Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
Basics of Fire Sprinkler Design
Mechanical Plan Review. Review Plan Package Use Group/Occupancy Correct Code Reference/Conformance Revisions Mechanical Plans/Spec Books Structural Plans.
Backflow Preventor. (4) The Contractor V may install the cross-connection backflow prevention device as defined in this chapter on new installations.
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
CEA F INAL E XAM R EVIEW These are the topics that will be on the final.
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Building Codes Violation of building codes and regulations can cause injury to building users and expose architects to legal liability and the possible.
Chapter 9. Please read chapter 9.  Please review, know and understand the terms related to fire protection page 284.  Know the Classifications of.
Fire Protection Engineering and Building Code Analysis Presented By: Harold D. Hicks P.E. President Use space bar or left mouse button to move through.
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
PETROSAFE Petroleum Safety & Environmental Services Company.
FPF190: Fire Protection Fundamentals FPF190 Fire Protection Fundamentals 1 Code Consultant.
Permit to Work Procedure Document Number: KOC.SA.004
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Residential Construction Unit 1 Mr. Todzia.  Definition-Legal requirements designed to protect the public by providing guidelines for structural, electrical,
Business Owners and Managers and the Fire Code
Navigating the New NICET Certification Model
Pre Incident Planning and Related Loss Reduction Strategies
Higher Regulatory Standards Series 430. Higher Regulatory Standards 432 Elements Dougherty County (2007 Manual) – Total Points: 2740 – Activity 430.
Occupancy Classification Under NFPA 13 Examine the proposed facility and make recommendation on the Occupancy Classification Used to classify fuel loads.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
ARCHITECTURAL DESIGN Residential Design Criteria 1 1 Copyright © Texas Education Agency, All rights reserved.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
Chapter 10 Fire Prevention. Introduction One of the most important and least recognized jobs that the fire department performs is fire prevention Prevention.
Building Codes. Codes  Building Code –Regional  BOCA, SBCCI, CABO, UBC, CITY OF DALLAS, –National  IBC  Fire Code –NFC, UFC, NFPA, Life Safety 101.
Construction Drawing Occupational Safety and Fundamentals
Specification & Quantities Estimating
1 Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
© 2008 Delmar, Cengage Learning Fire Protection Systems and The Model Code Process Chapter 2.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
NFPA 2 Overview Susan Bershad, Staff Liaison, NFPA.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
CEE 578 Senior Capstone Design Types of Construction Drawings
Sprinkler Loads on Trusses Educational Presentation.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Session 1: Identifying Construction Drawings and Drawing Components.
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
Upon completion of this module, you will be able to:
7 Chapter Plans, Specifications, and Codes. 7 Chapter Plans, Specifications, and Codes.
Safety and Prevention of Typical Fire Plan
How Completed Interiors Are Achieved: Designing & Building
Heating Ventilation and Air Conditioning
Construction Documents
(Refer to Chapter 2 of the textbook)
NFPA 5000 Occupancy Classifications
Borbotech BV • Tel.: +31(0) • •
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Florida Building Commission Lightning Protection Workgroup
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Commercial Construction Projects
M&E SYSTEM.
General Requirements of NFPA 101
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
Fire Alarm Tech Practice Test # 16 NICET
Presentation transcript:

Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1

Fire Protection as a Profession Fire professionals are dedicated to saving lives Serious errors or less than minimal fire protection can lead to death Application of technical knowledge is fundamental Ethical behavior on the same level as technical knowledge

Fire Protection Engineers and Technicians Licensed professional engineer Can apply science and engineering to protect the public from the impacts of fire Fire protection technician: Achieved NICET Level III of IV certification in the appropriate subfield Knowledge, experience and skills necessary to lay out fire protection systems

Fire Protection Engineers and Technicians (con’t.) Functions of a fire protection engineer Fire protection analysis Fire protection management Fire science and human behavior Fire protection systems Passive building systems

Fire Protection Engineers and Technicians (con’t.) Functions of a fire protection engineer (con’t.) Evaluation of the hazards and protection schemes required to develop a workable, integrated solution to a fire safety problem Preparation of design documents Layout of fire protection systems

Fire Protection Engineers and Technicians (con’t.) Functions of a fire protection engineer (con’t.) Affixing a professional seal to documents Review fire protection installation shop drawings for compliance with engineer’s design Monitor installation of fire protection systems Responsibility for designing and maintaining competency through continued education

Fire Protection Engineers and Technicians (con’t.) Functions of a fire protection technician The system layout in accordance with the engineer’s design Shop drawings in accordance with the engineer’s design or as otherwise permitted by state regulations Supplemental calculations based on the engineer’s design

Authority Having Jurisdiction (AHJ) Authority having jurisdiction (AHJ): individual or agency who reviews and approves drawings and completed installations Examples of AHJs Municipal permitting organization Fire prevention officer of the municipality Insurance company Governmental organization Code official

The National Fire Protection Association Publishes more than 290 codes, standards, recommended practices, and guides for fire safety and design of fire protection systems Codes: mandatory requirement suitable for adoption into law Standards: mandatory NFPA requirements that may be used to approve a fire protection system Recommended practices: NFPA documents that provide nonmandatory advice Guides: informative NFPA documents

Site (Underground) Drawings Civil drawings: coordinate underground utilities entering and leaving a building or group of buildings Profile plan: shows reference elevations with respect to finished grade Invert elevation: references the bottom of a pipe with respect to the reference elevation

Architectural Plans Architectural drawings: drawings that show dimensions of walls, floors, ceilings, and other building features Plan job: design performed using new architectural plans as the basis for design Survey job: a project involving an existing building for which plans cannot be obtained

Structural Drawings Structural drawings: provide details related to the floors, roof, and structural elements of a building Foundation plans: show floor and wall structural details and sectional views Framing plans: show beam and joist size and elevation

HVAC Drawings HVAC drawings: heating, ventilating, and air conditioning drawings Supply diffuser: ceiling element used to distribute fresh air to a room Return diffuser: ceiling element used to draw stale air from a room Plenum space: space above a suspended ceiling that is kept under negative pressure for return air

Plumbing Drawings Designated in the contract set with a “P” prefix May show fire protection system piping layout or schematic Water supply and other fire protection-related information may be in the plumbing general notes

Fire Protection Contract Drawings Strong preference in the profession to display all fire protection and detection requirements on a separate set of contract drawings

Electrical Drawings Contract drawing set has an “E” prefix Useful to special hazard and fire alarm system designers Provide the location and power requirements of lighting and other electrical devices Locations of other electrical devices may also be shown on electrical drawings

Specifications Developed by architects and engineers from Standardized computer specification database Revisions to specifications for a project that may conflict with the contract drawings Performance specification: a general specification that provides the minimum information necessary to estimate, design, and install a fire protection system

Automatic Sprinkler Systems Historically successful in protecting life and protecting hazards that are capable of being protected by water Fall into three categories Light hazard (churches, hospitals, schools) Ordinary hazards (parking garages, laundries, shopping centers) Extra hazard (saw mills, textile operations, paint dipping)

Special Hazard Suppression Systems Protects hazards not amenable for protection by an automatic sprinkler system Special hazard categories Large quantities of flammable liquids Facilities containing valuable or irreplaceable commodities Facilities where water may pose a danger

Special Hazard Suppression Systems (con’t.) Special hazard categories (con’t.) Automatic sprinkler systems are not always fast enough for effective suppression Mobile facilities where the transport of water is unfeasible Facilities where service loss is intrinsically linked to facility loss or water damage Facilities where high-tech research lost by fire or water damage could be significantly more than the dollar loss

Design Approaches for Special Hazard Design Requires evaluation of design objectives and design concepts, and implementation of design methodology Design objectives Property protection and preservation Life safety and preservation Business continuity Protection of the environment