European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
Hydraulic Kit (pump and tank) Pictures from prototype.
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
20/10/ PHOS Cooling status (1-20 Oct) Brief 28 Sep start cool down. Steps was: +5, -3, -10, -15, -20, -25, -30°C (by liquid).
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire R. Trant HSE Unit for ACCU Meeting R. Trant.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
EN-CV interventions during YETS
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Cooling System Solutions
60kW Thermosiphon control system
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
MAINTENANCE INTERVAL SCHEDULE D6R TRACK TYPE TRACTOR 7AR EVERY 10 SERVICE HOURS OR DAILY.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
Maintenance of a Vehicle’s Cooling System. Regular maintenance of a vehicle's cooling system is important to keep the vehicle running properly and to.
S A Griffiths CM42 June 2015 Electrical & Control.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
Teleconf ACS – FREIA 28th March 2017
Friday – port side engine room weekly checks
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
TS2 preparatory meeting
Rosario Turrisi INFN Padova
Control Logic for ATLAS Thermosiphon chiller brine and water circuit
ATLAS Thermosiphon Readiness Review 17th March 2016
Teleconference ACS – FREIA 31st October 2017
Cooling technology Main components and equipments
MAUVE CO2 cooling review
ATLAS Thermosiphon Electrical Distribution and Run Modes
Systems approach to Aquatics Center Energy Efficiency
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
Presentation transcript:

European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June 2012 O.Crespo-Lopez

European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire ALICE Installationtype DC contact User contactstatusconsequence SPD/TPC/SSD -SDD RP analysisS.RousseeC.Bortolinconfirmednothing SSD/SDD Add thermostatic valve on the static relay cooling S.Roussee C.Bortolin confirmed nothing control of the electrical connections Stop cooling Check the filterStop cooling Control pressure regulator Stephane berry nothing TPC rod New by-pass S.Roussee + sylvain Nichilo C.Garabatosconfirmed Stop cooling Modification of the pump position Stop cooling Drain & replace water + resin Stop cooling Additionnal jobs: Study for replace the tanks of TRD & TPC Feec O.Crespo-Lopez

European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CMS Installationtype DC contact User contactstatusconsequence Brineperformance testD.LefilsA.D’Auriaconfirmed Cooling not available excepted Pixel Thermal screen Modification of the backup chiller D.Lefils A.D’Auria confirmedStop TS cooling cabling D.Lefils & CMS confirmednothing Visit Remote refill + mechanical structure EN/MME D.Lefils or S.Berry A.D’AuriaConfirmedStop of all cooling’s ChillerCop3 inspectionSeicarA.D’Auriaconfirmed Perturbations of the temperature Additionnal jobs: Study for the modifications of the brine & for the electrical cabinets O.Crespo-Lopez

European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire ATLAS Installationtype DC contact User contactstatusconsequence Evaporative Dismounting cop1 for 20k maintenance O.crespo/ P.Bonneau K.Nagaiconfirmed Evaporative with 6 compressors during 3 weeks TRTRefill & leak searchO.CrespoA.Romanioukconfirmednothing Muons_A Checking of the flowmeters n°13 & main O.CrespoS.ZimmermanConfirmed Need to stop the system if we need to replace the main flowmeter Evaporativerefill O.Crespo/ P.Bonneau K.NagaiconfirmedNo consequence Additionnal jobs: Study for the pumps redundancy & for the integration O.Crespo-Lopez

European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire LHCB Installationtype DC contact User contactstatusconsequence TT Replacement of oil & Freon on the chiller F.CorbazL.Royconfirmed Put the system in interconnection mode TT+IT Check temperature sensors nothing O.Crespo-Lopez

European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire TOTEM Installationtype DC contact User contactstatusconsequence TOTEM Leak search on the line & pots O.CrespoJ.Baechlerconfirmednothing O.Crespo-Lopez