Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS: 678496.

Slides:



Advertisements
Similar presentations
Technology Department EDMS nb.?????? Maintenance methods and policy in FPS section Maintenance Management, Spare Parts Management. Overview of activity.
Advertisements

Configuration Management
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
T-FLEX DOCs PLM, Document and Workflow Management.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
Software Process CS 414 – Software Engineering I Donald J. Bagert Rose-Hulman Institute of Technology December 17, 2002.
An overview of the CERN CMMS
Quality System Overview Version Nov 2012 Alfred Medical Research & Education Precinct (AMREP) Austin Hospital © Copyright Nucleus Network 2012.
Professional Systems Associates, Inc. We’ve been building powerful, people-oriented software solutions for commercial and government.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Metadata Harvesting The Hague, 13 & 14 January 2009 Julie Verleyen Scientific Coordinator, Europeana Office EuropeanaLocal Knowledge Sharing Workshop.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Configuration Management (CM)
Engineering Data Management System CERN Drawing Directory overview - Stephan Petit - CERN EST/ISS - LHC Auditorium :00 CERN DRAWING DIRECTORY.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Project management tools Tiia Uusimäki. Agenda Activity Planning Tool and Earned Value Management – Why are the tools needed? – Activity Planning tool.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Presentation on Preventive Maintenance
Software Quality Assurance
Georgia Institute of Technology CS 4320 Fall 2003.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Copyright © 2003 by Release Engineering Inc. All Rights Reserved. Software Manufacturing: Leveraging Release Management Sandy Currier CTO.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Y2K/Focus April 1999 S. Jarp Year 2000 co-ordination AT CERN S.Jarp/IT months left 29 April 1999.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
An overview of current & future functionality David Widegren TS/ASE/EPS 23 February 2008EDMS:
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
EDMS/CDD Overview Stephan Petit - EST/ISS LHCb EDMS Seminar – Dec. 5 th, 2001 EDMS Doc EDMS/CDD Overview.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Project Management Introduction Lecture 1 Resource Person: M. Adeel Anjum.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
EDMS for EGEE-IIEDMS No: ver 1 David Widegren, CERN, TS/CSE Using the CERN EDMS in the EGEE-II project.
Review of the processes released in the framework of the MMP Goran Perinić.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Scientific data storage: How are computers involved in the following?
Dave Barney, CERN. Tracking Tools: Introduction  Main Purpose: to keep track of all incidents & interventions at point 5  Interlocks – reasons & follow-up.
1 Project Integration Using MS Project PMI Scheduling Forum June 2, 2009 Presented by: Ric Albani.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
Vacuum Controls Quality Management
Reliability Analysis & Infor EAM
Chapter 18 Maintaining Information Systems
IEEE Std 1074: Standard for Software Lifecycle
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Nonconformance Tracking
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
Software Engineering I
E. Manola-Poggioli 05 December 2001 EDMS doc
DEPLOYING SECURITY CONFIGURATION
DOE Review of the LCLS Project October 2006
Presentation transcript:

Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:

Product Lifecycle Management at CERN Our PLM system solution Practical example: LHC dipoles Lessons learned & Summary Demo Agenda

LHC - 25 years of continuous Product Lifecycle Management Design Manufacturing Installation Maintenance Dismantling Planning PLM system The LHC project requires continuous Product Lifecycle Management for more than 25 years! Easier said than done in a scientific research environment!

To provide tools to support and help coordinating the globally distributed engineering processes and to facilitate the information workflows. Establish a process of knowledge transfer since the project has a very long lifetime; Staff will be replaced, many short-time visitors and large volumes of changing data. To provide a full description of all LHC components throughout their entire lifecycles and make this permanently accessible to all concerned parties. To help finding solutions to problems occurring in the machine by providing asset tracking, configuration management and maintenance management. The purpose of a PLM system in the LHC project Operation InstallationDesignOperationDismantlingInstallationManufacturing The purpose of the PLM system is to manage the LHC project’s complete engineering and equipment data over the project’s entire lifetime. This comprises:

CERN EDMS – The PLM system at CERN Axalant Design data Drawings & Documents Other DBs Parameters Production data Datastream7i Asset tracking Work management The CERN EDMS MTF - TravellersEDMS Web

CERN EDMS – The PLM system at CERN Document management & Design data Asset tracking & Maintenance management Axalant Design data Drawings & Documents Datastream7i Asset tracking Work management

CERN EDMS – The PLM system at CERN The CERN EDMS is an organization-wide service provided free of charge for all projects and experiments approved by CERN’s scientific policy committee. Some short facts about the EDMS:  > documents & drawings.  ~ new documents/month.  ~ registered LHC components.  ~ new equipment are registered/month.  ~5.000 registered users.  > file downloads/month.

Practical example: The LHC dipole in EDMS

Practical example: Managing the design Full configuration management of design data. Document lifecycles with versioning and access control using project dependent context. Documentation organized and linked in various structures. (PBS, WBS, ABS, etc.)

Practical example: Managing the design Approval processes with comments given directly in the web interface.

Practical example: Manufacturing follow-up

Practical example: Managing non-conformities

- Equipment does not conform to specifications – a non-conformity report, NCR, is created. - The NCR is created with access limited to persons concerned by only this task and this part of the equipment assembly in the manufacturing procedure. - Action proposal to remedy problem initiated and circulated for approval by the concerned staff and then closed when a solution is applied.

Practical example: Maintenance management - The EDMS is fully integrated with CERN’s maintenance management system, Datastream7i. - Advanced management of work orders. - Scheduling and logging of both preventive and corrective maintenance tasks.

Practical example: Maintenance management Barcode Drawing Identifier - What drawing was used to manufacture the component? - Test and calibration data for this specific component. - List of all components manufactured according to a certain drawing. -The present and previous locations of these components. Many advantages having an integrated system for management of data throughout the project – especially for the maintenance!

Lessons learned when implementing a PLM system - The biggest challenges are always about people! - Well-defined quality procedures are essential! Without the LHC Quality Assurance Plan, this PLM implementation would have been impossible. - Adequate user training is fundamental! Over 800 people have so far followed one or several EDMS courses at CERN.

- A PLM installation at a research institute is fully possible - and absolutely needed for a project like the LHC! - LHC engineering and equipment data is today managed using a single Web portal accessing a combination of two powerful commercial data management systems - all information is now easily available with a few clicks. - Equipment data for Commissioning, Operations (as-installed) and Maintenance activities (as-maintained) can be managed with the system - Dismantling and radioactive waste data management issues are today considered to be manageable. - Long term electronic data archiving is still an open issue… Summary