ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )

Slides:



Advertisements
Similar presentations
SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
Advertisements

FNAL Superconducting RF Program Sergei Nagaitsev.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
US Cavities Status and Plan Mark Champion 01 October 2009.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Perspective on ILC SC Technology Collaboration Fermilab-China Bob Kephart ILC Program Director Fermilab.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
SRF Industrialization American Region Laboratory Plans Bob Kephart IPAC10/GDE industrialization Kyoto, May, 2010.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Elements of a Bid to host the ILC in the U.S. R. Kephart (+ H Padamsee )
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
ILC/SRF R&D Robert Kephart. 9/25/2007 R.D. Kephart DOE Annual Review 2 Outline Fermilab ILC Goals Fermilab’s role in the GDE & the ILC machine design.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Elements of U.S. Bid to host the ILC R. Kephart (+ H Padamsee )
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Lutz Lilje DESY -MPY- SCRF Infrastructure at CERN? Electron Accelerator R&D for the Energy Frontier Lutz Lilje DESY –MPY-
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Detail plan of S1-Global H. Hayano (KEK),
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
F ILC/SRF Strategic Planning OHAP Rich Stanek September 17, 2009.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
SRF Infrastructure at Fermilab (and more) Rich Stanek Engineer’s Week February 15, 2010.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
SRF Infrastructure at FNAL Planning, Organization, Cost & Schedule R. Stanek February 14, 2007.
WP5 Elliptical cavities
ILC R&D Board Meeting: SRF Cavities Status and Plans
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Chris Adolphsen Sergei Nagaitsev
EDR HLRF Work Packages Draft Summary
ILC Cavity & Cryomodule Overview
Introduction to Jefferson Lab
Nick Walker (DESY) EU GDE Meeting Oxford
Presentation transcript:

ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )

ILC Americas June 7, 2006FNAL ILC meeting2 ILC Schedule What are the next steps beyond the RDR ? During the TDR phase the focus will be: –Detailed engineering for site specific machine designs –Demonstration to funding agencies that the design and technology is ready for a multi-billion dollar project –Validation of cost estimates We need a schedule that charts the course from the current design and R&D phase through industrialization to construction A credible long range schedule is crucial for both project approval and for long term strategic planning in our field

ILC Americas June 7, 2006FNAL ILC meeting3 ILC Schedule Cavity, cryomodule infrastructure, RF power sources and, civil design should all be focal points in developing this schedule because: –Extensive industrialization and infrastructure will be required –They are cost drivers –Cost & Risk mitigation are crucial elements for project approval –Verification of the technology, industrial capability, & cost will be required by funding agencies Because cryomodules represent such a large cost and require extensive industrialization and infrastructure –Need to develop a plan for how to ramp up production in industry prior to project approval –Need a plan to stage the required CM fabrication and test infrastructure so it is ready when needed Also need a plan to develop and demonstrate the performance and reliability of RF power source

ILC Americas June 7, 2006FNAL ILC meeting4 SCRF Infrastructure The ILC requires extensive infrastructure for: Bare cavity production –Fabrication facilities (e.g. Electron beam welders) –Buffered Chemical Polish facilities (BCP) –Electro-polish facilities (EP) –Ultra clean H 2 0 & High Pressure Rinse systems –Vertical Test facilities (Cryogenics + low power RF) Cavity Dressing Facilities (cryostat, tuner, coupler) –Class-100 clean room –Horizontal cavity & Coupler test facility (RF pulsed power) String Assembly Facilities –Large class-100 clean rooms, Large fixtures –Class-10 enclosures for cavity inner connects Cryo-module test facilities –Cryogenics, pulsed RF power, LLRF, controls, shielding, etc. –Beam tests  electron source & instrumentation

ILC Americas June 7, 2006FNAL ILC meeting5 CM Infrastructure vs ILC Schedule We do not yet know the final process steps for ILC cavities  some infrastructure must wait for critical R&D to be finished (e.g. EP vs BCP & large grain Nb) There is a big delay from the time infrastructure is ordered until it can be used to assemble cryomodules To build the ILC on the GDE schedule  at least PART of the infrastructure be in place before project approval ( more on this later) Since in the U.S. industrial contracts cannot be bid prior to project approval  a fast ILC start means that the initial infrastructure to build cryomodules is likely to be at labs. Also, it seems likely that cavity and cryomodule test areas will never be in U.S. industry  need at labs also –Tests  Big cryo & RF systems, rad safety issues, $$$, etc –Facilities must be in place well in advance of project approval –Not useful to industry afterwards  you pay full cost recovery –Europe, will not try this for XFEL. Asia ? Maybe…

ILC Americas June 7, 2006FNAL ILC meeting6 Infrastructure Time Scales Schedule: Purchase Order to operational item –Electron Beam welder: ~2.0 yrs –Large Class 10/100 clean room: ~ 1.5 yrs –Assembly tooling: ~ 0.5 yr –Large BCP or EP facility: ~ 1.5 yrs –Large Cryogenic plant: ~ 2.0 yrs –Vertical test facility: ~ 1.0 yrs –Horizontal test facility: ~ 1.0 yrs –Klystron + modulator: ~ 1.5 yrs –Build an industrial building: ~ 2.0 yrs Need also to add the time required to train the required technical staff

ILC Americas June 7, 2006FNAL ILC meeting7 Cryomodule ILC cryomodules are complex objects TTF cryomodules (type III) need to evolve for ILC FNAL is collaborating with DESY, INFN, KEK, CERN, JLAB, SLAC, and U.S. Industry on the design of the next generation ILC cryomodule (Type IV) Labs need to learn to built these, then pass that knowledge to industry…  need to build CM’s in Industry ! DESY TTF ILC cryomodule f Fermilab

ILC Americas June 7, 2006FNAL ILC meeting8 Cryomodule ramp up World experience: –DESY infrastructure has built 6 cryomodules (10 with rebuilds ?) for TTF. The rate was ~ 1-2 cryomodules/yr –TJNL successfully built 2 cryomodules/month for SNS Plans: –DESY XFEL plans 116 cryomodules in 5 yrs  average of ~20 cryomodules/yr (peak = 50) in industry –ILC: For a 7 yr const schedule (funding approval to finish) we have about 5 yrs for the actual CM production  –Average rate of 400 CM/yr (peak ~ 600 CM/yr) My assertion: The cost of CM and associated infrastructure is such that it is extremely unlikely that this will be done in any one region (also regions want technology development) If I assume that a region builds 1/3 of the ILC CM on the RDR timeline  average of 133 cryomodules/yr (peak =200) One cannot just switch on this huge industrial capability… it must ramp up over time so it is ready when we need it

ILC Americas June 7, 2006FNAL ILC meeting9 Model Assumptions ILC Construction 7 yrs Cryomodule construction 5 yrs Cryomodules/linac 960 Total ML cryomodules 1920 RTML cryomodules 120 1/3 = U.S. share 680 Initial spares = 3% 20 Total U.S. Plan 700 Klystrons=cryomodules/3 233 U.S. klystron hrs /ILC wk Assumed lifetime hrs Maintenance production 68 /yr Note: Assumed peak cryomodule or klystron production rates set the cost of the required industrial infrastructure I assume we want RF power sources for all CM produced

ILC Americas June 7, 2006FNAL ILC meeting10 U.S. Cryomodules Purchase Infrastructure

ILC Americas June 7, 2006FNAL ILC meeting11 U.S. Klystrons Peak Production

ILC Americas June 7, 2006FNAL ILC meeting12 Spread sheet model Model required U.S. CM Infrastructure vs time Resource table ( with Hasan) –Infrastructure system ( eg. EP system, HPR, oven, etc ) –Estimated throughput for that system ( CM/yr) –Estimated Cost of infrastructure system –Delay from purchase order to operational system Assume that the overall U.S. capacity is set by the bottle necks in infrastructure Arrange “just in time” delivery of infrastructure so that infrastructure capacity always exceeds Assume CM parts and labor are $ 1.5 M ( ~ XFEL) See what this leads to in terms of when funds must be spent to meet schedule and overall costs Can vary assumptions to explore other options

ILC Americas June 7, 2006FNAL ILC meeting13 What do you learn ? To achieve the GDE proposed ILC schedule: –We have to complete the R&D program to reliably achieve the ILC gradients with high yields ( 35 MV/m or lower it) in about 2 years –To develop the industrial capability required by the ILC schedule, we need to buy: ~ $ 85 M (M&S) of “production” infrastructure ~ $ 70 M of industrially produced Cryomodules ~ $ 25 M industrially produced RF equipment Or about $ 180 M prior to project approval ( CD2 in DOE) Over ~ 4yrs in present GDE plan –Infrastructure is assumed to be at labs so this estimate does not count buildings, etc. –These costs do not include the costs to design the machine itself, nor the rest of the ILC R&D program –More on this estimate in a minute

ILC Americas June 7, 2006FNAL ILC meeting14 Cryomodule YearNumber By FY10, One RF unit= basic building block of ILC ML By FY11, Two RF units ILC RF unit = three ILC Type IV cryomodules, modulator, 10 MW klystron Current CM test Plan (ILCTA_NM) klystronModulator cryomodulePhoto-injector A klystronModulator cryomodule Cryomodule IV cryomodulePhoto-injector B load klystronModulator cryomodule Photo-injector B load klystronModulator Cryomodule IV Photo-injector B Cryomodule IV Type IV design will not exist until FY07 ~ 2 years before a module is delivered

ILC Americas June 7, 2006FNAL ILC meeting15 Large Scale System Demonstration The current plan to build 1-2 RF units at ILCTA_NM is a useful first step ( eg R1, R2 demonstration) but is not a sufficient technology demonstration to launch a multi-billion dollar project –XFEL plans 16 preproduction cryomodules in 3 batches ( >10%) before series production –e.g. CERN LHC pre-series was 10% of full set of 1200 cryo-magnets (over 2.5 years) –U.S. needs a plan to develop its industrial capability (working with labs) Proposal: Make 8 more ILC RF units, 24 modules, 240 cavities (80% yield) Approximate Cost : –1.5 M$ per module ~ 36 M$ –Infrastructure to produce & test ~ 21 CM/year ~48 M$ Total ~84 M$ Install 7 units in a twin tunnel and build a 5 GeV linac ( 1.0% system test) Approximate Cost : –7 RF sources (klystron, modulator, (via SLAC) ~ 25 M$ –Cryogenics ( use FNAL CHL) ~10 M$ –Civil 300 m of ILC twin tunnel (near surface) + infrastructure ~31 M$ Total ~66 M$ ~150 M$ total but $ 109 M overlaps with industrialization costs on previous slides

ILC Americas June 7, 2006FNAL ILC meeting16 Infrastructure to build ~ 7 RF units/yr Size infrastructure at 10% = 21 CM/yr (scale x 10 to build ILC) 2 e-beam welders $ 4 M Processing (BCP+ Clean room) $ 3 M EP systems ( 2 ) $ 3 M VTS ( 1 cavity/wk/system => 4 systems) $ 3 M HTS (1 cavity/2 wks  8 systems)$ 12 M Module assembly (MP9 Clean room + fixtures) $ 2 M Module test (1/month  stands)$ 13 M CM Total$ 40 M Need another $ 8 M for klystron test stands and coupler processing SLAC  total is about $ 48 M Processing: 3 total: Fermilab/Argonne, Jlab and one at Los Alamos/MSU/Cornell A lot of infrastructure already exists at these places Install EP facility at Fermilab/Argonne, Cornell/MSU, : total $ 2 M Basic chemistry facilities exist, need to add EP VTS systems = Cornell, TJNL, MSU, FNAL ILCTA_IB1, IARC (1  4) HTS systems = ILCTA_MDB, ILCTA_IB1(2), TJNL, IARC(4-6) Module test = IARC ( 3 stands)

ILC Americas June 7, 2006FNAL ILC meeting17 Large Scale System Demonstration How long will it take to execute this plan ? –I’m not sure… we need to work that out –First priority is to build and install cryomodule infrastructure at U.S. labs and contract fabrication work out to industry –Industry and labs should work closely together –Build CM in groups paying careful attention to cost. Review cost after each ~5 CM and then adjust the fabrication and assembly procedures, to get a new cost point for the next 5 –By the time you are finished ( 3-5 yrs ) the cost curve from U.S. industry and extrapolation will be believable. –Lots of overlap with current plans to build infrastructure –Cavity and cryomodule test facility for 2 modules per month can be in new 35 M$ State of Illinois (IARC) building at FNAL –There is lots to do in developing a sensible ILC schedule

ILC Americas June 7, 2006FNAL ILC meeting18 Conclusions: Next steps We need to develop a plan to ramp up industrial production of Cryomodules in each region. Need to make substantial investment in the required CM infrastructure prior to project approval. In the U.S. it seems likely that much of this infrastructure will need to be at national labs… other regions may have different models but must achieve the same outcome We need to make an ILC construction schedule with realistic time estimates, achievable milestones, and which includes resources and time to create the required infrastructure We need to agree on what large scale technology demonstrations are needed to show that we are ready to build this large project and how this might fit into the overall ILC project timeline.

ILC Americas June 7, 2006FNAL ILC meeting19 XFEL Next Modules M8 M9 Order at Zanon Sep-05 Goal: Modify for Type3+ Must:compatible with Type3(spare TTF) Learn specification M A1 M B1 Order at A, B, C 3x2 cryostats Sep-06 Goal: 3 producers improved design Type 3++ M C1 M A2 M B2 M C Goal: 3 producers for XFEL prototype best solution Order at ? 5 cryostats 2008 Goal: Production and Test of 5 XFEL preseries modules

ILC Americas June 7, 2006FNAL ILC meeting20 TJNL e-beam welding Chemistry TJNL Electro polish Horizontal Test of Dressed DESY Examples: SCRF infrastructure Cryomodule Test at DESY TTF

ILC Americas June 7, 2006FNAL ILC meeting21 The inter-cavity connection is done in class-10 cleanroom Examples: Cryomodule Assembly Assembly of a cavity string in a Class-100 clean room at DESY Cryomodule Assemby at DESY Lots of new specialized SCRF infrastructure needed for ILC!

ILC Americas June 7, 2006FNAL ILC meeting22 Fermilab ILC Infrastructure BCP Facility at ANL RF Measurement and Tuning Cavity Vertical Test Stand Cavity String Assembly Clean Room Class 10/100 Cryomodule MP9 Fermilab 1.3 GHz Cavity at 2 K Fermilab Photo-injector Eddy Current Scanner Horizontal Test Stand LLRF f Fermilab