Kramer, W. Weterings Acknowledgements: E. Carlier, G. Rumolo, B. Salvant, C. Zannini.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
Facility to coat the SPS magnets with carbon Objective: coat at least 90% of the SPS with a carbon thin film with low secondary electron emission in order.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
LIU-ABT systems: SPS, W. Weterings M.J. Barnes, L. Ducimetière, N. Magnin, W. Weterings Acknowledgements: A Adraktas, M. Beck, G. Bellotto, S. Bouleghlimat,
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
Summary of discussion on isolating flanges E. Shaposhnikova With input from LIU-SPS BD WG (in particular H. Bartosik, F. Caspers and J. Varela), K. Cornelis,
ECR (SPS Flange Impedance Reduction) Follow up for IWG C. Vollinger 16/08/2016.
Vacuum System P. Chiggiato TE-VSC
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
AFC 2017 (and 2018) AFC timeline:
TE-MSC activities in SPS during LS2
LIU – EVM status and next steps
SPS - EYETS 2016/17 Vacuum systems planning
Planning and Installation
LIU / HL-LHC Cost and Schedule Review
Long Shutdown for the LHC: Vacuum Beam Pipes
LIU–PLI report LIU SPS meeting.
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
The situation for the coated magnets and what we learned in the LS1 installation: M.Taborelli, for TE-VSC.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Update on beam screen issues
LIU-SPS review for BI (no BWS)
SPS Planning meeting for LS2 #25 Vacuum sectors status
SPS Planning meeting for LS2 #26 Vacuum sectors status
Presentation transcript:

LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building

MTP input – v1.0 Manpower

Manpower estimates MKE, MKDV/H, transverse damper all require punctual transport, vacuum and survey support (few days/weeks) aC coating needs more substantial survey support (maybe 1 month), and continuous transport support (duration ~3 months) These are estimates of what is required, NOT what is available. Note also that for aC coating, 3 FTEs means 12 people for 3 months Presently NO resources from VSC and MSC allocated to aC coating in LS1, so postponing activity to LS2 does not save any manpower for LHC. But if aC coating goes ahead in LS1, then manpower must be found.

Key activities in Long Shutdown 1 (2013) aC coating of 1 full SPS sextant: 1 sextant –3.0 FTE (1 TE/VSC, 2 TE/MSC) plus transport, SU & FSU –Not done: no full-scale validation of ecloud mitigation, 6 sextants in LS2 Relocate/upgrade of transverse damper and PUs: LSS2 & LSS3 –2.0 FTE (BE/RF) plus transport, SU, VSC, plus FSU –Not done: damper upgrade postponed until 2018 Preparation for RF 200 MHz upgrade: LSS3 –4.0 FTE (2.5 BE/RF, 1.5 GS & EN) plus FSU –Not done: RF 200 MHz upgrade not ready for 2018 BLM and MOPOS upgrades (electronics): full ring –3.0 FTE (BE/BI) plus FSU –Not done: BLM and MOPOS upgrades postponed until 2015 Impedance reduction 1 MKE magnet: LSS4 –0.5 FTE (TE/ABT) plus punctual transport, SU & VSC, plus FSU –Not done: MKE impedance reduction not completed until 2015 Modification of MKDVs (impedance): LSS1 –0.5 FTE (TE/ABT) plus punctual transport, SU & VSC, plus FSU –Not done: MKDV/H impedance reduction postponed until 2018 (needs LS)

Implications of postponing work – aC coating aC coating: high priority to do 1 sextant in LS1 –Get one sextant finished –Time frame (1 sextant in 15 months) will allow process to be perfected –Reduce load in LS2 to 5 sextants, with tested logistics and process –Allow beam/vacuum/ecloud measurements in SPS between LS1 and LS2 for treatment validation –Do not treat all machine in one go (in case of problems, easier to reverse...) If not done in LS1: –High pressure with “untried” process and logistics in LS2 –6 sextants to treat in LS2 – even more difficult than 5 –No operational experience on large scale before full deployment –Higher risk of problems, delays –Much less reversible in case of problems

Implications of postponing work – other WPs Relocate damper –Can postpone to LS2 but increases LS2 parallel activities with 200 MHz, and increases minimum length of LS2 for SPS (10 months?) Preparation for RF 200 MHz upgrade –Cannot postpone – otherwise not ready for 2018 installation window BLM and MOPOS upgrades –Can postpone to LS2 but new BI functionality not available for operation in years MKE impedance reduction –Can postpone until 14/15 stp, but machine impedance stays higher, and will continue to have operational limitations with MKE heating until 2015 MKDV/H impedance reduction –Can postpone until LS2 but machine impedance stays higher