F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 11 Layer0 - SVT Mechanics F. Bosi – M.Massa INFN-Pisa on behalf of the SuperB SVT.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
SuperB Detector Summary SuperB Miniworkshop, Oxford 18/19 th May 2011
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
The integration of 420 m detectors into the LHC
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
1 1F.Bosi, M.Massa, SuperB Meeting, Isola d’Elba, May 31, 2008 Update on Thin Mechanics/Cooling R&D for the Layer 0 of the SuperB Factory F. Bosi - M.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
Update on the activities in Milano M. Citterio and N. Neri on behalf of INFN and University of Milan SuperB Meeting: SVT Parallel Session.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
G. RizzoSVT Meeting – April, SVT Update SVT bi-weekly Meeting - April, Giuliana Rizzo Universita’ & INFN Pisa Group Organization & WBS.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
G. RizzoSVT Status – SuperB Workshop, SLAC Oct SVT- Status Update on R&D activities for TDR X SuperB General Meeting Workshop SLAC – Oct. 6-9,
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
The SuperB Silicon Vertex Tracker Abstract : The SuperB project aims to build an asymmetric e+ - e- collider capable of reaching.
F. Bosi -SuperB Collaboration Meeting, QMUL, 13 – 16 September SVT Mechanics F. Bosi INFN-Pisa on behalf of the SuperB SVT Group.
G. RizzoSVT - SuperB Workshop – Paris 16 Feb SVT Plans for TDR Activities since Elba Meeting Plans for TDR preparation Giuliana Rizzo Universita’
Update on & SVT readout chip requirements
SVT – SuperB Workshop – Annecy March 2010
SVT Mechanics & Beam Pipe
Roberto Calabrese Ferrara University and INFN
Valerio Re INFN Pavia and University of Bergamo
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
F. Bosi INFN-Pisa on behalf of the SuperB SVT Group
MDI Issues M. Sullivan For
SVT Parallel-SuperB Workshop Perugia, June
SVT subchapters & editors
Preliminary thoughts on SVT services
Update on the SVD construction
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Layer0 - SVT Mechanics update (MDI meeting)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Micro Vertex Detector of PANDA Strip Detector
SVT Mechanics Baseline SuperB SVT configuration
SVT Module design F.Bosi
LumiCal mechanical design, integration with LDC and laser alignment
Microfluidic devices for thermal management
Integration issues at IHEP
CFD-Team Weekly Meeting - 8th March 2012
IFR detector mechanics
First of all we will remind some numbers:
The SuperB Silicon Vertex Tracker
SuperB SVT Definition of sensor design and z-side connection scheme
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
Challenges for FCC-ee MDI mechanical design
Integration and IR Hall
SVT detector electronics
SVT- Status Update on R&D activities for TDR
SVT detector electronics
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 11 Layer0 - SVT Mechanics F. Bosi – M.Massa INFN-Pisa on behalf of the SuperB SVT Group SuperB Workshop 4-7 April 2011, INFN-LNF

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 2 -Work on the L0 supports (MAPS version) (Thermal-hydraulic results on microchannel module 550  m) -Work on the L0 supports (Striplets version) (Design on the Cold flanges on to the beam –pipe) -General Layout and stay clear for SVT_L0 -Conclusion Outline

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 33 Full micro-channel module The total radiation length (*) of this support is 0.28 %X mm 700  m Support Cross Section Module MAPS supports summary The single base microchannel unit A square CF micro-tube with an internal peek tube 50  m thick used to avoid moisture on carbon fiber Net micro-channel module Same dimensions of full micro-channel but vacancies of tubes in the structure. The total radiation length (*) is 0.15 %X 0 (*) : Material of the support structure: ( All C.F. material + peek tube + Water) 700  m Carbon Fiber Pultrusion Peek pipe Dh=300  m

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 44 Tests performed on full module sample (length = 120 mm) at  p =3.6 atm. Average module Temperature vs Specific Power Temperature along the module:  T = 5,3 °C at 2W/cm 2 and  p =3,6 atm Full module H=700  m test results

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 55 Tests performed on net module sample (length = 120 mm) with 10 °C as coolant (  p =3,5 atm). Data shown that Net Module is able to cool power up to about 1.5 W/cm 2 below the max required Temperature (50 °C). This goal can also be achieved with a greater safety factor by reducing the inlet coolant temperature. Net Module H=700  m test results

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 6 MAPS L0 module Design Necessary thermal-structural simulation to verify L0 module mechanical stability HDI Al-kapton BUS Z-piece Microtube support MAPS chips Input coolant Output coolant HDI is positioned on outer radius for better radiation damage conditions

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 7 L0 on to the Beam Pipe - Further design is depending by realistic dimensions of HDI

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 88 MAPS Module Work actually in progress 1) Microchannel CFRP in lamination process. Italian company ( Plyform, (NO) is producing a laminated microchannel prototype (H=700  m and Dh=300  m), some prototype realized, June 15 first delivery. Very important for the shaping of the microtube. 2) Microchannel CFRP in pultrusion process. 3) Z-piece prototype design revision for 550  m thin microtube - rapid prototyping technology in ABS material, c/o Poggipolini (Bo). -Not yet realized this shape with poor polimerization microtube from pultrusion process.

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 99 Work in progress Masks design for microchannel shaping from pultrusion process: mechanics in construction !

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011,  m New Carbon Fiber Pultrusion Peek pipe Dh=200  m Old Carbon Fiber Pultrusion 700  m Peek pipe Dh=300  m Full Module X = 0,28 % X 0 Net Module X = 0,15 % X 0 Full Module X = 0,22 % X 0 Net Module X = 0,11 % X 0 Work in progress Further Miniaturization microtube technology Module Microtubes 550  m th, Full and Net version tested at the TFD lab

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 11 Average module Temperature vs Specific Power Temperature along the module:  T = 7,1 °C at 1.5 W/cm 2 and  p =2.0 atm Full module H=550  m test results Tests performed on net module sample (length = 120 mm) with 10 °C as coolant (  p =2,0 atm).

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 12 Tests performed on net module sample (length = 120 mm) with 10 °C as coolant (  p =3,5 atm). Temperature along the module:  T = 7.0 °C at 1.5 W/cm 2  p =3.5 atm Net Module H=550  m test results Average module Temperature vs Specific Power

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 13 Tests performed on net module sample (length = 120 mm) with water- 10 °C as coolant at  p =3,5 atm ( not valid for value *). Microchannel Module Comparison Data % X0 T max °C Specific Power W/cm2 Hydraulic. Diam.  m Flow rate g/min  Temperature °C 1 Microchannel FULL Module support H=700  m Microchannel NET Module support H=700  m Microchannel Full Module support H=550  m *7.1* 4 Microchannel NET Module support H=550  m Comparison List

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 14 Layer 0 striplets design r= 15 mm U V 12.9 mm 97.0 mm Choosing an Octagonal shape: - Module active area = 12.9 x 97.0 mm2 (includes 4% area overlap for alignment) - double sided Si detector, 200  m thick with striplets (45 o w.r.t det. edges) readout pitch 50  m - multi-layer fanout circuits (similar to SVT modules, z side) are glued on each sensor, connecting Si strips to Front End Electronics (fanout extends twice wider than the detector, to allow a minimum of 50  m between metal traces ~ 700 strip/readout side!). -In a module needed ~2 fanouts/side ! -A new readout chip is needed to cope with the high background rate (up to 200 MHz/cm2) Readout Right Readout Left z HDI Si detector 1 st fanout, 2 nd fanout HDI (Lab.) Geometrical acceptance: 300 mrad both in FW and BW Distance from the i.p. : R=15 mm Conceptual design module “flat” CDR design is being revised for TDR!

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 15 Module Striplets Sensor position R-fi fanout HDI Fixing buttons Front-end chips Final solution –HDI in axial direction inclinated at 300 mrad, with front-end chips 30° oriented

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 16 Module Striplets widht of HDI: important to limitate material in the 300 mrad envelope Buttons positioned asymmetric and moved in forward direction Some modification about the previous HDI dimensions ; to facilitate the cold flange design, bottons positioned forward and in asymmetric position.

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 17 CFRP structure, glued on the fanout-sensor and HDI buttons, that freezes the exact positions of all components. Low mass ribs for active region Button-hole for screws and final glueing to the buttons Asymmetric pot for buttons glueing Module Striplets

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 18 Module Striplets In this view missing the z fanouts in order to be able to see sensors and back side HDI Surfaces devoted to couple to the support flange fixed on the beam-pipe Sensors

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 19 Module Striplets No too much space for cold flange between pipe-flange and HDI Right Half Cold Flanges Complete Cold Flanges

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 20 Module Striplets One Module striplets positioned on the Be beam-pipe and on the Cold Flanges Right Half Cold Flanges is fixed with N.4 screw-pins with the left-one and coupled to the beam pipe.

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 21 Module Striplets Complete Module striplets positioned on the Be beam-pipe and supported by Cold Flange. Cold Flanges Buttons

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 22 Module Striplets Very complicated region for cold flanges and pipe input-output cooling connections ! Need more space in z directions……. Module striplets positioned on the Be beam-pipe and supported by Cold Flange.

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 23 Dimension proposed By E. Paoloni for the Shielding. General Layout/ W Shielding Reactions : -L0-SVT system needs about 20 mm of clearance from the 300 mrad line for SVT support cones, cooling service and cables ; - Need space to place Matching-card at the end of the support-cones - Need about 20 mm between DC internal envelope and the W shielding for the total cables way out - Need Space for supporting rails for quick demounting ?

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 24 General Layout/ W Shielding Stay Clear requested for SVT-L0 cables and services Shielding design proposed by MDI people 20 mm Stay clear

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 25 General Layout/ W Shielding Proposed shielding shape to have space for matching card 20 mm Stay clear

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 26 General Layout/ W Shielding Collaboration Engineering Group Meeting in Pisa with Engineering Group of Queen Mary College : -Much interest shown on the L0-SVT mechanical design, in particular on the SVT support cones and external space frame design -N.2 Senior Engineer ready to start in fraction time on the design (J.Morris and F.Gannaway), ready to transmit them the design file available -We are still looking for a young engineer for help in mechanical design for Pisa Engineering group, several candidates interested at this position

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 27 Conclusions 1) Test on Full and Net microchannel H=700  m module have been performed with a lot of prototypes. Now we need endurance test ! 2) First Thermal results from termal-hydraulic test on thin microchannel support microtube (base tube L=550  m, Dh= 200  m ) 2) In good progress work to design L0 striplets components 3) Our Goal is to construct a full scale system L0 (maps-strplets) +Al. beam-pipe model to test by thermal point of view at the TFD lab. 5) Start Engineering collaboration with Queen Mary Eng. Group 4) Need adding work and engineering help to proceed on the design of SVT Layers, on the general support architecture system of I.R. and in the quick demounting of the L0 in the SuperB experiments

F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 28 BACKUP