PRESENTATION ON FOUR WEEK SUMMER TRAINING AT PWD GORAKHPUR

Slides:



Advertisements
Similar presentations
DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Advertisements

Earthwork Operations & Equipments
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Asphalt Concrete Mix Design and Construction
Ms Ikmalzatul Abdullah BITUMINOUS MATERIALS. Definitions: Binder: A material used to hold solid particles together, i.e. bitumen or tar. Bitumen: A heavy.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Properties of Asphalt Important properties of asphalt include: Adhesion Consistency Specific Gravity Durability Rate of curing Ductility Aging and.
Recycling….the re-use of sealed roads Andrew Silvestri, Account Manager ResourceCo Roads & Works Conference – August 2012.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
HIGHWAY ENGINEERING AND TRAFFIC ENGINEERING CENG 95.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
HMA PLANT OPERATION. Types Of Plants BATCHDRUM MIXER.
HMA PLANT OPERATION. Types Of Plants BATCHDRUM MIXER.
Bases, Subbases, & Low Cost Surfaces
ROADS. Roads Introduction Transportation engineering is one of the most important branches of civil engineering. Transportation means conveyance of human.
Mobile Equipment Hazards
Pavement design and construction technique using high strength stone interlocked cemented aggregate low fines matrix. Gerhard van Blerk June 2014 In the.
CHAPTER 3 PAVEMENT COMPONENTS
Pavement Design Terms and Concepts
مواصفات وكميات اعداد الطلاب : احمد عساف حمد عامر زياد كميل بهاء ابو فارة نمر موسى مقدم للدكتور : نبيل الضميدي.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Storing Forage in Silage Piles Jerry Clark UW Extension Educator Chippewa County Dr. Brian Holmes UW-Extension Dept. Biological Systems Engineering.
Preparation before placing concrete Chapter 3. Chapter Topics Subgrade preparation Compaction around buried pipes and excavations Establishing grades.
Chapter 5 Patching and Edge Repair
Principles of Paving rev Principles of Paving.
Success with Alternatives to Paving Mr. Chuck Fromelt Day County Highway Superintendent Webster, South Dakota.
Pavement Maintenance II
Lecture 2 Introduction to Earthmoving
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
THE WAY FORWARD or WHO SAID RESEARCH WAS EASY ?. Relationship between variables  x Y = (say) roughness after 5 years Poor Good Expectation for acceptable.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Road Construction Technology
Procedures in Modern Road Construction I. Development of Ancient Roads 1. Great civilizations throughout history enhanced road building. 2. Cross-section.
1. SIVA By Prof. Dr. Attaullah Shah 2 Fine and Coarse aggregates.
Highway Subgrade (1) Introduction
Bases, Subbases, & Low Cost Surfaces Dr. TALEB M. AL-ROUSAN.
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
CE2255 HIGHWAY ENGINEERING HANDLE BY L.MANON MANI
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
THIN ASPHALT MIXTURES A new top layer should ; be flat and rough
BEST PRACTISE Use of permeable paving As part of a new Railway Station in Bromsgrove a new car park was being installed. This permeable solution had to.
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
QUALITY CONTROL TESTS FOR VARIOUS LAYERS OF FLEXIBLE PAVEMENTS
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
SUBMITTED BY A.SHRIPATHY III-CIVIL ENGINEERING TAMILNADU COLLEGE OF ENGINEERING.
Earth Moving Equipment Companies in Sharjah
COMPACTION BY EQUIPMENTS
CHAPTER 2 Pipeline Coatings.
In the Name of Allah The Most Beneficent & Merciful
BRICKS.
Earthwork operations- are those that involve the earth in its natural form, which need to be undertaken before the actual construction of the pavement.
Asphalt Drum Mix Plant. What is Asphalt Drum Mix Plant ? Asphalt Drum Mix Plant is an uninterrupted mixer in which heating of aggregates, its consistent.
HIGHWAY MAINTENANCE Failures in flexible pavement.
Surface Preparation before laying Hot Mix
Various Fields in Civil Engineering By R.Janani
Pavement condition index calculation
WELCOME.
Civil Engineering Materials
PAVEMENTS CEE 320 Steve Muench.
MECHANICAL OPERATION IN CHEMICAL ENGINEERING
Introduction to Pavement Design
CONSTRUCTION METHODS & TECHNOLOGY
How to install pavers..
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
R.G.G.P (NARWANA) Power point presentation of Building construction
Pavement Structural Analysis
Earth and Rock fill Dams
Light Compaction Equipment
Presentation transcript:

PRESENTATION ON FOUR WEEK SUMMER TRAINING AT PWD GORAKHPUR Presented by: Sitara yadav CE 7th sem

TRAINING PROJECT: Design Finance Construction operation Maintenance of Gorakhpur-Hata road on the basis of men, machine and material.

DESIGN: Design is strategy in getting appropriate projects scope fitted to specific project purpose and need. Design use a systematic approach of using limited resources to optimize the system. Design requires engineering judgement focusing on project purpose, evaluating the safety and design tradeoffs.

CONSTRUCTION: Preparation of soil sub grade. Preparation of sub-base course. Preparation of base course. Preparation of surface course. Rolling, screening sprinkling of water and grouting.

SUB GRADE: Preparation of sub grade takes place after clearing and stump removal phase. 3 basic technique is used (a) Side cast fill (b) Full bench construction with end haul (c) Balanced road section with excavation fill in layers

BASE COURSE: Base course is basic layer of road construction. It is formed with water bound macadam technique. First make surface free of dust and irregularities. Spread course aggregate properly on prepared surface to proper grade / super elevation in such quantity that desired thickness occur. Dry roll the surface. Sprinkle water and then roll again. Sprinkle the binding material at slow rate and roll.

EQUIPMENTS USES: Bulldozer Hydraulic excavator Roller Wheel loader Concrete lining paver Sweeping machine Water bound macadam

Bulldozer Hydraulic excavator

Wheel loader Road roller

SWEEPING MACHINE: Machine is powered by a tractor. Cleaning brush is driven by a hydraulic motor. It is used for cleaning roads, highways. Especially for cleaning WMM/WBM layers prior to bituminous coat.

WORKING:

WET MIX MACADAM PLANT: It is application designed product for preparation of homogeneous mix material of WMM base/sub base layer. It consists five units. Heavy duty four bin feeder unit Inclined slinger belt conveyor Single deck vibrating screen Pug mill unit Storage silo

CONTINUED…..

WATER BOUND MACADAM: SCOPE: WBM consists of clean, crushed aggregate mechanically interlocked by rolling and bonding together with screening, binding material and water laid on sub grade. MATERIAL: Coarse aggregate Crushed broken stone Over burnt bricks

RESOURCE MANAGEMENT: MATERIAL MANAGEMENT: Global sourcing Use of local material MAN POWER MANAGEMENT: Right man for right job Involving local work force

MAINTENANCE: Maintenance of road can be easy as scraping off the layer and replace it with new layer. Some time weather condition and improper construction cause breakage and incorrect sloping. Then further maintenance required Grading Ditches

THANK YOU

QUESTIONS???