May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
BaBar: The Detector Richard F Boyce 21 October 2003.
March 23, 2009H.J. Krebs1 BaBar D&D Schedule & Budget Overview H. James Krebs March 23, 2009.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
3 March 2009M. Breidenbach1 SiD LoI Costs M. Breidenbach.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Blair Ratcliff, SLACUS R&D Meeting, Sept. 3, 2008 DCH R&D- Italy.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
August 6, 2007Bill Wisniewski1 D&D Task Force: PEPII team: S.DeBarger, S.Ecklund, A.Hill, D.Kharakh, M.Zurawel BaBar team: H.J.Krebs, S.Pierson, W.Wisniewski.
Question and Answer 1) A weighted Monte-Carlo ray trace of particles exiting the target/magnet assembly for all primary beam energies showing: a) Where.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Magnetic Fields in s/f/ePHENIX John Haggerty Brookhaven National Laboratory.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Backward EMC Task Force Report – Elba Backward EMC Task Force Dave Aston, Gianluigi Cibinetto, Steve Robertson, Achille Stocchi, Bill Wisniewski.
SuperB Gen meeting Oct 5-9, 2009 IR Interface 1 IR Interface Issues M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, P. Raimondi, et al.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Roberto Calabrese Ferrara University and INFN
SUPERB site status report for layout v12
MDI Issues M. Sullivan For
STRAW TRACKER SYSTEM CAD STATUS :
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Facilities, Assembly, Integration
Bill Wisniewski SuperB Frascati Meeting September 30, 2010
Transport Issues for EMC Barrel
Update of experimental hall in Japanese mountain site
SiD Solenoid Status and Plans
Workshop Goals for the Detector Groups
SiD LoI Costs M. Breidenbach 29 July 2010 M. Breidenbach.
IFR detector mechanics
First of all we will remind some numbers:
The IR beam pipe M. Sullivan For
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Challenges for FCC-ee MDI mechanical design
Integration and IR Hall
DET. Integration Inner detector envelope Radial clearances.
SuperB Integration Summary of previous integration sessions.
Inner DET. Integration Inner detector envelope Radial clearances.
as a prototype for Super c-tau factory
SuperB Integration Summary of the Integration Status
IR Beam Transport Status
Presentation transcript:

May 31, 2010Bill Wisniewski1 Mechanical Integration Issues

2 Integration for TDR Technical questions to be resolved: –Reuse of BaBar steel yoke: The steel can be reused for the IFR. Better coverage for outermost barrel layer if the suspension of the sextants is modified. Engineering on supporting sextants at corners instead of multiple flats at the ends of the sextants is ongoing: –Are the changed deflections harmful? The plate deflections in the sextants may increase and pose a limit on detector thickness/installation. –Need to understand the added load from filling additional gaps as well. –Is the support provided to DIRC, EMC compromised? Needs to be resolved by year’s end. Massimo is modeling the steel and alternatives. –BaBar construction of little help here, since most of history is lost, but searching continues.

3 Integration for TDR –More on the steel: plug changes DCH exploring option of thinning the electronics on the chamber, moving processing off the backward end of the chamber. BaBar (left): 4 holes are 130mm in diameter: 2 used for DCH cables, 1 for DCH services, 1 for support tube. SuperB: DCH would need 3+ holes to carry the cables. Enough space. But…

May 31, 2010Bill Wisniewski4 The Plugs Though there is enough space for the cables in existing holes, there will be insufficient space for services. Could add extra holes. But… The holes are poorly located: the backward EMC will block the holes. We also need to take out the backward EMC cables. Forward endplug will need to be modified to accommodate beam pipes. Particular geometry of the existing forward and backward plugs was chosen to limit the field on PEPII Q2 magnets. This constraint is gone. Backward plug, with compensating coil and steel cylinder shield also limited field on DIRC SOB PMTs. Change in needs at forward and backward ends means that design of plugs needs to be reinvestigated. Forward plug may only need to be ‘shaved’. Backward EMC design and channel count pushes for a monolithic annulus. DCH and EMC cables push for slots distributed in phi? Mechanical stability of altered plug in field? Concern to be kept in mind when considering redesign: effects on central field (expect little); effects of unbalanced forces on the solenoid coil. Overall understanding of the field may be very time consuming.

5 Integration for TDR –More details of the steel: Plug redesign consequences need to be done in time for detector design finalization (DCH, BEMC) Would be best to have detailed plug design by TDR, but likely to be OK if it slips later. –Cryo Plant: Credible cryo plant solution. Needed for costing more than as a technical issue. Conservative estimate for the TDR may suffice. Weisend, before he left, did an evaluation of the existing plant at Frascati…..

May 31, 2010Bill Wisniewski6 Cryogenics Plant Does the DAΦNE Frascati plant have sufficient capacity for the superconducting IR magnets and the detector solenoid? Weisend asked to look at this. Data gathered from Tomassini and Monarche (thanks!).

May 31, 2010Bill Wisniewski7 Cryogenics Plant 1 st Look Personnel issue: Weisend left SLAC for MSU. May have some cycles before September to refine the evaluation, but we need a long term solution. Perhaps Craddock, but better if a local engineering takes this on.

8 Integration for TDR Technical questions to be resolved: –Transport of detector components: Coil can clearly be transported via air. Frame exists, but part is damaged and needs to be re- made. Will be done as part of D&D. –Sufficiently mature for TDR now. EMC barrel: engineering analysis that transport of the barrel as a monolith is possible. Credible scheme for transport (credible preliminary design needed). Issue: Do we need to disassemble EMC? –Needs ~6 engineer months? Needed for costing and if not possible, may have schedule implications. –Finding the lost: CAD files found, includes reasonably detailed 3D… –Needs to be done ~quarter year before the TDR is complete.

9 Integration for TDR Technical questions to be resolved: –Transport of detector components: Steel: cost estimate for transport needed for TDR. –White paper estimate will be crude. –Needs perhaps purchasing agent + engineer time. DIRC bar box support frame transport analysis and design of support frame cradle for transport. – Needs a few months of engineering. Would be good to have for the TDR, but this is a less pressing issue than EMC transport.

10 Integration for TDR Technical questions to be resolved: –Preliminary design for the support of the SVT and final focus. Needs settled IR. –Cryostats define the inner radius of DCH. Cryostat design is preliminary. Firm up. Credible design for cantilever support, installation scheme needed (push-pull).

11 Integration for TDR Technical questions to be resolved: –Support of tungsten shields Need exploration/analysis of different support points: –EMC? But will the flexible supports bear this new load at the forward end? –DIRC SST at rear? Backward bridge/plug? Effects on detector as a whole? –DCH? End wall thickness? –Newer item, not clear how much engineering time this nightmare needs. Need a credible conceptual design for the TDR, a quarter year in advance of the TDR. This one is hard.

12 Integration for TDR Technical questions to be resolved: –Support of Backward EMC: Off the backward plug? A separate spider? –Concept needed for TDR.