Status of JINR participation in the ILC G. SHIRKOV Particle Physics PAC, January, 17, 2008.

Slides:



Advertisements
Similar presentations
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Advertisements

Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.
Main Researches and Future Plans of Dzhelepov Laboratory of Nuclear Problem E. Syresin Elementary Particle Physics and Relativistic Nuclear Physics ATLAS.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
1 STATUS OF ILC ACTIVITY AT JINR G. Shirkov Session of RAS, Protvino, December 22, 2008.
ILC Activity in Dubna Grigori SHIRKOV Scientific Council, September, 27, 2007.
First Results of Geological Investigations of Dubna Siting of Dubna Siting G.Shirkov.
Joint Institute for Nuclear Research Joint Institute for Nuclear Research International Intergovernmental Organization JINR and RUSSIA PARTICIPATION in.
JINR Dubna site proposal for ILC G.Trubnikov Joint Institute for Nuclear Research Sendai, March 2008.
The International Linear Collider (ILC) – Dubna Siting Leader – JINR Head Engineer G. Shirkov Международный Линейный Коллайдер.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Towards an International Linear Collider Barry Barish Caltech / GDE 25-July-07.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Joint Institute for Nuclear Research – Joint Institute for Nuclear Research – International Intergovernmental Organization plans of ILC sitting in the.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Status of JINR participation in the ILC G. SHIRKOV GDE Meeting, Dubna, June, 4, 2008.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
25-Sept-07 P5 Fermilab Global Design Effort 1 Report from GDE Barry Barish Caltech / GDE 25-Sept-07.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
1 STATUS OF ILC ACTIVITIES AT JINR J.Budagov, A.Dudarev, M.Lyablin, G.Shirkov, G.Trubnikov, A.Sissakian JINR, Dubna, Russia Presented by A.Dudarev.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Linear Collider Forum of America ILC Technology Applications Workshop Ken Olsen LCFOA President May 15,
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
1 Status of the ILC activity at JINR PAC for Particle Physics 29 January 2009 G.V. Trubnikov.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Plans for JINR’s participation in the International Linear Collider Project G.Shirkov, JINR for Particle Physics PAC 26 th meeting, November
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
Uppsala Commitment to ESS and FREIA Planning
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
ILC/CLIC e+ generation working group
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Explanation of the Basic Principles and Goals
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Status of JINR participation in the ILC G. SHIRKOV Particle Physics PAC, January, 17, 2008

status of international accelerator project of XXI century in high energy physics; status of international accelerator project of XXI century in high energy physics; advantages of ILC sitting in the Dubna region;advantages of ILC sitting in the Dubna region; participation of JINR in the ILC international technical activity and related investigations with electron beams participation of JINR in the ILC international technical activity and related investigations with electron beams ILC Activity in Dubna:

Energy – need to reach at least 500 GeV CM as a start Luminosity – need to reach 10^34 level Linear Collider is based on two main challenges: ILC is based on the TESLA superconducting RF cavities with 31.5 MV/m (as well as X-FEL and FLASH at DESY)

ILC Parameters ( I stage ) Parameter range established to allow for operational optimization Max. Center-of-mass energy500GeV Peak Luminosity~2x /cm 2 s Beam Current9.0mA Repetition rate5Hz Average accelerating gradient31.5MV/m Beam pulse length0.95ms Total Site Length31km Total AC Power Consumption~230MW

New scheme of the ILC (according to RDR)

Conventional Facilities 72.5 km tunnels ~ meters underground (for US, Asia, and CERN cites) 13 major shafts > 9 meter diameter 443 K cu. m. underground excavation: caverns, alcoves, halls 92 surface “buildings”, 52.7 K sq. meters = 567 K sq-ft total –Three RF/cable penetrations every rf unit –Safety crossovers every 500 m –34 kV power distribution Main Linac Double Tunnel

The total cost of ILC without detectors is about B$ in dependence on the site country, the geological structure, the deep of tunnel layout and etc. Participation of JINR Member States in the erection of ILC, in the Dubna region, will provide the development not only the fundamental science but a wide spectrum of applications and high technology including the nanotechnology in the Member States

Value Estimate The estimate contains three elements: The value and explicit labor estimates are current as of

Global Design Effort Structure at the Stage of Engineering Design Report

International Linear Collider Timeline (optimistic)

Sad news (end of December 2007): The financing of ILC works has been stopped in US and UK since 2008 Good news: Russia will be the largest foreign partner of Germany in the XFEL project with contribution 250 MEuro (>25%) (XFEL could be considered as the first stage of ILC) The next GDE European meeting will be held in Dubna, in June, 03-07, 2008 with main topic “Conventional Facilities and Siting”

Advantages of the ILC construction in Dubna: 1.JINR as a basic scientific and organizational structure with international intergovernmental organization. 2.Prevalent legal practice makes it possible to get the land of the ILC location to permanent free use just as it has been done for JINR, according to the agreement between JINR and the RF government. 3.The proposed territory is extremely thinly populated and practically free of industrial structures, rivers and roads. 4.The area is absolutely steady seismically and has stable geological characteristics. 5.A flat relief and geological conditions allow to place ILC on a small depth (about 20 m) in the dry drift clay and to perform construction of tunnels, experimental halls and other underground objects with the least expenses, including cut-and-cover.

6. Sources of the electric power of sufficient capacity: transmission line of 500 kV, the Konakovo electric power station and the Udomlia atomic power plant. 7. The developed system of transport and communication services, good highways and railways, water-way (the Volga river basin); 8. Presence of a modern network and information infrastructure, including one of the largest center in Europe the “Dubna” Satellite Communication Center. 9. A special the economic zone in Dubna provides preferential terms for development and manufacture of high technology technical production. 10. A powerful scientific and technical potential of Dubna makes it possible to involve additionally specialists from world scientific centers into the international collective of highly-qualified scientific manpower. 11.The only one shallow tunnel with accelerator structures and the gallery on the land surface with RF power systems

Layout of ILC in the Moscow Region Moscow region Tver region

Letter to President of Russian Federation Vladimir Putin Signed by: Moscow region Governor Boris Gromov President of RASYury Osipov Director of JINRAlexey Sissakian Middle May 2007

International Linear Collider: accelerator physics and engineering Theme leaders:A.N. Sissakian G.D. Shirkov Period: Preparation of works of JINR; -Participation in estimations and design of ILC elements Participation of JINR in the ILC International Technical Activity

Construction of ILC photoinjector prototype. 2. The LINAC-800 based test-bench with electron beam 3. Development of power supply devices for RF system 4. Metrological laser complex 5. Development and design of cryogenic modules and test systems. 6. Preparation of technical base of cryogenic supply to test cryomodules of the 4th gen. 7. Calculation of electrical and magnetic fields 8. Engineering survey and design works 9. Development of the electron cooling method. LEPTA project. 10. Project CLIC 11. Project FLASH 12. Development of diagnostic systems; development of built-in devices. 13. Development of magnetic systems of the ILC damping rings 14. Development of diagnostics for large cryogenic systems. Personnel – 97 persons SalaryInd. grants TravelsContractsEquipment &materials Total 97 x 650$ x 12 months x 1,26 x 0,5 = 480 k$ 10090RSPI: 20 Sarov 10 Total In total year 2007 = 900 k$ (personnel 580 k$ + travels 90 k$ + R&D 230 k$)

LaboratoryPerson in charge at the Laboratory Key excecutors and number of participants Elaboration of photoinjector prototype (DLNP, LPP) Calculation of electron beam dynamics in the injector (DLNP) I.N. Meshkov, G.V. Trubnikov Meshkov + 8, Kobets V.V The LINAC-800 based test-bench; FEL on the base of LINAC-800; photoinjector; Development of the RF system elements Development of diagnostic, Development of inside devices G.D. Shirkov, N.I. Balalykin, A.I. Sidorov E.M. Syresin G.D. Shirkov, N.I. Balalykin + 3, A.I.Sidorov + 2 E.M.Syresin + 4. Metrological laser complex DLNP, LIT Yu.A. Budagov, V.V.Ivanov D.I. Khubua, G.A. Shelkov Yu.A. Budagov, V.V. Ivanov + 1, D.I. Khubua+ 5, G.A.Shelkov + 5. Development of prototype of the 4 th generation cryogenic modules and testing systems for them (LPP, DLNP, VBLHE) Yu.P. Filippov, Yu.A. Usov, Yu.A. Budagov Yu.P. Filippov + 3. Yu.A. Usov + 3, S.V. Mironov Yu.A. Budagov, B. Sabirov Preparation of a production basis at JINR for cryogenic ensuring of testing of the 4 th generation cryogenic modules VBLHE, LPP, DLNP N.N. Agapov, Yu.P. Filippov, Yu.A. Usov, Yu.A.Budagov N.N. Agapov + 3, Yu.A. Usov + 3 Yu.P. Filippov + 3. Yu.A. Budagov, B. Sabirov + 3, S.V. Mironov, A.B.Lazarev + 3. Calculation of electrical and magnetic fields of complex configuration (DLNP) S.B. Vorozhtsov, G.V. Trubnikov V.B. Vorozhtsov + 3, G.V. Trubnikov + 2. Project of the complex for radiation stability studies (VBLHE) L.N. ZaitsevL.N. Zaitsev + 2. Engineering survey and design developments DLNP, EW Yu.N. Denisov, G.V. Trubnikov, V.I. Boiko Yu.N. Denisov + 5. G.V. Trubnikov, V.I. Boiko Development of magnetic systems of the ILC damping rings E.M. Syresin, N.A. Morozov E.M. Syresin + 3, N.A. Morozov + 2.

CLIC : Continuation of works with CERN: new prototype of the resonator was manufactured, proposed ways for increasing of the pulsed heating, results of the works on 2 nd stage of the Contract approved by CERN, detailed program of experiments in the frame of the 3 rd stage had been agreed, next stage of the modernization of power supplies for LIU-300 focusing lenses Is in progress. LINAC-800: Commissioning of the accelerating section (20-40 MeV) - May 08 Construction works at b.118, engineer infrustructure, modulator test bench, klystron test bench) Participation of the LINC-800 team in NICA project – coordination of works on new heavy ion LINAC – Contract with IHEP, Protvino)

Test bench “Electron linac LINAC Assembled and tested on vacuum the injector node: electron gun + buncher. Vacuum is Torr (corresponds to the project requirements). 2.Created and tested modernized the control subsystem for injector electron gun. 3. Control room is created: mounted power supply block (400 kV). Constructed and fixed power stabilizers, mounted regulated high voltage power supply (1 kV) for modulator rectifier. 4. Mounted and commissioned RF generator at equivalent load. Buncher at low level of RF power is tested. 5. Assembled, mounted and tested equipment for testing of modulators for klystrons. Forming line of A00-01 modulator station is under testing and construction. 6. Assembly and test of magnetic system elements was performed at test bench of FEL IR. Undulator magnetic field tuned with accuracy better then 0,5 % 7. RF test bench for accelerator mounted on the base of operational klystron “Thompson TH 2129”. 8. Researches of photoemission characteristics of the injector cathode at the special test bench for investigations of the DC photoinjectors were started

Injector pass: electron gun + chopper + pre-buncher. Cathode test-bench RF test bench on the base of operational klystron “Thompson TH 2129”.

Realization of the FLASH project (items 17-21) Magnetic measurements of the infrared undulator were performed at DLNP JINR. Undulator is dedicated for measurement of fsec bunches at FLASH. Magnetic measurements of the infrared undulator Were performed at DESY. It was installed at DESY, First measurements of the bunch length At energy of 1 GeV were successfully performed.

Development of diagnostics, inner devices ( item4) Development of the measurement methods of electron average energy in the ILC bunch with relative resolution less then On the base of SR from dipole magnets of the spectrometer is in progress. Manufacturing of the probe prototype for electron energy measurement in the ILC bunch with relative resolution 10-4 and geometrical resolution 3 μм (50 channels).

JINR Participation in the ILC Cryomodule design. This international effort includes contributions from many institutions, including JINR together with FSUE “RFNC-VNIIEF” (Sarov, Russia). The key participants at the JINR are J.Budagov, B.Sabirov and A.Sukhanova. In the recent months JINR and Sarov have started a collaboration with INFN- Pisa on a bi-metallic Ti-SS transition tube to connect the Titanium helium vessel with a 76-mm diameter two-phase helium line in an ILC cryomodule (CM). Such a transition would allow for a very substantial cost savings in the ILC cryomodule production. Successful preliminary tests with prototype transition tubes of a smaller diameter, supplied by JINR and Sarov, were conducted by JINR in collaboration with INFN-Pisa.

Test results create a great impression at ILC Meeting in Florence. In the future the collaborative R&D of bi-metallic tubes for the ILC cryomodule and testing them should be done in conformance with the Technical Specifications. For more statistic a total of twenty tubes will then be delivered to Fermilab for further integration into a cryomodule. JINR with Sarov will carry out the work for production units of the bi-metallic tubes will be sent consequently to the INFN/Pisa and FNAL following the schedule parties will agree timely. The tubes will be used at FNAL and in Pisa for ILC purposes.

Main results in 2007: - JINR scientists worked in operation runs at the PITZ and the FLASH. Several scientific missions of JINR staff to DESY Hamburg and Zoethen were done. - JINR performed design (DLNP Design Bureau) and started construction of the test bench for CsTe photocathode preparation. This test bench is planed to be used for preparation of GaAs photocathode in future. - 8 publications in 2007: Photo injector prototype activity Yu.Korotaev, V.Lokhmatov, I.Meshkov, G.Shirkov, G.Trubnikov

Laser metrology JINR developed test bench at CERN for precise laser metrology. Results ofAug’06 0,5 micron precision of laser beam position measurement on the base of 40m is achieved. At JINR it is planned to set this complex at b.118 (base is 2x250m). Civil engineering Very fruitful collaboration with GSPI. All official documentations (Site Assessment Matrix, Work Breakdown structure, geological and geodetically characteristics) was made by GSPI in the frame of Contracts with JINR. Work is actively going on. DR magnetic system simulations and magnet prototype construction Dr. E.Syresin, Dr. N.Morozov (with group) in collaboration with SLAC (A.Seryi) works on design and possibility to construct at JINR workshop series of magnetic system elements of DR (few dipole magnets). It is also planned to provide test of those elements. This activity is performed in frames of MoU JINR-KEK on ATF collaboration. Similar MoU between JINR and SLAC is under assignment

KEK From Workshop on Electron-Positron Colliders in Alushta, September 2007 to ILC GDE and ILCSC Meetings in Dubna, June 03-07, 2008 ILC Conventional Facilities and Siting, GDE Meeting, Dubna, June 03-07, 2008