Project Name 1 Industrial Hygiene Monitoring Introduction To Bayesian Statistics Dave Pearson, Djon Gentry, Tim Allers.

Slides:



Advertisements
Similar presentations
Eduardo J Salazar-Vega, MPH CPH Jan Koehn, MS CIH.
Advertisements

Open Range Software Welcome to a presentation of the Open Range Industrial Hygiene Program.
IH&S 725 Dr. Myers, C.I.H. Compliance statistics Lecture Notes.
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
PMCH 600 INDUSTRIAL HYGIENE October 23, 2006 R. Leonard Vance, Ph.D., CIH.
OHS Worksite Inspections February Health & Safety Systems > The goal of any health & safety system is to eliminate or reduce as far as is practicable.
Realism in Assessment of Effort Estimation Uncertainty: It Matters How You Ask By Magne Jorgensen IEEE Transactions on Software Engineering Vol. 30, No.
Elizabeth L. Pullen, CIH APOSHO 26 & Australasian
Topic 6: Introduction to Hypothesis Testing
Hypothesis Testing: One Sample Mean or Proportion
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
1 Establishing Similar Exposure Groups Lecture 4.
Lecture 10 Comparison and Evaluation of Alternative System Designs.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
STATISTICAL PROCESS CONTROL SPC. PROCESS IN A STATE OF STATISTICAL CONTROL.
Choosing Your Primary Research Method What do you need to find out that your literature did not provide?
1 Psych 5500/6500 Statistics and Parameters Fall, 2008.
PMCH 600 INDUSTRIAL HYGIENE October 22, 2007 R. Leonard Vance, Ph.D., CIH.
How to Fill Out the CARD Form (Course Assessment Reporting Data Form)
Energy Facility Contractors Group Safety Working Group Industrial Hygiene / Industrial Safety Technical Team Dina Siegel, Los Alamos National Laboratory.
PMCH 600 INDUSTRIAL HYGIENE October 19, 2011 R. Leonard Vance, Ph.D., CIH.
West Virginia University Laboratory Training Module 1. OSHA Laboratory Standard.
1 Occupational Air Sampling Strategies – who, when, how…. Lecture Notes.
Risk Assessments/Risk Appetite Judith Gruenbaum 1.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
1 Cronbach’s Alpha It is very common in psychological research to collect multiple measures of the same construct. For example, in a questionnaire designed.
Using a Comprehensive Occupational Exposure Database to Integrate Members of the Occupational Health Team and Improve Your Occupational Health Program.
Psyc 235: Introduction to Statistics DON’T FORGET TO SIGN IN FOR CREDIT!
Career Report Career Comparison Chart Career Comparison Chart
The Art of Estimating Programming Tasks Adriana Lopez Development Director Dragon Age II.
Lecture 16 Section 8.1 Objectives: Testing Statistical Hypotheses − Stating hypotheses statements − Type I and II errors − Conducting a hypothesis test.
Section 10.1 Confidence Intervals
1 Chapter 3 1.Quality Management, 2.Software Cost Estimation 3.Process Improvement.
Industrial Hygiene Exposure Predictor Model 2009 DOE Integrated ISM Conference August 26-27, 2009 Saul J. Chessin, CIH Idaho National Laboratory.
6.1 Inference for a Single Proportion  Statistical confidence  Confidence intervals  How confidence intervals behave.
IH&S 725 Dr. Myers, C.I.H. Occupational Air Sampling Strategies – who, when, how…. Lecture Notes.
Sampling distributions rule of thumb…. Some important points about sample distributions… If we obtain a sample that meets the rules of thumb, then…
Chapter 12 Confidence Intervals and Hypothesis Tests for Means © 2010 Pearson Education 1.
Basics of Biostatistics for Health Research Session 1 – February 7 th, 2013 Dr. Scott Patten, Professor of Epidemiology Department of Community Health.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 2 The.
Experien Health Sciences, Inc. ©Experien Health Sciences, Inc Industrial Hygiene Applications For HPVIS Data John D. Mikan, CIH President, Experien.
Berkeley Lab Exposure Assessment: thoughts after an ISM Audit Tim Roberts, Industrial Hygiene Jim Floyd, ALS LBNL.
IH&S 725 Dr. Myers, C.I.H. Establishing Similar Exposure Groups Lecture 4.
Uncertainty and confidence Although the sample mean,, is a unique number for any particular sample, if you pick a different sample you will probably get.
Spokane Public Schools Digital Driver’s License (DDL) How to Obtain Your DDL.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Chemical Risk Assessment & Exposure Monitoring Quantitative Risk Assessment Revision December Information provided subject to the 'Conditions for.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
OSHA A GUIDE TO THE NEGATIVE EXPOSURE ASSESSMENT.
Working with Equations Mini Activity I. Objectives: The Learner will be able to: 1. Apply Currency formatting to cells in Excel 2. Use the AutoSum tool.
Qualitative Exposure Assessment “How to Build a Better Plan” Dave Dickhaut UAW Industrial Hygiene – Lansing Delta Township Eltaneice Bolden GM Global.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Respiratory protection September 15 th Control Respiratory protection Significant reliance on PPE Excellent practices/procedures required to be.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Chapter 21 More About Tests and Intervals.
Overview of GM Sound Survey Process Eltaneice Bolden – GM Global IH Manager Dave Dickhaut – UAW Industrial Hygienist, Lansing Delta Township.
Success Criteria: I will be able to analyze data about my classmates.
RBEAP Risk Based Exposure Assessment Process
More about Tests and Intervals
Elementary Statistics
Office of Education Improvement and Innovation
EVAAS Overview.
Significance Tests: The Basics
OSHA LEAD STANDARDS.
Examples decision trees to make up IH sampling plans
Introduction to Risk Assessment
Presentation transcript:

Project Name 1 Industrial Hygiene Monitoring Introduction To Bayesian Statistics Dave Pearson, Djon Gentry, Tim Allers

Project Name 2 INTRODUCTIONTO BAYESIAN STATISTICS

Project Name 3 Introduction to Bayesian Statistics What is Bayesian Statistics? –An approach to statistics in which estimates are based on a synthesis of a prior distribution and current sample data. –Belief that something will happen is based on past observation.

Project Name 4 Introduction to Bayesian Statistics What is Bayesian Statistics? – Everyday Example –When you cross a road, you may need to do a full "analysis" of the data concerning oncoming traffic (How fast? How big is the gap? Does the driver look like a maniac? Have they seen me?) but one thing you don't consider: once the car has gone past and I step out on the road; what is the chance that it will back-up and run me over –In essence we've performed a Bayesian calculation based on a lifetime of crossing the road. We have a strong belief, based on experience, that the car will not back up.

Project Name 5 Introduction to Bayesian Statistics Why use Bayesian Statistics? –Quantifiable validation of prior and future PPE & engineering control decisions –To predict future exposures and establish PPE and engineering control requirements –Typical employee works 220 days/year. 4 samples represents roughly 2% of their annual exposure profile –Statistically valid decision making with as few as 3 samples –New EHS Standard requires that a statistical tool be used –Provides a consistent process for IH decision making –Risk Management Decision making based on defensible data

Project Name 6 From: Paul Hewett, Ph.D., CIH & John Mulhaussen, Ph.D., CIH

Project Name 7 From: Paul Hewett, Ph.D., CIH & John Mulhaussen, Ph.D., CIH

Project Name 8 From: Paul Hewett, Ph.D., CIH & John Mulhaussen, Ph.D., CIH

Project Name 9 From: Paul Hewett, Ph.D., CIH & John Mulhaussen, Ph.D., CIH

Project Name 10 From: Paul Hewett, Ph.D., CIH & John Mulhaussen, Ph.D., CIH

Project Name 11 From: Paul Hewett, Ph.D., CIH & John Mulhaussen, Ph.D., CIH

Project Name 12 Trivial Professional Judgment * Highly-Controlled Well-Controlled Controlled Poorly-Controlled * Qualitative Exposure Assessment Input 2 Bayesian Decision Analysis

Project Name 13 Opening & Running the IHDataAnalyst Software

Project Name 14 Starting the IHDataAnalyst Program On your desktop click the IHDataAnalyst icon. Either this Or This

Project Name 15 The Program will Launch

Project Name 16 Input Facility Information Here The facility information should reflect the area where the Industrial Hygiene monitoring data was obtained.

Project Name 17 Input the Substance Information Here. This section would include the chemical name or if the monitoring was for noise, the word “noise” Next, click the drop-down box and select the unit of measure.

Project Name 18 Input IH Data Here Input the monitoring data for the Substance monitored in the “Conc” column. Place a “Y” in the “LOD” column if the data is a less than (<) value.

Project Name 19 Crunching the Numbers Click the “Calculate All” button on the toolbar.

Project Name 20 IH Data Input & Decision Making

Project Name 21 There’ s a lot of Stats in there! Help me sift through it. XO.95 = 95% of your data should fall below this point. 95%UCL = 95% confident that any new data will fall below this number based on existing data. BDA Charts – Indication of how well controlled your process is. PPE Charts – J&J IH has agreed to use “75% or >” for deciding if PPE is warranted and the appropriate APF.

Project Name 22 Example 1 Ethinyl Estradiol All samples less than half the OEL

Project Name 23 Example 1 All 5 samples < XO.95 95% UCL

Project Name 24 Example 1

Project Name 25 < 75% What Is Your Decision?

Project Name 26 Removed “<“ Decision Probability Increased

Project Name 27 Added one more data point. Now > 75%. Feeling more comfortable with Making decision for no respirators DON’T FORGET TO CALCULATE ALL!!!

Project Name 28 By doubling the original data Resulted in

Project Name 29 Doubled the data. Greater comfort in PPE decision Now 84.5%

Project Name 30 Report Format What does this program provide as far as from a written document?

Project Name 31 Report - Example 1

Project Name 32 Report - Example 1

Project Name 33 Report – Example 1

Project Name 34 Report – Example 1

Project Name 35 Example 2 Cobalt dust/fume Sample results at or less than OEL Look at your data. What is it trying to tell you? Knowing when to take additional samples and knowing when to stop sampling and implement controls.

Project Name 36 8 data points ranging From 1/10 to 1 X OEL

Project Name 37 BDA Charts = 4 Poorly Controlled

Project Name 38 PPE Charts = 10X

Project Name 39 Decision Making BDA Charts indicate Poorly Controlled PPE Charts indicate the need for 10X APF What are your next steps? Make sure employees performing this work are included in the RPP, Med Surveillance, and provide a minimum of 10x protection respirators. Do you think that obtaining additional samples will help at this point? Probably Not at this time Enhance engineering controls, then re-sample After engineering controls have been implemented, new data collected should be separated from the previous data collected during Poor Controls

Project Name 40 Example 3 8 Hr TWA vs. Task Duration You obtain samples during a specific task The task lasts approximately 30 minutes for the day Confirmed no other exposure to this or similar compounds the remainder of the day Compound being measured does not have acute hazards associated with it and there is no assigned STEL. What decisions are you making based on the sampling results?

Project Name 41 Example 3 – 8 Hr vs. Task All results are from sampling 30 minute task Results are 1 to 3 X OEL (No STEL)

Project Name 42 Example 3 – 8 Hr vs. Task PPE Charts indicate the need For employing 10X APF

Project Name 43 Example 3 – 8 Hr vs. Task However, if one were to convert results from lab into 8 HR TWA, assigning ZERO remainder of the day

Project Name 44 Example 3 – 8 Hr vs. Task The PPE Chart now indicates No Respiratory Protection needed

Project Name 45 What Decisions Are You Making? Are you “In Compliance”? Is compliance the only thing we should be looking at here? What are you doing in the absence of an STEL? Are you confident that the compound has no acute effects? Does your compound have an R-Sen D-Sen notation on the MSDS?

Project Name 46 Can We Make A Decision With Just 3 Samples?

Project Name 47 Can We Make A Decision With Just 3 Samples? 44% Confident with 10X 85% Confident with 25X 97% Confident with 50X

Project Name 48 QUESTIONS?