CARMA: The Combined Array for Research in mm-wave Astronomy Tony Beasley NSF Review, July 16 2002.

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

ALMA Cycle 2 Capability Jongsoo Kim ALMA EA Korea node.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
GENI: Global Environment for Networking Innovations Larry Landweber Senior Advisor NSF:CISE Joint Techs Madison, WI July 17, 2006.
CARMA in the ALMA era CARMA is well-suited for mapping large fields, extended objects; unique capabilities at 30 GHz testbed for new instrumentation and.
CSV Plan status Robert Laing ESO Science IPT. 2 Recent changes Complete rewrite to take account of rebaselining and revised delivery schedule Proposal.
ATACAMA. At September Faculty Meeting we proposed: A project of scientific excitement and uniqueness, in the IR niche; with focus that emphasizes Cornell’s.
The Future of the Past Harvard University Astronomy 218 Concluding Lecture, May 4, 2000.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
CARMA Dick Plambeck UC Berkeley (for the CARMA consortium) URSI, 24 June 2003, Columbus, Ohio.
Project status and specifications Douglas Bock Project Manager 1.
CARMA (Combined Array for Research in Millimeter Astronomy) Capabilities and Future Prospects Dick Plambeck SF/ISM Seminar, 9/5/2006.
Dick Plambeck UC Berkeley (for the CARMA consortium)
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
Star Formation Research Now & With ALMA Debra Shepherd National Radio Astronomy Observatory ALMA Specifications: Today’s (sub)millimeter interferometers.
October 2005ALMA Cost Review1 Atacama Large Millimeter Array Science IPT Review Bilateral Project Scientists: Al Wootten, (Lead) Tom Wilson, (Deputy) Ryohei.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
ALMA long-term development plan Kotaro Kohno (Univ. of Tokyo/ASAC)
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing the Pluto.
Combined Array for Research in Millimeter-Wave Astronomy Astronomy with CARMA Raising our Sites.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
SPIRE-FTS spectrum of Arp 220, Mrk 231 and NGC Bright CO (J = 4-3 to J = 13-12), water, and atomic fine-structure line transitions are labeled. The.
Site development issues, focusing on site acquisition Douglas Bock See also: Stephen’s “Visual Tour of the OVRO site” FASR Planning Meeting, AUI, August.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
Girish Kumar Beeharry Mauritius Radio Telescope An African Low Frequency E-vlbi.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
ALMA Week, 2004 March 3-5, in Garmisch, Germany ALMA Operations Plan: Progress Report Darrel Emerson (NRAO) David Silva (ESO) JAO Operations Group
Molecular Clouds in in the LMC at High Resolution: The Importance of Short ALMA Baselines T. Wong 1,2,4, J. B. Whiteoak 1, M. Hunt 2, J. Ott 1, Y.-N. Chin.
Imaging Molecular Gas in a Nearby Starburst Galaxy NGC 3256, a nearby luminous infrared galaxy, as imaged by the SMA. (Left) Integrated CO(2-1) intensity.
Water Vapor In The Atmosphere: An Examination For CARMA Phase Correction Y.-S. Shiao, L. W. Looney and L. E. Snyder Department of Astronomy University.
Murchison Widefield Array (MWA) : Design and Status Divya Oberoi, Lenoid Benkevitch MIT Haystack Observatory doberoi, On behalf.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
Large Area Surveys - I Large area surveys can answer fundamental questions about the distribution of gas in galaxy clusters, how gas cycles in and out.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
ALMA Science Examples Min S. Yun (UMass/ANASAC). ALMA Science Requirements  High Fidelity Imaging  Precise Imaging at 0.1” Resolution  Routine Sub-mJy.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
Prof. Steven Tingay (ICRAR, Curtin University) Workshop on East-Asian Collaboration on the SKA Daejeon, Korea, November 30 – December 2, 2011 A long baseline.
The SKA: Next Week, the Next 3 Years & Beyond Jim Cordes, Cornell University 24 August 01  Concepts  Science Goals & Payoffs  Configurations, Modes.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Update on the NADP Atmospheric Mercury Initiative Developing a new coordinated and collaborative approach to atmospheric mercury monitoring A Briefing.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Welcome to SKA-Japan Workshop 2010 Many thanks to NAOJ and the Foundation of Promotion of Astronomy for financial support.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Astrochemistry with the Upgraded Combined Array for Research in Millimeter-wave Astronomy D. N. Friedel Department of Astronomy University of Illinois.
Interferometry at Millimeter and Submillimeter Wavelengths Interacademiaal College 1 maart 2006 Interferometry at Millimeter and Submillimeter Wavelengths.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
ATACAMA CCAT : The Cornell-Caltech Atacama Telescope
EVLA Availability - or - When Can I Use It?
Observing Strategies for the Compact Array
Miller Lab - Columbia Currently in the lab…
Observational Astronomy
Observational Astronomy
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
A Submillimeter and CMBR Observatory for the South Pole
Superintendent Goals Update MAY 7, 2013
Correlator Growth Path
EVLA Construction Status
Presentation transcript:

CARMA: The Combined Array for Research in mm-wave Astronomy Tony Beasley NSF Review, July

Introduction Two decades – OVRO/BIMA arrays have pioneered field of mm interferometry Talks: remarkable achievements & ongoing development programs of individual facilities Early 90’s: shared interest in Sci/Ed benefits of merging the arrays led to “CARMA concept” Today: CARMA Project underway: overview 1 st : Technical/infrastructure development already directed towards new array – context Note: URO proposal under consideration includes transition and early CARMA operations

Project Goal Build a new mm array emphasizing New science Improved continuum/spectral-line sensitivity Unique: Image on all angular scales: HR, Wide FOV Operational flexibility Student training - “hands-on” New instrumentation & observational techniques Public outreach

Key Features of CARMA Heterogeneous array (850 m 2 ) six 10.4m antennas - OVRO nine 6.1m antennas - BIMA eight 3.5m antennas – Uni. Chicago SZA Use four configs: 100m – 1500m + SZA Imaging over wide range of angular scales: CARMA: ”, SZA: 0.5-3’ More antennas  High-fidelity imaging + snapshot Mosaicing

Science Drivers Studies of circumstellar/protoplanetary disks, stellar outflows, evolved stars Examine environments of nearby & distant galaxies Explore Solar System: Sun, planets, comets, KBOs Probe astrochemistry of ISM, IPM Image distant universe: high-redshift galaxies Cosmology experiments (other talks…) CARMA: address key research areas + complement new instruments (NGST/EVLA/CELT/ALMA)

Example: high-resolution imaging of CO in the Virgo Cluster

Continuum Sensitivity (4 GHz BW, 2-pol) Angular Resolution & Line Sensitivity (1km/s channel, 1-pol) 100 GHz 230 GHz Freq GHz 1-min mJy 5-hr mJy Config Beam ” 1-min K 5-hr K Beam ” 1-min K 5-hr K D C (345) B A CARMA Sensitivity Summary Mins ~ K Hrs ~ sub-K

High-Altitude Site Lower atmospheric opacity, better phase stability: increase in observing time, speed Required: >7000’, 2-km baselines, 400-m central area, year-round access, low snow Owens Valley – high, dry locations with suitable topography – White/Inyo Mtns ’ : factor of two improvement in opacity statistics over existing sites (mean , number of days < given  etc.) – x4 integration time, year-round observing

Site Selection Initial candidate – Upper Harkless Flat Caltech studies, development Opposition – site dropped in strategy: analyze range of sites Initial sample  three candidates Juniper Flat (7900’) Cedar Flat (North & East -7300’) Lower Harkless Flat (7100’)

Juniper Flat – 7900’

Cedar Flat East – 7300’

Cedar Flat North – 7300’

Lower Harkless Flat – 7100’

 Percentiles 25% < % < % < 0.28 OV: Regional results consistent

Site Acquisition All sites on National Forest – federal NEPA UC participation – state CEQA Result: joint EIS/EIR document Considered: Botany/Wildlife/Cultural issues Strong community support Residual opposition: CNPS, ESAS, Big Pine tribe In general: CARMA strategy good, land use in the OV is complex issue…

Process Timeline SUP Application to INF – October 2001 NEPA/CEQA Formal Initiation – March 2002 Public Scoping process – June 2002 (draft EIS/EIR doc: October 2002) (final EIS/EIR: December 2002) (ROD/appeal period – March 2003) Site access: Spring 2003+

Array Developments New Site Antenna Transporter + Relocation plan First light: COBRA-based 4 GHz FPGA Correlator + 8GHz SZA continuum (flexible subarraying) SOA integrated 22GHz WVR phase correction LO/IF system – HEMT/SIS/MMIC? receivers New computing & archive system Upgrades: antenna drives & cryogenics, telemetry Development options: single dish, wideband BIMA IFs, polarization capability (other talks..)

Site layout

VRML simulation

Relay Station

Operations Model Site-dependent… General: similar to OVRO/BIMA model – observers/students/postdocs run array Generate own power - diesel Important: utilize/enhance existing infrastructure (kitchen, dorms, engineering facilities) Time allocation/observing policies: under consideration by SSC

Consortium Structure CARMA BOARD CARMA BOARD Science Steering Committee CARMA Director Antennas Transporter Woody Plambeck Site Beasley Relocation Fleming Woody Snyder LO/IF Plambeck Lamb Computing Scott Pound Crutcher WVR Harris Woody Plambeck Correlator Hawkins Project Manager A. Beasley Project Manager A. Beasley Working Groups: Science, Hardware, Software, Configuration Distributed design/development via , weekly telecons, f2f meetings, visits Website: - info, document archivewww.mmarray.org July 2002 – Project plan revision underway

Budget $M (2002) Correlator Site WVR Environmental Management/Admin Transporter Computing BIMA Relocation Technical Developments 15% Contingency (July 2002) $14.5M Funding: Caltech $5M, BIMA $5M, NSF $2.3M (+$2-3M TBI) Staffing for project development: URO operations grants

Schedule Design/analysis/scoping phase - past year BIMA/OVRO upgrades/retrofits - Fall 2002 New technical developments - Fall 2002 Milestone: Correlator PDR – November 2002 Site Award/construction – Spring 2003 Move OVRO to high site – Spring 2004 BIMA relocation – Spring/Fall 2004 Full Operations – Summer 2005

CARMA Next three years – upgrades, new technical developments & transition to single instrument/observatory operations - busy Maintaining/enhancing staffing levels critical to support project development Outstanding issue - site process – progressing well, resolution early next year CARMA: common vision/shared future, excited project & array potential

OVRO images