Culler Lake Bathymetry: Potential Changes Following Dredging Spring 2013 Sampling Methods Class: J. Bruland, M. Dybala, N. Gunther, A. Hoffman, J. Jones,

Slides:



Advertisements
Similar presentations
Sources of water (RAIN)
Advertisements

Deep Creek Lake Sediment Summary DCL Policy Review Board Meeting July 23, 2012 Deep Creek Lake Phase II Sediment Study: Progress Report.
Introduction to Lake Surveys Field Techniques Unit 3 Module 8 Part A Lake Morphometry.
Roger Williams Park Ponds Restoration Project. Project Update Concept Plans Developed for Structural and Non- Structural Best Management Practices Draft.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Interpreting a contour map
Measurement of erosion Splash erosion. Techniques in farmers fields Figure 1. Measurement of erosion and.
The Tale of the Tape Measuring Pond Surface Area and Volume for Stocking and Chemical Applications Billy Higginbotham Professor and Extension Wildlife.
Review of Flood Routing
City of Kimball Stormwater Re-use Project Protecting our Water Resources – a Forum Series for Policy Makers March 30, 2011.
Mudboils AEES Pre-Conference Workshop Wednesday, June 6, 2012 Nate Barlet Brandon Winfrey Roy Wood.
PSC 121 Prince George's Community College
Lesson Objectives 12/2/13 TLW, with 100% participation,
Reading: Applied Hydrology, Sec 15-1 to 15-5
Floodplain Delineation of Indiana Streams Allison Craddock Tom Gormley Jessica Tempest Erin Wenger.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
Assignment 2 -Lake Watersheds and morphometry Elkwater lake is a small lake situated near Cypress Hills Provincial Park. The watershed is mostly forested.
Surface Drainage CE 453 Lecture 25.
Pomme de Terre Lake Water Quality Summary Pomme de Terre Lake Water Quality Summary US Army Corps of Engineers Environmental Resources Section.
X Group: Carlson Pond Physical and Chemical Parameters Fish 415 Rochelle Ochoa, Earl Beasley, Will Kennedy, & Charles Reeves.
Sources of water (RAIN)
Bioreactors for the Reduction of Nutrient Transport.
Wes Marshall, P.E. University of Connecticut March 2007
A combination of warm weather grasses, terrestrial and aquatic plants in and around the spring Stormwater Management Plan for College Springs Park Benjamin.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Subsurface drainage – Investigations
Stormwater Study To determine the effectiveness of the campus’ existing stormwater infrastructure, if NSCC qualifies for a stormwater credit and to propose.
Predicting Sediment and Phosphorus Delivery with a Geographic Information System and a Computer Model M.S. Richardson and A. Roa-Espinosa; Dane County.
Table 1. The hydrologic budget summary where the measured hydrologic field data compared to the GIS and survey data are unfortunately not equal. Computing.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
©2010 Elsevier, Inc. Chapter 7 Lakes and Reservoirs: Physiography Dodds & Whiles.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
US Army Corps of Engineers BUILDING STRONG ® Understanding Sedimentation and Land Use Cover Relationships in the Lake Sidney Lanier Watershed Russell A.
Study Guide Chapter 17 1.Know and use the simple equation for discharge. Why is this equation important? 2.What is the gradient of a stream? 3.Describe.
Nutrient and Sediment Loading in Sougahatchee Creek and the Impacts on Aquatic Biota Report submitted to West Point Stevens and the Cities of Auburn and.
 DEM from USGS ◦ Digitized version of 1:24,000 topo quadrangle ◦ Vertical accuracy  5m, 30m resolution  KML files, digitized from Google Earth.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Estimating the Volume of Fine-Grained Sediments Behind Four Low-Head Dams, Kalamazoo River, Michigan. In cooperation with the Michigan Department of Environmental.
CE 3372 Water Systems Design
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Campus Storm Water Proposal A Storm Water Solutions Project.
Topographic Maps. What is a Topographic Map? ► Provides information about land elevations and landforms such as mountains, hills, and depressions.
Tim Clark King County Department of Natural Resources Water and Land Resources Division Impacts of Saltwater Intrusion into an Urban Freshwater Lake.
Hydrology & Water Resources Engineering ( )
Arbor Lake Water Quality External & Internal Nutrient Loading.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
Mechanical Operation ( ) Prepared By, Hardev Jadav ( ) Sanjay k Prajapati ( ) Ravina Solanki ( )
Interpreting a contour map
Groundwater Review Aquifers and Groundwater Porosity
Stormwater Conveyance Design 2
Mapping Earth’s Surface
Environmentally sensitive areas
CE 3372 Water Systems Design
Effects of persistent drought on Lake Mead and the Las Vegas Valley
  A) 4 B) 5   C) 6 D) 7.
Coursework guidelines
Review of Flood Routing
Storm Water Storage and Treatment
Tree and Sage Brush density and its influence on snow accumulation at a the lower forest boundary By Ernie Lawson.
PSC 121 Prince George's Community College
Small Radio Controlled Dredge
Storm Debris Assessment Tool
Hydrogeologic Investigations of the Silver Lake Wetland
Review of Flood Reservoir Routing
Environmentally sensitive areas
PSC 121 Prince George's Community College
Presentation transcript:

Culler Lake Bathymetry: Potential Changes Following Dredging Spring 2013 Sampling Methods Class: J. Bruland, M. Dybala, N. Gunther, A. Hoffman, J. Jones, L. Kelley, J. Neidinger, M. Olszewski, C. Rogers, A. Waldron Department of Biology, Hood College, 401 Rosemont Avenue, Frederick, MD Introduction Culler Lake, constructed in 1939, is a multipurpose impoundment located in the heart of Baker Park. The lake serves as a recreational resource and a stormwater management pond. Culler Lake receives inflow from Carroll Creek and stormwater drainage from 66 acres of urban land (see Figure 1), which includes residential housing and much of the Hood College campus. We created two bathymetric maps of the lake: one as it currently stands and another that would be the result of dredging activity. Our hope is this information can be used to assist in future lake restoration and stormwater remediation plans. Current Bathymetry Potential Bathymetry after Dredging Lake Volumes: Weight to area ratios for cut-out lake maps were used to determine lake surface area and that of each contour ≥ 4 feet. These were measured against a standard to calculate surface areas in ft 2. Segment volumes for each depth stratum were then calculated using the equation below and summed for the volume of the entire lake. V = h/3 [A 1 + A 2 + √(A 1 *A 2 )], where V = volume of stratum; h = depth of stratum, A 1 = area of the upper limit of the stratum; and A 2 = area of the lower limit of the stratum Methods Lake Depth: We recorded both soft and hard bottom measurements throughout Culler Lake. Soft bottom measurements are the depths from the water surface to the top of the sediment layer. Hard bottom measurements are the depths from the water surface to the constructed base of the lake bottom, as indicated by a section of PVC pipe being forced as deeply as possible into the sediment. The difference between these two measurements is an indication of the depth of the sediment. Depth readings were recorded over eleven transects spanning the length of the lake. GPS was used to record five to seven waypoints along each transect Inflow and Outflow Measurements: To measure the flow of water into and out of Culler Lake, several readings were taken. We measured the flow at the input pipe from Carroll Creek. The outflow was measured where the lake waters re-enter Carroll Creek. The water flow was recorded in feet per second. To calculate cross- sectional area, we also measured pipe diameter, the maximum water depth, and the width of the waterline within each pipe. Current Bathymetry Depth (ft)Surface Area (ft 2 ) Depth Interval (ft) Volume (yd 3 ) 0149,7700 to 418, ,6224 to 51,851 59, Total Vol. (yd 3 )20,843 Dredging Culler Lake The volume of dredged sediments, 4,610 cubic yards, would require approximately 500 truckloads of material to be removed (based upon an 9-10 cubic yard truck capacity). Dredging could reduce total suspended solids at the lake outlet by reducing re- suspension of sediment. Given the range of current turnover time estimates, it is difficult to approximate water residence time increases after dredging. There are likely to be temporary negative aesthetic and recreational impacts during the dredging. Potential Bathymetry after Dredging Depth (ft)Surface Area (ft 2 ) Depth Interval (ft) Volume (yd 3 ) 0149,7700 to 419, ,2254 to 53, ,8895 to 61, ,5006 to Total Vol. (yd 3 )25,453 Volume of Dredged Material (yd 3 )4,610 Figure 1. Map of stormwater drainage into Culler Lake. The red line indicates that drainage area. The yellow lines and symbols denote drains and underground piping for stormwater. Note that a portion of this area collects water for Culler Lake and that a portion of the stormwater is discharged directly into Carroll Creek. Figure 2. Map of Culler Lake indicating sampling points and their corresponding soft and hard bottom water depths. Figure 3. Map of Culler Lake indicating the current depth contours (i.e. the soft- bottom depth). Figure 4. Map of Culler Lake indicating potential contours after dredging (i.e. the hard-bottom depth). Creating Maps: We created maps using data collected from Culler Lake and geographical information systems (GIS) software. A base map of Culler Lake was downloaded from ESRI’s ArcOnline World Imagery server. The lake shoreline was drawn to provide a baseline reference for subsequent data addition. The locations of depth measurements were determined using a hand-held global positioning system (GPS) Some points were not correctly recorded by the GPS unit and later had to be plotted in relation to where they were drawn on a field map. Using soft- and hard-bottom lake depths, depth contours were hand-drawn for each map. Using these maps as a guide, we created GIS-based maps for both soft- and hard-bottom contours. Current Estimated Hydrology Inlet /Outlet Discharge Rate (yd 3 / day) Turnover Time (days) Carroll Creek Inlet Lake Outlet41285 Current Culler Lake Hydrology The majority of the sediments are deposited in the southeastern two-thirds of the lake. There was a large discrepancy between lake outflow and Carroll Creek inflow during a non-storm period. The shallow nature of the lake may allow sediment re-suspension due to winds. Acknowledgements We would like to thank Friends of Baker Park and the Frederick City Departments of Public Works and Parks & Recreation for their help with this project. Results Implications