CDP 5-11-178 Morehart 2808 Lafayette Avenue Newport Beach.

Slides:



Advertisements
Similar presentations
Dauphin Island in Crisis A Proposal for Restoration of the P&BB Fishing Pier & Interim Shoreline Stabilization Working to Restore the Public Pier & the.
Advertisements

1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
BCC PUBLIC HEARING ON BZA #VA , OCTOBER 3, 2013 APPLICANT: YURI FERRO APPELLANT: WILLIAM A DAVIS, SR. and REBECCA M. DAVIS Orange County Zoning.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Who, Why, and How was this Allowed to Happen? - By Linda Beaumont 1.
MISSOULA DESIGN REVIEW BOARD La Quinta Inn 5059 N. Reserve Street Case Planner: Ana Aronofsky Public Hearing Date: April 8, 2009 Applicant: Jeff Anderson.
Sec 2 IDS, 2010 Coastal Management. You will learn: 1.Evaluate the feasibility of coastal protection measures at Pulau Ubin.
COASTAL EROSION How can we prevent our beaches from washing away?
NBOZ Northlake Boulevard Overlay Zoning District Village of North Palm Beach Landscape Element Requirements.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Lakes District At Louisiana State University CAP 206 Project US Army Corps of Engineers New Orleans District.
Coastal Preservation Surfrider Foundation CA Chapter Conference Aug. 27, 2010.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
A 1,240 Acre Master Development Plan Proposal, West of Willcox, AZ. Cochise County Board of Supervisors August 23, 2011 Docket MDP / Z
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
POS Regional Transportation Investments Viaduct/Seawall Discussion September 15, 2004.
Shore Protection Act (O.C.G.A , et seq.) Karl BurgessApril 5, 2011 Photo of Choice.
The Coast 1. The Sea 2 Wind Waves The Sea 3 TidesCurrents 1.Long-Shore 2.Cross-Shore.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
CDP Appeal Nos. A-6-ENC & 041 Leonard Okun 820 & 828 Neptune Avenue, Encinitas Demolish one single family home and construct two single family homes.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
California Coastal Commission Permitting For Emergency Response to the 2010 El Nino Storm Event Department of Public Works July 2011.
DECEMBER 12, 2012 NEWPORT BEACH COUNTRY CLUB Application No.: Item: W 11a.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Appeal to the Decision of the Environmental Protection Commission Mark Kassar November 11, 2008 Environmental Protection Division Environmental Protection.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
I TEM T H 12 A – A-6-CII Tierra Del Oro Carlsbad San Diego County C ALIFORNIA C OASTAL C OMMISSION S AN D IEGO C OAST D ISTRICT S LIDE 1.
California Coastal Commission Appeal A-1-MEN (Wernette) De Novo Hearing.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Encore Trust California Coastal Commission Hearing June 12, Encore Trust Residence.
SOLANA BEACH LUPA Comments from Solana Beach Coastal Property Owners.
MLPA Closures 2. “Children’s Pool Beach is not the only beach located in La Jolla. There are several beaches located adjacent to or in close proximity.
Kitsap County SMP Work Group August 2, Shoreline Armoring - Outline Welcome – Introductions Background reading materials Existing Permit Process.
Norberg Property 86 South La Senda – Back Yard Improvements Norberg top of bluff Staff top of bluff Vine covered fence Photograph from Mark Johnsson Memorandum.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
Bolsa Chica Land Trust California Coastal Commission June 13, 2012 W11b Parkside CDP DENY.
APPEAL OF MCGUIRE RESIDENCES Tuesday, January28, 2014 City Council.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
Item W16a February 8, 2012 CCC Hearing A-6-OCN (Altman) 1823 South Pacific Street City of Oceanside.
US Army Corps of Engineers BUILDING STRONG ® Intracoastal Waterway Setback Guidance Shelley Trulock Project Manager, Programs & Project Management Division.
Agenda Item F 16a Moriarty Dock Replacement 2782 Bayshore Drive, Newport Beach.
CDP (Foxdale) Thursday, April 14, 2016 Item 12b Presentation in support of Applicant’s request to modify Special Condition No. 1.
Applicant: Robert Ganem Addresses: 7304 & 7312 Black Oak Lane Planning Commission Meeting – August 21, 2015.
DILLON MARINA PROJECT UPDATE REPORT April 5, 2011 Marina Renovation Master Plan IMPLEMENTATION AND PROGRESS PRESENTATION.
25360 Malibu Road. MALIBU LCP REQUIREMENTS FOR A FINDING Malibu LCP Local Implementation Plan Chapter 9 Page REQUIRED FINDINGS AND ANALYSIS Written.
Harbor Resources Manager’s Report February 10, 2010.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Washoe County Board of Adjustment
Jefferson County SA Red Rocks Site Approval
Washoe County Board of Adjustment
Hurst New Blufftop Home Appeal Substantial Issue
California Coastal Commission Appeal No. A-4-MAL
Continuing Authorities Program
Meardon New Blufftop Home Appeal Substantial Issue
Title 19: Subdivision Code
Nourishment, Groins, Seawalls, Breakwaters, Jetties.
Tam O’Shanter Rezoning
Amended and Restated Interlocal Agreement for Entiat Marina
Moratorium Session 7 Oceanfront Development Proposals: December 3rd Folly Beach Planning Commission Reminder that this presentation, as well as past.
2.2.1c Shorelines Explain the effects of human activity on shorelines, especially in development and artificial stabilization efforts.
Ohio Department of Natural Resources Office of Coastal Management
115-Unit Mixed-Use Project (711 E
Presentation transcript:

CDP Morehart 2808 Lafayette Avenue Newport Beach

Applicants property Rhine Channel Aerial Photograph from City post-dredging report, Feburary 23, 2012

Property on West Bank, Rhine Channel New bulkhead CDP Cannery Restaurant Cannery Village CDP Property Line Lancaster’s Addition Applicant’s Property

Enlargement of Exhibit J Applicant’s Property, with boundaries in red US Bulkehad Line US Pierhead Line

Approximation of bulkhead location

Building approved in CDP No. P (Ziemer) showing building and wharf which failed in 2000 to right and remaining and existing buildings to the left Wharf building from north side 2000 Failure Shear Line Parking deck on wharf Remain ing buildin gs

The wharf structure gave support to the remaining buildings. The wharf and upper deck sheared from the Entire frontage of The existing building in two locations, at the first and second level. There was also a partial connection at the third level.

Swamp & Overflowed Lands Location 3089

Blow up of 1890 Swamp and Overflow Land Survey Lot 6, Sec. 28 Lot 2, Sec. 33

State Lands Identification of Location of Applicant’s Property

Location of the Applicant’s Property in relation to the boundary between Section 28 and Section 33 Section 28 Section 33 Sec 28/33 boundary Applicant’s property Exhibit F

SUMMARY The west bank of the Rhine Channel Has 1,282 feet of frontage. There are bulkheads on 1,222 feet of that frontage. There are agreed boundaries or constructed bulkheads at the property lines on 751 feet or 59% of the frontage. There are bulkheads on 471 feet of the remaining frontage that are not at the property lines but vary in distance from the property lines by 10 to 33 feet. Only the Applicant’s 60 feet does not Have a bulkhead.

Chapter 74, Stats – Grant of Tidelands to City of Newport Beach For the establishment, improvement and conduct of a public harbor: and For the construction, maintenance, and operation thereon of wharves, docks, piers, slips, quays, ways, and street, and other utilities, structures, and appliacances necessary or convenient for the promotion or accommodation of commerce and navigation.

Early 1920’s plan for the improvement of navigation channels in Newport Bay. No Rhine Channel dredging is proposed. Lancaster’s Addition, No Rhine Channel End of dredged channel Exhibit P

1936 Federal Harbor Lines The Rhine Lancaster’s Addition The boundary of the Rhine is uniformly 100 feet from Lafayette Avenue

Harbor Lines continue to show Lancaster’s Addition as having all property uniformly 100 feet deep from Lafayette Avenue to the Rhine Channel. Rhine Channel Lancaster’s Addition Applicant’s property Army Corps of Engineers, Harbor Lines, 1950

Rhine Channel identified as “Waterways Dedicated or Reserved” and distinct from “Tidelands/Submerged Lands. Applicant’s Property, all above ordinary high water mark Lancaster’s Addition

Public Resources Code Revetments, breakwaters, groins, harbor channels, seawalls, cliff retaining walls, and other such construction that alters natural shoreline processes shall be permitted when required to serve coastal-dependent uses or to protect existing structures or public beaches in danger from erosion, and when designed to eliminate or mitigate adverse impacts on local shoreline sand supply. Existing marine structures causing water stagnation contributing to pollution problems and fish kills should be phased out or upgraded where feasible.

Public Resources Code 30253(b) b) Assure stability and structural integrity, and neither create no contribute significantly to erosion, geologic instability, or destruction of the site or surrounding area or in any way require the construction of protective devices that substantially alter natural landforms along bluffs and cliffs.

Staff Report p. 23 Staff Report p. 20 (b) Assure stability and structural integrity, and neither create nor contribute significantly to erosion, geologic instability, or destruction of the site or surrounding area or in any way require the construction of protective devices that substantially alter natural landforms along bluffs and cliffs. Section (b) including omitted language

The Applicant asks that the Commission amend the motion to approve to remove Special Condition Nos. 2, 3, 4, 5, and 9.