C.MADEC - TTC meeting - 01-03-2011 1 E-XFEL cryomodule assembly : prototyping phase at Saclay.

Slides:



Advertisements
Similar presentations
O. Napoly, C. Madec CEA-Saclay, Irfu/SACM
Advertisements

E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
Cryo Capture Cavity II Progress Mike McGee April 13, 2005.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LCLS-II Cryomodules Production Plans at Fermilab
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ESS cavities interfaces
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
S. Prat SCRF meeting Fermilab April 21-25, 2008 Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ SCRF Meeting Fermi.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
O. Napoly, ILC Industrial Forum, IPAC May Status of XFEL Module Assembly at Saclay O. Napoly, CEA-Saclay, IRFU/SACM.
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
E. KAKO (KEK) 2009' Dec. 2 5 STF Meeting for S1-G Global Design Effort 1 Cavity string assembly at KEK for S1-Global Eiji Kako (KEK, Japan)
Manufacturing process, validation and factory test
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Cryomodule Assembly Facility (CAF) at Fermilab: Feasibility Overview for Project X & future SRF Cryomodules Assemblies Tug Arkan February 21, 2012.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
Third SPL Collaboration Meeting – CERN - 11 November 2009S. Chel 1 XFEL: cryomodule assembly at CEA/Saclay XFEL facility & Superconducting linac Main assembly.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Status of E-XFEL Module Assembly at Saclay
Visit to Saclay – XFEL Village
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
at STFC Daresbury laboratory
DESY Experiences on Use of Gas overlay during Assemblies
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Definition of work flow for string DESY Example on critical operation
X-FEL linear accelerator
Acceptance criteria for cleanroom infrastructure
DESY experiences on education and training of cleanroom team
S1-G Webex meeting Global Design Effort
WP 3 coordination meeting Saclay May 2008
IHEP Cryomodule Status
INSTITUTE OF HIGH ENERGY PHYSICS
Cryomodule Assembly Plan
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
XFEL cryomodule production and Reliability improvement
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
SNS PPU Cryomodule Shipping Plans
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay

C.MADEC - TTC meeting Goals Infrastructures and tools Industrial study outputs PXFEL2 & PXFEL3 E-XFEL cryomodule assembly prototyping phase at Saclay

C.MADEC - TTC meeting Goals of the prototyping phase « Factory » ready CEA staff training Infrastructure ready Tool Procedure/traveler/database ready CEA controls ready Assembly of 3 cryomodules over 1,5 years (T0=august 2010)

C.MADEC - TTC meeting E-XFEL Village at CEA 4 17 m 30 m 40 m 25 m 15 m 11 m O. Napoly, Fermilab, 17/02/2009

C.MADEC - TTC meeting Infrastructures ready Clean room operational : –assembly of SPIRAL2 cavities –PXFEL 2 string in and out : rail ok Roll out area ready (PXFEL2 assembly) Alignement area operational Cantilever area ready Coupler assembly ready Shipping area : pending

C.MADEC - TTC meeting Infrastructures ready

C.MADEC - TTC meeting Clean room tools –Cavity post: Height = 1050 mm –Alignment tool : Post constraint Adaptation –Cavity cart for coupler assembly

C.MADEC - TTC meeting Clean room tools –Coupler to cavity assembly Elevator table + rail Misalignment of coupler axis / post axis –Quad table post CEA design –Bellow assembly: Elevator table and rail

C.MADEC - TTC meeting Clean room tool Standard tools (particle counters, nitrogen gun) Customized tools : –Washing and drying (~ ISO4) machine (WM) –Washing racks 2 cavities and 1 cold coupler box, ½ string tools : posts and ancillaries, Qp box) –Lifting cart : cavity and quad handling in ISO4 –Lifting table : get in the WM –Transfer table : get out of the WM

C.MADEC - TTC meeting Vacuum components Criteria : –Particle free pumps –Slow pumping –Slow venting –Leak detection –Gas analysis Provided by DESY or CEA Tested on PXFEL2 and 3

C.MADEC - TTC meeting Tools Girder Post Cart Cantilever

C.MADEC - TTC meeting Industrial study outputs Industrial study main outputs : –Schedule –Assembly procedures –Tools drawings –Risk analysis

Diapo des assmbly procedure + schedule + risk analysis C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting PXFEL2 experience feedback Based on dismounting (roll in/out ISO4) and assembly up to the couplers (status on S7) Feedback on : –assembly procedures –Schedule (steps, no duration verification so far) –Clean room : rails ok, particle counting ok –Alignement : youth errors and air conditioning –Tuner : assembly and test set up –Coupler assembly : tools reworked, spare parts, –Importance of parts checks and parts conditionning International team : DESY and INFN support

C.MADEC - TTC meeting Experience feedback

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting Roll in the clean room test with DESY Posts

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting

C.MADEC - TTC meeting Thanks to our INFN colleagues : Test device on dismounting Validated on assembly Piezos

C.MADEC - TTC meeting st alignment : observation – youth error 2nd alignment : laser stability versus air conditionning

C.MADEC - TTC meeting

C.MADEC - TTC meeting PXFEL2 conclusions –Assembly procedures –Clean room –Alignement –Tuner set up –Coupler assembly –Importance of parts checks –Thanks to DESY and INFN colleagues

C.MADEC - TTC meeting PXFEL3 Assembly start foreseen for April 2011 Assembly from individual parts (cavity, couplers, etc) Goals: CEA staff training Tool validation Test/verification set up Procedure/traveler/database ready CEA controls ready Schedule