Innovation quality reliability Successful Containment During Ship to Ship Operations Peter Hoyle November 2015.

Slides:



Advertisements
Similar presentations
Lessons Learned from the Application of Risk Management in the Shipment of LNG.
Advertisements

EST 70m Polar Ice-class 5 Ocean Oil Skimmer Ship.
Above Ground Storage Tanks &
Thermostats, Pressure Switches, and Other Electric Control Devices
ROMANIAN AGENCY FOR HUMAN LIFE RESCUE AT SEA CONSTANŢA.
EST 70m Polar Ice-class 5 Ocean Oil Skimmer Ship.
Development of the Ballgrab Technology Concept to Assist in ROV Subsea Intervention Stephen Dunbar Cranfield University.
Salt water system. Function Hot Domestic service Cold Domestic service Fire main Sprinkler system Deck Wash Ballast system Engine and Equipment cooling.
IDENTIC AB Presentation of IDENTIC and the IDENTIC system for AdBlue
Calibration using the Test Strip Method (Long Hand) Cecil Tharp Pesticide Education Program Montana State University Extension.
Measuring Erodibility of Cohesive Soils By Gregory J. Hanson USDA-ARS Hydraulic Engineering Research Unit.
Adaptive Adjustable Wakeboarding System Lorielle Alter 1, Cory Gerken 2, Lauren Mitchell 3, Nick Pilkington 2, Katy Serowka 1 Advisors: Dr. Paul King 1,
Emergency Response Service IASST Safety Seminar September the 20 th 2010 Alexis CARAUX Head of Emergency Response Service.
PORTABLE TEMPORARY PIG LAUNCHER thomas cornthwaite
Ship Design & Engineering
High Efficiency Commercial Gas HCG Series. 2 American HCG Series The HCG Series High Efficiency Commercial Gas Water Heaters embody all that’s great about.
Introduction to Safety Relief Systems
Question: What will happen if you pour oil into water? Why?
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 8 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT ww.osh-project.org THE OIL SEA HARVESTER.
Ship Design & Engineering
CENTENNIAL HYDRAULIC ISOLATION CONTROL SYSTEM (CHICS) Peter Bergin Trevor Hartley Centennial Newstan In conjunction with APT Training.
OIL SPILL RESPONSE EQUIPMENT AND PLANNING STANDARD SPREADSHEETS.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Connecting to industry 1. 2 Safety Break-away Couplings.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Module C Sprinkler systems (4-20)
Practical considerations for pumping sulphur dioxide or other materials to the stratosphere H.E.M. Hunt & K.A. Kuo University of Cambridge Engineering.
WHATEVER YOUR ACCESS NEEDS ARE, FROM STANDARD TOWERS, FOLD-EASY QUICK ERECT BASE UNITS, OR OUR SPECIALISED STAIRDECK TOWER SYSTEM WITH OUR EXTENSIVE.
14.1 The Gas Laws > 1 Copyright © Pearson Education, Inc., or its affiliates. All Rights Reserved. Chapter 14 The Behavior of Gases 14.1 Properties of.
HVAC523 Circulator Pumps.
1 5 September, 2015 Different Retorts for Different Products & Packages by Rajiv Sood.
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
The Invisible Flood Control Wall ™ Flood Control America presents.
4 Chapter Power Tools and Equipment.
Innovative Mooring & Fendering Technology for the Sea Base Dave Liese, PMS 325 Joint Sea Based Theater Access Workshop Duck, NC 8-11 February 2005 Draft.
Chapter 3 – 1 Discussion Notes Chapter Overview -Chapter 3 identifies the components and benefits of physical fitness and presents the basics of an exercise.
Aerial Apparatus Operator Positioning Aerial Apparatus.
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
High Speed Vessel Fendering System Design Presenters: Cameron Clark Dave Maharaj Okason Morrison Jean-Pierre Njante Alexandra Ortiz Advisor: Prof. Sadegh.
Risk reduction and response scenarios BE-AWARE II Final Conference, November, Ronneby, Sweden Co-financed by the EU – Civil Protection Financial.
17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.
Calibration of your Field Sprayers using Shortcut Methods
TGYDGL09 Project DEPLOYABLE RAPID DIAGNOSTIC LABORATORY MOBIOCHEM Ltd.
Innovation quality reliability Komara 7 Skimmer System (Formally Komara Mini) December 2015.
Innovation quality reliability Vikoma Vikoflex Boom System December 2015.
Field Test Comparisons of Drift Reducing Products for Fixed Wing Aerial Applications Robert E. Wolf, Kansas State University, Manhattan, Kansas Dennis.
Innovation quality reliability Vikoma Bulkhead Boom System December 2015.
Innovation quality reliability Vikoma MOSS Skimmer System (Multi Oil Skimming System) December 2015.
Innovation quality reliability TC3 Helicopter Oil Spill Dispersant Spray System December 2015.
(Formally Kormara Midi)
Anchorage #9 Ship Booming Demonstration Overview PISCES II - Projections.
Leg Compression Device to Assist in Ultrasound Testing for Deep Vein Thrombosis Design Team: Mark Rawls and Jordan Winston Advisors: Dr. Raul Guzman and.
Innovation quality reliability Vikoma Neoprene Shoreguardian Boom System December 2015.
Innovation quality reliability Delta Skimmer System December 2015.
INDUCTION GENERATOR FOR WIND POWER GENERATION
Intelligent Assist Device ?
Optimum Pump Performance for Process Applications
Tools and Equipment Fundamentals
Storage tank scanning with Trimble TX5 Scanner and Storage Tank Application Filip Jinnestrand, 2013.
Ship to Turbine (STT) TM
Safety–Training Media Dev 2010-교육미디어-1019
BRAKES BY : VISHAKH V.
High Pressure Water Jetting
THE OIL SEA HARVESTER SYSTEM :
- Intro to Energy & Society Unit -
9.0 Getting Started What’s the secret to making good popcorn?
Robotics Lifting Things
Work at Height January 29, 2019 Paraic Brennan
Suspension Systems - 2 Topics covered in this presentation:
Presentation transcript:

innovation quality reliability Successful Containment During Ship to Ship Operations Peter Hoyle November 2015

Oil recovery solutions since 1967 OVERVIEW 2 Vikoma is the world leader in the design and manufacture of oil spill response equipment which has been helping to protect our environment for over 40 years. We have built our reputation on: Quality Reliability Innovation

Oil recovery solutions since 1967 Introduction 2  Conventional Methods  What is it?  How Does it Work  Different Applications  Key Features and Benefits  Questions & answers

Oil recovery solutions since 1967 OVERVIEW Vikoma offers quality equipment for each stage of an oil spill operation, including booms, skimmers, tanks, powerpacks and pumps. Vikoma can also offer a range of oil spill response vessels, dispersant spray systems and a range of ancillary equipment, making the job quicker, easier and more effective. Quality equipment for every scenario Containment Recovery Storage

Oil recovery solutions since 1967 CONVENTIONAL METHOD ONE Problems with this Method Additional Vessel Required Large amount of Boom (this example over 250m) Fast Deployment Boom (such as rigid fence) is compromised by wind & swell.

Oil recovery solutions since 1967 CONVENTIONAL METHOD TWO Problems with this Method Hull paint reduces Magnet strength. Attaching Magnets at the correct height is difficult. Detaching Magnetic Connectors can damage Hull Painting. Alterations in vessel heights can lift or submerge the fixed boom. REQUIRES OPERATORS TO WORK BETWEEN THE VESSELS WHICH IS A POTENTIALLY DANGEROUS ENVIRONMENT.

Oil recovery solutions since 1967 CONVENTIONAL METHOD TWO CONT… Start of Transfer Mid/ End Transfer Problems with this Method When the freeboard heights change the fixed boom can be compromised. The boom is affected by multi-directional forces (Horizontal and Vertical). The impact of multi-directional forces creates stresses and material failure.

Oil recovery solutions since 1967 VIKOSEAL BOOM Inflated using Vessel High Pressure Air Supply Built in Auto-levelling function. Creates a seal whilst compensating for Fender Squeeze or Fender Drift. Detachable Skirts and Hammerhead wear plates. Includes over inflation safety features. Can be used as emergency response or in-situ for standby containment.

Oil recovery solutions since 1967 INFLATION METHOD The boom rapidly and evenly inflates forming a seal between the two vessels. The boom is designed to expand to a greater distance than the specific fender to accommodate Fender Drift. To allow for Fender Squeeze the boom automatically forms a parallelogram to maintain integrity.

Oil recovery solutions since 1967 INFLATION METHOD TWO By partially deflating the central chamber the tension between each end of the Vikoseal boom and the vessels is reduced allowing the boom to auto- adjust in under 10 seconds. This operation is quickly and easily carried out from on-board the vessel without requiring any water level assistance.

Oil recovery solutions since 1967 EMERGENCY RESPONSE VESSEL 1 VESSEL 2 FENDER

Oil recovery solutions since 1967 EMERGENCY RESPONSE TOTAL INFLATION TIME FOR 4.5M BOOM IS 20 SECONDS

Oil recovery solutions since 1967 PERMANENT DEPLOYMENT VESSEL 1 FENDER

Oil recovery solutions since 1967 Introduction 2  Conventional Methods  What is it?  How Does it Work  Different Applications  Key Features and Benefits  Questions & answers

Oil recovery solutions since 1967 Questions Q & A

innovation quality reliability Vikoma International Ltd Kingston Works, Kingston Road East Cowes Isle of Wight PO32 6JS. UK T: (0) E: W: