C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay
C.MADEC - TTC meeting Goals Infrastructures and tools Industrial study outputs PXFEL2 & PXFEL3 E-XFEL cryomodule assembly prototyping phase at Saclay
C.MADEC - TTC meeting Goals of the prototyping phase « Factory » ready CEA staff training Infrastructure ready Tool Procedure/traveler/database ready CEA controls ready Assembly of 3 cryomodules over 1,5 years (T0=august 2010)
C.MADEC - TTC meeting E-XFEL Village at CEA 4 17 m 30 m 40 m 25 m 15 m 11 m O. Napoly, Fermilab, 17/02/2009
C.MADEC - TTC meeting Infrastructures ready Clean room operational : –assembly of SPIRAL2 cavities –PXFEL 2 string in and out : rail ok Roll out area ready (PXFEL2 assembly) Alignement area operational Cantilever area ready Coupler assembly ready Shipping area : pending
C.MADEC - TTC meeting Infrastructures ready
C.MADEC - TTC meeting Clean room tools –Cavity post: Height = 1050 mm –Alignment tool : Post constraint Adaptation –Cavity cart for coupler assembly
C.MADEC - TTC meeting Clean room tools –Coupler to cavity assembly Elevator table + rail Misalignment of coupler axis / post axis –Quad table post CEA design –Bellow assembly: Elevator table and rail
C.MADEC - TTC meeting Clean room tool Standard tools (particle counters, nitrogen gun) Customized tools : –Washing and drying (~ ISO4) machine (WM) –Washing racks 2 cavities and 1 cold coupler box, ½ string tools : posts and ancillaries, Qp box) –Lifting cart : cavity and quad handling in ISO4 –Lifting table : get in the WM –Transfer table : get out of the WM
C.MADEC - TTC meeting Vacuum components Criteria : –Particle free pumps –Slow pumping –Slow venting –Leak detection –Gas analysis Provided by DESY or CEA Tested on PXFEL2 and 3
C.MADEC - TTC meeting Tools Girder Post Cart Cantilever
C.MADEC - TTC meeting Industrial study outputs Industrial study main outputs : –Schedule –Assembly procedures –Tools drawings –Risk analysis
Diapo des assmbly procedure + schedule + risk analysis C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting PXFEL2 experience feedback Based on dismounting (roll in/out ISO4) and assembly up to the couplers (status on S7) Feedback on : –assembly procedures –Schedule (steps, no duration verification so far) –Clean room : rails ok, particle counting ok –Alignement : youth errors and air conditioning –Tuner : assembly and test set up –Coupler assembly : tools reworked, spare parts, –Importance of parts checks and parts conditionning International team : DESY and INFN support
C.MADEC - TTC meeting Experience feedback
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting Roll in the clean room test with DESY Posts
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting
C.MADEC - TTC meeting Thanks to our INFN colleagues : Test device on dismounting Validated on assembly Piezos
C.MADEC - TTC meeting st alignment : observation – youth error 2nd alignment : laser stability versus air conditionning
C.MADEC - TTC meeting
C.MADEC - TTC meeting PXFEL2 conclusions –Assembly procedures –Clean room –Alignement –Tuner set up –Coupler assembly –Importance of parts checks –Thanks to DESY and INFN colleagues
C.MADEC - TTC meeting PXFEL3 Assembly start foreseen for April 2011 Assembly from individual parts (cavity, couplers, etc) Goals: CEA staff training Tool validation Test/verification set up Procedure/traveler/database ready CEA controls ready Schedule