L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
S. Silverstein For ATLAS TDAQ Level-1 Trigger upgrade for Phase 1.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Software installation for commissioning tests Olivier Deschamps Calorimeter commissioning meeting – 05 april 2007.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
1 Status of receivers related activities Damien Prieur University of Pittsburgh 12/01/2010L1Calo Joint Meeting - Heidelberg.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
U.S. ATLAS Executive Committee August 3, 2005 U.S. ATLAS TDAQ FY06 M&O Planning A.J. Lankford UC Irvine.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
Reflections of a System Run Coordinator Or Equivalent! Bruce M Barnett STFC, Rutherford Appleton Laboratory L1Calo Collaboration Meeting January.
André Augustinus 9 October 2006 Interlocks update.
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
Haixin Huang AGS Cold Snake: Status and Plans.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
ATLAS calorimeter and topological trigger upgrades for Phase 1
EYETS David Hay EN-OSS.
Online Software Status
L1Calo Joint Meeting Introduction
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
Presentation transcript:

L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory

Overview Overview 2010: It was a Very Good Year (2) A Busy Shutdown A Good Start to the “Year of the Higgs” With a Few Optimisations And Some On-going Problems Water Cooling is a Pain (2) A Technical Stop –28 – 31 March –L1Calo Plans LHC Schedule: A Moving Target And Today’s Status … Bruce Barnett- RAL/STFCMarch 25,

2010: It Was a Very Good Year (1/2) Ramping Up Protons Bruce Barnett- RAL/STFCMarch 25,

2010: It Was a Very Good Year (2/2) With a little Heavy Metal Bruce Barnett- RAL/STFCMarch 25,

A Busy Shutdown Calorimeter Testing –Following OTX fixes and recovered drawers Firmware Enhancements –CMM XS triggers Software Upgrades –Calibration, CMMs and lost state transisitions System Tests Cooling Problems Bruce Barnett- RAL/STFCMarch 25,

A Good Start to the “Year of the Higgs” More Bunches … 200 and counting Bruce Barnett- RAL/STFCMarch 25, Magnet Problems –But interesting timing runs ….

With a Few Optimisations New Calibrations –In particular picking up recovered channels (Thanks to the calorimeter guys) Overlap Towers –Commissioned, but timing optimisation underway Improved Monitoring Bruce Barnett- RAL/STFCMarch 25,

And Some On-going Problems Little DCS glitches –No bogus shutdowns But CMM FPGA temperature monitoring not yet understood and monitoring disabled –But now Bogus hardware signals: One ROD to be replaced during Technical Stop But –No magically lost CMM configurations f/w fix successful? Wait and see … –No problematic new XS firmware Knock on wood Bruce Barnett- RAL/STFCMarch 25,

Water Cooling is a Pain (1/2) Problem –Water stagnated in iron pipes which provide cooling to racks: resulted in oxidation –Main reservoir is filtered, but particulate matter remains in pipes Definitive Solution –Probably redesign of system and replacement of pipes during long shutdown Transitional Solution –Install draining valves in all “bras-mort” to allow complete purging (requires weeks.) Budget Solution: –Drain critical (low-flow, problematic) bras-mort –But can’t reach ends of dead-ends. And there are now traces of Aluminium in the water! (P/W heat sink degradation?) Bruce Barnett- RAL/STFCMarch 25,

Water Cooling is a Pain (2/2) Better monitoring of temperatures will help Problem –Narrow Flexible hoses block with particulate matter finding its home –Wiener supplies provide P/S trip, but no temperature readout Solution –Use optional temperature sensor input Available at P/S output, on “personality card” –Equip DCS FSM with trending, warning feedback for identification of temperature rises Bruce Barnett- RAL/STFCMarch 25,

A Technical Stop (28-31 March) Bruce Barnett- RAL/STFCMarch 25,

A Technical Stop (L1Calo Plans) Monday –7:00 Power Down L1Calo before Racks switched off –11:00 DCS PC off for UPS intervention –ROD Replacement (DCS sensing) –Temperature probe test installation (CP3) Tuesday –AM: No activity Point 1. Access restricted. –PM: Tile signal tests (no ROS, SFI) Wednesday –AM: L1Calo Standalone Tests DAQ, ROD –PM: CTP Related RoIB tests. CTP timing tests (CMM maintenance release) Event-building tests Thursday –AM: LArg FCAL mapping tests –PM: Signal Tests Bruce Barnett- RAL/STFCMarch 25,

LHC Schedule: A Moving Target Bruce Barnett- RAL/STFCMarch 25, (Going by steps towards 900b, 75ns)

And Today’s Status … Bruce Barnett- RAL/STFCMarch 25,