Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
IDE DCS development overview Ewa Stanecka, ID Week, CERN
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
G. Bolla For the CMS Pixel Group 2/25/20161 Status at P5 and infrastructures (mainly cooling) Status at P5 and infrastructures (mainly cooling)
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Installation of the T600 at Fermilab CSN2, September 22,
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
TE-CRG Activities D. Delikaris, TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
S A Griffiths CM42 June 2015 Electrical & Control.
Teleconf ACS – FREIA 28th March 2017
IBBelle: Status & Plans
Installation of the T600 at Fermilab
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Service channels between Tracker and PP1
Ti/SS transitions A.Basti INFN-PISA*
1.3-GHz Cavity Vacuum Furnace at IB4
Proximity Cryogenics P&IDs meeting
Tracker cooling loop “check out” draft for discussion
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Teleconference ACS – FREIA 31st October 2017
Far Detector Activities Late 2017 – Early 2018
IBBelle: Status Commissioning at MPP Transport to KEK
Teleconference ACS – FREIA 20th February 2018
SNS PPU Cryomodule Instrumentation
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi

19/05/09E. Focardi General Status (SS1) Work started November ‘08. Last components (tanks) arrived at Cern by Easter. SS1 distribution lines cabinet (180 lines) moved to the pit before Easter. Connection of the Cu pipes completed at the end of April Completed (May 14 th ) the leak rate test under pressure. Some interventions done on on the purge collector and Heater flanges. Leak rate result ~0.5 mbar l/s  ~0.5 Kg/day of C6F14 In parallel, check on the controls done. Filling with C6F14 done Friday May 15 th Commissioning starting this week 2

General Status (SS2….) SS2 distribution lines cabinet moved to the pit on April 22 nd. Connection of the Cu pipes completed. Additional components, checked (for tightness) before assembly Leak test under pressure this week Commissioning starting next week. Cooling plants readiness review on May 20 th Cooling plants released to the Tracker SS1 end of May SS2 June 8th 19/05/09E. Focardi3

19/05/09E. Focardi Manifolds Production done by VCS (Italy). QA procedure used: bi-weekly visit in the Company by F. Raffaelli and M. Caccioppoli (Cern welder) Boroscope inspection and X-ray check on the weldings. High quality reached. Few % rejected. Production completed by the end of March (some delay due to QA process) The parts have been welded to their supporting structure by Cosmi. 4

19/05/09E. Focardi Final distribution lines The production was completed mid March. 230 Cu pipes, 230 supply lines and 230 return lines were produced. About 15% of spares and 18 given to Pixel. L. Demaria and M. Galanti were in charge of the QA. The quality overall is very good. 10% of the welded assemblies have been He tested successfully. In order to speed up the manifolds assembly, a preassembly of the lines was done (put together the different welded components, the shutoff valves and the pneumatic actuators). The job has been supervised by G. Dirkes at Bld Supply lines Return lines 5

19/05/09E. Focardi Manifolds assembly the manifolds were mounted on their support structure and the installation of the valve modules, the shutoff valves and the return lines connection pieces was done at P5 (on surface). Brand new shutoff valves were installed. Thanks to the experience of Giulio, Damiano, Mark, Gary, Filippo and Sergio (techs from INFN and Fermilab), a lot of little integration problems were solved. Norbert Frank (Cern) supervised the pressure and leak tests done after each manifold was assembled. The final pressure (15 bars for 1 hour) test has been successfully carried out. The leak rate test/manifold followed (5*10E-3 mbar l/sec reached) Cu pipes connection done on surface (Cosmi). VCR connection to the manifold 6 SS1 Cu pipes connection

19/05/09E. Focardi Piping layout on top Each pipe bundle carries pipes from several subdetectors. The connections on top are grouped by subdetector. Previous situation. 7 Current situation Easier pipe insulation after connection

19/05/09E. Focardi Air purge 8 Core plant Two tanks produced by IGT(Italy) arrived at Cern April 15 th. SS1 tank in position one floor up the distribution lines.

Work on the balconies 19/05/09E. Focardi9 SS2 SS1

19/05/09E. Focardi10 Brazed lines

19/05/09E. Focardi Additional Instrumentation I Motivation –Monitor the components of the cooling plants. –Low temperature operation –Measure the cooling system’s performance. New sensors for All plants –Temperature of pumps and motors –Pressure after pump –Temperature and humidity in the boxes New sensors for SS1 and SS2 –New tank level meters –Extended monitoring of heat exchangers ( A. Kaminskiy) 11 New PLC code was requested (EN/CV). This part is at checking level. Soon, starts SS1 commissioning

19/05/09E. Focardi Instrumentation: Level monitoring for SS1 and SS2 ( A. Kaminskiy) Ultrasonic level switches for SS1 and SS2 – Works OK with C 6 F 14 – Sensible to the magnetic filed at the level of >300Gauss – With specially designed shielding works up to 850Gauss Radar level meter – Electrical test is done – Test with C 6 F 14 and for compatibility with magnetic field done. 12

19/05/09E. Focardi13 SS1Tank Tank equipped with sensors and valves

19/05/09E. Focardi14 Cooling plant commissioning Established protocol, prepared by EN/CV/DC (EDMS is the Pixels plant version), including:EDMS Electrical & functionality check of sensors (partially done for SS1) -Pneumatic check of valves -Functionality check of the plant in by-pass -Performance test of the plant in by-pass -Regulation and functionality check of the plant with loops open Operation ranges: minimum possible T (>0°C) and max load with cooling loops closed. All requirements in terms of performances/functionalities defined in agreement with CV/DC in a common document (EDMS )EDMS Timing:~2 weeks for SS1, ~2 weeks for SS2: work can proceed in parallel on the two plants. DCS interface testing: check all functions are implemented and working, check different access levels (~3 days) Balancing: 2 days x plant, without detector After these steps: cooling plant available for run with the detector at T>0°C.

19/05/09E. Focardi Leak search All the cooling lines tested for Ar leaks. Few lines needed some attention. A check was done pressurizing these lines with C3F8 and CO2. In two cases some of these gases were found in the TK volume These measurements are suffering from the presence of some liquid inside the pipes. 15

Broad brash plan 19/05/09E. Focardi 16 Tracker Plan Cooling plant commissioning Tracker commissioning

Tracker Readiness Reviews 19/05/09E. Focardi 17 Initiated the process to Review critical areas before resuming Operations: TCO Reviews: Ettore, Karl, Gino, Frank, Slavek to plan and organize. Readiness and Signoff of TSS and Action Matrix. Apr. 28 th - Karl/Ettore/Slavek done Readiness and Signoff of TCS. May 7 th Karl/Ettore/Slavek done Readiness of Cooling System next Wed. May 20 th Ettore/Karl/Frank Readiness of Thermal Screen and Environmental Monitoring System date t.b.d. Completion of Tracker activities in YBO Week 21 Readiness of Organization and Operational Procedures Week 24 Readiness of Tracker procedures and Beam Controls for operation with LHC beams date t.b.d.

Conclusions I remind you the goals of this effort as presented in November ’08 –Quality improvement on the fabrication of the distribution lines –better leak tightness –new tanks and operation monitoring improvement. This was a great effort of about 30 people since then. The results we have now with SS1 make us confident of the good improvement in the quality of the Tracker cooling plant. First step under completion successfully Thanks to the help received by INFN. Next step will be the improvement on the performances of the plant at low temperatures (HEX replacement, remote filling/draining). 19/05/09E. Focardi18