The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova

Slides:



Advertisements
Similar presentations
The ANTARES Offshore Data Acquisition A Highly Distributed, Embedded and COTS-based System S. Anvar, H. Le Provost, F. Louis – CEA Saclay DAPNIA.
Advertisements

NEMO Fase1 OPTICAL DATA TRANSPORT F. Ameli, M. Bonori, I.N.F.N. Sez. Roma1. VLVυT - Amsterdam 5-8 October Architecture Working Group NEMO Phase 1.
A.Margiotta, SNOW 2006, Stockholm, 6 May 2006 Status Report of the NEMO Project (NEutrino Mediterranean Observatory) Towards a km 3 Neutrino Telescope.
Beurthey Stéphan/CPPM/IN2P3 16/04/07 KM3 design to cost Mechanic optimization.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
Status of the ANTARES Neutrino-Telescope Alexander Kappes Physics Institute University Erlangen-Nuremberg for the ANTARES Collaboration WIN´05, 6.–11.
Power Budgeting in Distributed Systems.  Single transmitter signal distributed to two or more receivers via optical splitters Transmitter Receiver #1.
Aloha Proof Module Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
AtacamaLargeMillimeterArray Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain Fibre Optic Links for IF DTS Roshene McCool Jodrell Bank.
System Performance Stephen Schultz Fiber Optics Fall 2005.
Chapter 8 Basic System Design.
By E. Anassontzis, A. Belias, E. Kappos, K. Manolopoulos, P. Rapidis on behalf of the KM3NeT Collaboration.
Plan Projects – Current status S.Sureshkumar, Engineer E Fiber Optics and RFI Group.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
Amsterdam 29 March 2011 Fernando Urbano IFIC (CSIC – Universidad de Valencia) KM3NeT Optical Calibration Laser Beacon and Nanobeacon Status.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
Chapter 8 Basic System Design. System factors for designing from scratch: Design Verification FactorAvailable choices Type of fiberSingle mode, multimode,
INFN Bari, Bologna, Catania, Genova, LNF, LNS, Napoli, Pisa, Roma Università Bari, Bologna, Catania, Genova, Napoli, Pisa, Roma “La Sapienza” CNR Istituto.
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
 NEMO The NEMO Status Report M.Taiuti on behalf of the NEMO Collaboration Merida, Yucatan, Mexico 30th International Cosmic Ray Conference.
Isabella Amore Laboratori Nazionali del Sud - INFN, Catania International School of Cosmic Ray Astrophysics 15th Course: "Astrophysics at Ultra-high Energies"
Control Module production M. Circella, ANTARES-SC meeting, CPPM April /39 Summary: LCM integration & PRR (in particular: integration rehearsal of.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Shore Station1 EFNI H K Shore Station Block diagram Form factor Power setup Special for BARI Special for MILOM Planning Outcome of brainstorm.
The ANTARES Project Sino-French workshop on the Dark Universe Stephanie Escoffier Centre de Physique des Particules de Marseille On behalf of the ANTARES.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
NEMO-O DE NEMO First results from the NEMO Test Site G. Riccobene, for the NEMO Collaboration The NEMO Collaboration is performing the Phase 1 of the project,
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
Update on Optical Fibre issues Rainer Schwemmer. Key figures Minimum required bandwidth: 32 Tbit/s –# of 100 Gigabit/s links > 320, # of 40 Gigabit/s.
Angelo Orlando for the NEMO collaboration VLV T08, Toulon, France April International Workshop on a Very Large Volume Neutrino Telescope for.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
Some developing ideas on Seafloor cabling and copper/fibreoptic split points where this talks builds and borrows from the work of VENUS, MARS, NEPTUNE.
Deep-sea neutrino telescopes
On behalf of Patrick Lamare
Data transmission characterization with underwater copper link
M.Taiuti on behalf of the NEMO Collaboration
Block Diagram Transmitter Receiver × 2 Transmitter Power Supply ADC
Els de Wolf 20 February 2012, Catania
Chapter 7 Basic System Design.
Data transport architecture over fiber and/or copper
Junction Boxes for KM3NeT
PPM-DOM. SPM DOM LCM SS-part ILxx
SC of KM3 Vidyo meeting of Thursday, February 18
Chapter 7 Basic System Design.
Final (?) line_0 configuration (follows steering group consideration 5/5/2004) Line Zero meeting, Nov
Nanobeacon: A low cost calibration instrument for KM3NeT
Presentation transcript:

The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova

The Goal Deploy an Antares String jointly with the NEMO phase 2 tower to take enviromental measurements of the 3500m deep site comparables with the 2500m deep enviroment of Antares detector

three storey linked by a 100 m electro mechanical optical cable (EMC). similar to the MILOM line deployed in the Antares site in no acoustics and LED beacons present Proposed configuration

Branching unit The underwater proposal in Capo Passero

Sites Differences The new site is: 1 Km deeper 100 Km far away from shore DC Power Supply Different optic fibers type in the elettro- optical main cable

Primary tasks Qualify mechanical structures for the new pressure values Adapt the string power system to the new configuration Verify that the DWDM communications can be performed using the new cable

Present Status  qualification of the Ti containers we used the hyperbaric chamber at the NEMO shore station in Catania: 24 bar + 7 full cycles bar  qualification of a new design electro optic penetrator from SEAPROOF 7 optic fibres and 7 electric conductor tested and qualified at IFREMER in Brest  acceptance tests of the 3 EMC cables 100 m long Tests performed at the facility in Brest  Ocean Design Inter Link system defined and ordered  top buoy, 6 OMs available  New BSS components available; will be assembled in our shop  electronics and DAQ hardware under test in Genova received 1 SCM +2 LCMs, clock and DWDM systems  Power board (SPM substitution) designed and under test in Genova

Tests in hyperbaric chamber at 400 bar (3300m x 1.2) of the Antares LCM containers we used the hyperbaric chamber at the NEMO shore station in Catania: 24 bar + 7 full cycles bar test was successful on 3 LCM containers

Electro Optical connector from Seaproof LCM container Opt fibres are brought from to the pressure barrier, and directly feed thru the barrier block. The electrical conductors are terminated each side in solder pots on the pressure barrier

Qualification of connectors and cable Tested using the pressure tank in 400 bar 1 loop for the optic fibres (22 x 7 = 154 m) 2 loops for the conductors measure of -electrical insulation -electrical resistence -optical attenuation

proposed solution (cost effective) 1 interlink cable New model using an interlink cable directly attached on the BSS In order to avoid that water penetration in the Titanium containers damages the string components or cause the DC/DC switch to protection mode we insert a fuse box in the underwater interconnecting cable Tasks in progress : New BSS Model

The new BSS model

The ‘fuse’ box fuse type: LIMITRON KTK3 12 Amps) diode : high power rectifier 1kV, 200 Amps from the DC/DC converter to the SPM

The splice canister containing the ‘fuse’ box

Configuration of the SPM/SCM upper cylinder: The DC/DC converter of Capo Passero directly provides 380 V DC: no additional AC/DC trasformer needed! The SPM substitution board which includes a microcontroller has been designed to: manage the power to the line filter out the noise from and to the DC/DC converter interface, via a RS485 line, the controls with the SCM. provide the same protocol specs used in the original Antares SPM sense the power dissipation and the temperature Actually the functional tests are finished and endurance test under high current load values are in progress. lower cylinder: same SCM as for Antares without acoustic boards

The SPM substitution board

1 SPM and 2 LCMs available from Pisa and Bari 1 MLCM: to be integrated in Bari The shore station computing section is realized; 2 (+1) Pentium D class workstation with 2GB RAM. available Clock and DAQ software rebuilt on this architecture Clock software has been modified to work without the GPS signal (not needed in our application) We are now testing the sofware configuration using the SCM and the same SCM Vxworks OS used in Bari to perform the integration tests. General tests on the complete system will be done before assembling at CPPM DAQ and electronics status

DWDM Communication Computed the new optical budget values Computed the chromatic dispersion value Communication test under high optical attenuation condition

Optical Budget for the DWDM System used in the Capo Passero Antares String (Sea to Shore direction) MLCM DWDM (top) to DWDM Mux connections (only 3 storey)~ -0.1dB 300 m SMF28 string cable (EMC)~ -0.1dB DWDM Mux~ -3.0dB Splice DWDM Mux to fiber~ -0.2dB Splice in SPM~ -0.1dB 200 m Cable from SCM to DC/DC converter connector~ -0.3dB Underwater connector on DC/DC converter~ -3.0dB Splice in DC/DC converter between connector and 100Km fibre~ -0.3dB 100Km fibre~ -20dB On Shore fibre splice~ -0.2dB DWDM Demux~ -3.0dB Splice DWDM Demux~ -0.2dB Total Optical Losses~ -30.5dB Nominal Laser Output Power CQF915/208~ +7dBm Nominal APD sensitivity ERM577~ -32dBm Total Optical Margin~ 39dB Optical Margin~ 8.5dB

Chromatic Dispersion In original Antares Cable: <21 ps/nm km Cable length: 50 Km In Capo Passero Cable: [ ] ps/nm km Cable length: 100 Km The new Dispersion value is less than the original antares one

Communication Tests In order to validate the computed optical margin we use variable optical attenuators to simulate the 100 Km cable attenuation

DWDM Boards and Power supply SCM Module Optical attenuators 0-30dB Clock station And control workstations Shore station and communication tests

The proposal was submitted 2 years ago when the ‘bio’ activity in the Antares site was very high the multi site solution for the km3 was not yet explored During this time some new R&D has been developed - electro optic penetrator - simplified version of the BSS - configuration of the IL some new results in detector simulations makes interesting the in situ comparison of the two different available structures..... The string will be deployed with the NEMO tower after the deployment of the Alcatel DC/DC converter (expected at the end of 2008) Conclusion