K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.

Slides:



Advertisements
Similar presentations
RTEMS and Linux at the Canadian Light Source Tony Wilson Canadian Light Source University of Saskatchewan.
Advertisements

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL Challenges and Developments.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
1 Tom Himel 1 Status of the Linac Controls Upgrade LCLS FAC review Status of the Linac Controls Upgrade Tom Himel June 8, 2009.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
ICS – Software Engineering Group 1 SNS Power Supply Control Sheng Peng.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
18. June 2003EPICS WS Control of Digital Power Supplies Andreas Lüdeke Swiss Light Source / PSI 20 May 2003 EPICS Collaboration Meeting.
Power Supply Controller Architecture
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Digital Interface for MCOR’s Stan Cohen Albuquerque, NM From the June 9, 2005 presentation by Dr. Stan Cohen - notes on slides 11 and 12 added.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
K. Luchini LCLS Week, October 26, 2005 Magnet Controls K. Luchini Overview Hardware Software SLC Aware IOC Database Modeling.
FECC/SAIOC/RTEMS Making Lemonade. FECC “Slow” Code (in PC) –Ported iRMX code –By Bob Sass and Tony –As little hand work as possible –EPICS OSI layer –Dual.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
PSI Power Supply Controls MedAustron Controls Workshop 1 PR a-FMO-PSI_Power_Supply_Controls.pptx F. Moser - PSI Power Supply Controls 1.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
AIP /02 P Bellomo - QE Magnet Power System Upgrade
LLRF and Beam-based Longitudinal Feedback Readiness
Magnet PS Controls Hardware Status
Control System Network
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Power Supply Control for BEPCII
Magnet Controls K. Luchini
LLRF Control System Outline Scope Requirements Options considered
Low Level RF Design Outline Scope Requirements Options considered
Low Level RF Status Outline Overview showing hardware instances
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Rack installation and local tests for the MEBT Chopper Rack
SLC-Aware IOC Magnet Functional Requirements
Presentation transcript:

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software Documentation Schedule

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Overview Machine sectors with Magnets Existing magnets LINAC Most: unchanged. Controlled by SLC Control System micros Few :swap out ps and ps controller TBD: sect 21-29,30 QE’s bulks ps but lcls has different current req BSY – unchanged (w/one addition) New Magnets Injector LTU Most refurbished FFTB magnets with new ps and ps controller. All correctors will all have 120Hz fast feedback control BSY – One new magnet, new ps and ps controller Special double duty magnets LINAC magnets in sector 23, sector 29 and sector 30. Total: New Existing 282 = 452

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Hardware Test Stand PSI 24V/10A PS with PS Controller PSI VisualECS PC Software Load PS Controller Evaluation Long-term stability with various current values Analyze the PS operation sand current ripple around 0A Measure the combined bandwidth of the PS + controller w/resistive and inductive load Current ripple for various current values Output voltage ripple for various output current values Interlock action PS operations and stability w/operating temperature up to 40 deg C. Preliminary Results Two stability tests with the PSI controller connect to a corrector ps in two cases of current feedback By shunt system that came with the unit ( ) By precision Danfysik DCCT ( )

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 VisualECS Diagnostic Display

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Software Test Stand PowerPC Processor vme64X crate SBC IP Carrier – VIPC664 PSI IP-Pac – Single port controls 2 ps controllers PSI TM Module - 8 channel FO (2 ports/channel) PSI PS Controller Chassis PSI PS Controller Software EPICS SW with database. Upgraded to EPICS OSI independent R Troubleshooting Reverted to known working version with vxWorks OS Determined problem was faulty ps digital controller card PC Diagnostic Software – PSI Visual ECS version 2.03 Runs from controller chassis front panel service port. EDM displays downloaded from Diamond

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Documentation Web page (under construction) Engineering Specification Document (ESD) SLC-Aware IOC SLC Magnet Functional Requirement Document SLC Magnet Design Document EPICS Magnet Functional Requirements document EPICS Design Document Task List – (under construction)

K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Schedule Simple communication between Alpha & SLC IOC Aware Magnet Hndlr (June) Estimate PS Evaluation Complete (May) Ongoing work Calculate AC Power requirements for buildings Calculate # of new ps Calculate ps current required within 10%. Improve upon original BOE Determine optimum PSI ps chassis configuration and layout Rack profiles and location of free standing ps Cabling and cooling requirements List and answer any open questions Weekly Magnet Meetings with physicists, power conversion engineers, hw engineers and sw controls LTU/Dump/DSY – Underway LINAC – Underway Injector Complete list of ps, ps controllers, and VME modules for Procurement (Summer 2005)