Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.

Slides:



Advertisements
Similar presentations
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Advertisements

Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Lutz Lilje DESY -MPY- Summary of the Superconducting RF WG DESY -MPY Overview on talks given List European Assets.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Satish Chandra Joshi Raja Ramanna Centre for Advanced Technology, Indore, India Presentation in Web Meeting with Fermilab April 20, 2009.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
- Generals for PED matters - Definition of pressure vessel and classes - Who is who according to PED - Definition of pressure vessel + codes for XFEL -
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Infrastructure status for XFEL Ing. G. Corniani Ettore Zanon s.p.a. TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Field emission in SRF Cavities
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
WP High Beta Cavities Delivery
Strategy and Status of Reference Cavities for European XFEL
Status and plans for the 3.9 GHz section of XFEL
(4 areas/website front)
ILC-SCRF Test Facilities considerations
Power Couplers, HOM Couplers and Tuners for the XFEL
STF Plan of gradient improvement
DESY Experiences on Use of Gas overlay during Assemblies
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Cleanroom Upgrade in SM18 Optical Inspection bench
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Fabrication of Nb and Cu SPL cavities and required tools CERN status
S0 Status report from KEK
EZ Infrastructure for SC cavities production
N infusion study at DESY
HWR Cavities for China ADS
WP 3 coordination meeting Saclay May 2008
Highlights from EU Global Design Effort
Michael Pekeler RI Research Instruments GmbH Friedrich-Ebert-Str. 1
Degradation and possible sources Statistic of resonators
Development of Large Grain Cavities at DESY
Retreatment of Superconducting Cavities for the European XFEL
Daresbury ESS In-Kind Contributions
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY

Delete this text and put in here: The title of your talk 2 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 Overview on DESY General Infrastructure of DESY covers all subjects for development, fabrication and preparation of super conduction cavities, optimized for 1.3 GHz cavities with up to 9 cell (Well know) - EB welding machine and machine shop - Heat treatment from 1400C to 120 C baking - Surface preparation by buffered chemical polishing (BCP) and electro- polishing (EP) bench - Clean room with high pressure rinsing, chemistry stand and cleaning equipment - Tuning lab - Small chemistry lab

Delete this text and put in here: The title of your talk Overview on Infrastructure cont. 3 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 ObjectNo of SpecialtiesDesign values EB welding machine1P total down <= 1E-8 mbarChamber volume 3,2 *1,6*1,4 (7m3) 800 C UHV oven1Vacuum <= 1E-7 mbar T from RT to 1100 C 4 *1,3 GHz 9 cell a time 1400 UHV oven1Vacuum <= 1-8 mbar T from RT to 1450 C 1*1,3 GHz 9 cell a time 120 C baking stand3Inert gas heating chamber T < 140C located in Hall 3 1* 1.3 GHz Cavity without He service pipe 120 C baking oven (new; under commissioning) 1Inert gas heating chamber T < 130 C located in ISO 4 cleanroom area 1* 1.3 GHz Cavity with out He Tank and fully equipped

Delete this text and put in here: The title of your talk 4 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 ObjectNo of SpecialtiesDesign values BCP circuit2Closed circuits one for pure Nb ; one for non pure Nb 1* 9 cell cavities dressed and undressed EP bench1Closed loop1*9 cell undressed HPR2No 1 Membrane pump No 2 Turbine driven ISO 4 / P= bar V= 1m3 / hour ISO 4 / P= bar V= 6m3 / hour Tuning lab1Tuning machine, surface inspection by Kyoto camera 3D mechanical inspection Detailed surface inspection Small chem. lab1Standard equipmentPreparation of samples and limited QC instrumentation Clean room part ISO 41ISO 4 3 Oil free pumping slow pumping slow venting equipment ISO 4 20 m2 to 51 m2 Clean room part ISO 51Standard ISO 5ISO 5 81 m2 to 62 m2 Clean room part ISO 61Standard ISO 6Upgraded from ISO 7 to ISO 6 Clean room part ISO 6 chemistry 1Standard ISO 6 +local ISO 4Upgraded to ISO 6 / US cleaning / UPW rinsing upgrade ISO 4 Overview on Infrastructure cont.

Delete this text and put in here: The title of your talk 5 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 Before Outside view of the cleanroom Infrastructure and up date/ grade Re construction of cleanroom

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Re construction of cleanroom 6 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 In between

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Re construction of cleanroom 7 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 After re construction

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Re construction of cleanroom 8 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 Clean room inside before

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Re construction of cleanroom 9 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 Cleanroom inside during

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Re construction of cleanroom 10 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 And after re construction

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Installation of a new 120 C baking oven 11 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 outside view Before After

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Installation of a new 120 C baking oven 12 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG C baking oven inside view (location ISO 4)

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Test of HPR 2 turbine with 20 nozzles 13 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 Standard 8 nozzles 0. 4 mm ID~ 0,7 m3/hour Test 20 nozzles 0,4 mm ID ~ 2 m3/hour

Delete this text and put in here: The title of your talk Infrastructure and up date/ grade Test of HPR 2 turbine with 20 nozzles 14 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 Pressure vs. time 20 Nozzles test run of 5.5 hours Pressure vs. time 8 Nozzles Standard treatment

Delete this text and put in here: The title of your talk Activities schedule 15 TTTC Meeting 2011 Milano to Axel Matheisen DESY Hamburg WG-2 ItemActivity Injector moduleQualify and collect cavities Assembly of cavity string 3,9 GHz moduleTest of new infrastructure for 3,9 module assembly Assembly of 3.9 GHz string BPM Quad unitsAssembly of BPM Quad units XFEL CavitiesTraining and qualification of companies Retreatment and upgrade of cavities Clean roomOccupation of clean room Module and Cavity preparation for XFEL