Working Group 7 Pulsed Linac and Injection Summary D. Johnson, S. Nagaitsev, D. Raparia for Working Group 7 participants September 9, 2010.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

ISIS Accelerator Division
Design Considerations LHC hadron beams: E p =7 TeV E A =E e  Z/A Luminosity O (10 33 ) cm -2 s -1 with Beam Power 100 MW (wall plug) Integrated e ± p.
Alexandr Drozhdin March 16, 2005 MI-10 Injection.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Details of space charge calculations for J-PARC rings.
F Project X: 8 GeV Recycler Injection S. Nagaitsev, D. Johnson, J. Lackey Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Project X: 8 GeV Transfer and Injection Injection Painting Kick-off meeting Dave Johnson APC/HINS June 27, 2008 Beams-doc 3129.
Managed by UT-Battelle for the Department of Energy HB 2008 Future Prospects for Laser Stripping Injection in High Intensity Machines V. Danilov SNS, Oak.
Progress at BNL Vitaly Yakimenko. Polarized Positrons Source (PPS for ILC) Conventional Non- Polarized Positrons: In our proposal polarized  -ray beam.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
HINS Linac Simulations : Benchmarking, Jitter and Stripping. Jean-Paul Carneiro FNAL Accelerator Physics Center Accelerator Physics and Technology Workshop.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
Recycler Injection with Carbon Foils Dave Johnson, Alexandr Drozhdin, Leonid Vorobiev September 8, 2010 Project X Collaboration Meeting.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Conveners: L.Serafini,F. Villa
Notkestrasse 85, Hamburg, Germany
Superbeams with SPL at CERN
MIT Compact X-ray Source
Capture and Transmission of polarized positrons from a Compton Scheme
FFAG Accelerator Proton Driver for Neutrino Factory
Physics Design on Injector I
ERL Director’s Review Main Linac
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Multi-Ion Injector Linac Design – Progress Summary
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Working Group 7 Pulsed Linac and Injection Summary D. Johnson, S. Nagaitsev, D. Raparia for Working Group 7 participants September 9, 2010

Goals: – Develop a self-consistent concept for H- injection into the first circular accelerator – Preliminary identification of performance upgrade paths Presentations: – 3 to 8 GeV Pulsed Linac design and Options – Foil Issues – Recycler Injection with Carbon Foils – Laser Stripping Options Joint Meeting w/ WG6, – Intrabeam stripping Discussion

3-8 GeV Pulsed Linac Options S. Nagaitsev Assumptions – Front end: 3 GeV CW linac, H-, 1 mA – Inject into MI or Recycler for Neutrino Program – Upgradable for future NFMC Leverage on existing ILC and XFEL cryomodule and rf power system designs – 1.3 GHz, ≤ 2 ms at ≤ 10 Hz – multiple cavities per Klystron Other possible options 1.Single long pulse (26 ms at 2 Hz) – laser stripping in MI or Recycler Requires cw rf system  expensive Potential savings by reducing energy to 6 GeV -> directly into MI 2.~5 ms pulses at 10 Hz (like RCS) – foil stripping and accumulation in Recycler No 5-ms Klystrons…

Foil Issues D. Raparia Presented analytical description for determining foil hits Discussed impact of various phase painting schemes Discussed foil, heating, scattering, lattice design, Maximum Number of Foil Traversal (Low Intensity) To Minimize the emittance for higher Luminosity, No painting Example: Polarized proton program at BNL Average Number of Foil Traversal (Moderate Intensity) To get desire (uniform) charge density in real space Example: Project –X, J-Park Minimum number of Foil Traversal (High Intensity) To extend the foil lifetime and lower the radiation Example: SNS, μ-Factory, PS2 Absolute minimum number of foil traversal can be determine without going through lengthy simulation For 2 mA-2ms x 6 injections  Foil life time, radiation will not be an issue  Foil Linac Beam

Recycler Foil Injection D. Johnson Presented current Recycler (MI) injection concept with symmetrical straight section (motivated by SNS and JPARC experiences) Presented beam current / injection cycle options from – Proton Driver 27 mA 1 ms where injected beam dominated foil temperature issues to – Proj X currents of 1-4 mA and 4 to 1 ms currents where circulating beam dominate foil temperature and loss issues – CW linac option with 1 mA and 27 ms where circulating beam define foil temperature and radiation options Discussed foil material and orientation issues -> build upon experience from SNS and JPARC

Linac Current/Inj. Time Scenarios ParameterPD IPD IIPX 0I*IIIIIIV (CW) Avg. Linac current [mA] Inj. Time [ms] No. turns/inj No. of injections Total inj. turns bunch int.7.8E082.6E081.2E08 5.8E072.9E07 Intensity/turn1.7E125.6E112.5E11 1.3E116.6E10 Intensity/inj1.6E14 2.4E13 1.5E14 Parasitic hits / / /60 2 Foil temp at hottest point * 2D foil hit distribution plots 1 top number injected beam bottom number added in circulating beam for 1mm inj. beam sigma 2 number of hits for corner foil/estimate for 8mm strip foil 3 using a 6 mm horizontal strip foil 4 Maximum temperature and equilibrium temp at hottest point

Laser Stripping Options D. Johnson A lot of activity in the community on both theoretical and technological front – PRST-AB 13, (2010) “Laser-assisted H- charge exchange injection in magnetic fields”, T. Gorlov, V. Danilov, A. Shishlo – PRST-AB 13, (210) “Effective calculation of laser stripping via a broad shape resonance”, T. Gorlov, V. Danilov – Beam Recycling Optical Resonator Development as SNS – Optical Resonant Cavity development at LBNL How to get required photon energy density with the required time structure and duty factor… MW peak intensities, 102 W average power, 10’s ps pulse length, ms pulse durations, and duty factors for ½ Hz to 60 Hz? Options – Direct production of required light – High Q Optical Resonator – Hybrid Solution

Laser Power Estimates for 8 GeV laser Assisted Stripping Wavelength [nm] ellipticalcircularStrong Field Incidence angle [deg] Peak Power, P0 [MW] Micropulse energy [mJ] Power at 325 Mhz [kW] Micropulse duration (rms) [ps] X-rms size [mm] Y-rms size [mm] X’-divergence [mr] Y’-divergence [mr] *Timofey Gorlov (SNS) Required Laser Parameters for 98% stripping Efficiency

Laser Amplifier Advancement “High sustained average power CW and ultrafast Yb:YAG near-diffraction-limited cryogenic solid-state laser” David C. Brown*, et.al. Snake Creek Lasers, LLC, Hallstead, PA, – Produced kW CW output beam power at 1029 nm. – 50 Mhz seed laser with nJ pulse energy amplified to 15.2  J with a FWHM pulse width of 12.4 ps and a peak power of 1.23 MW. Unique crystal assembly in a distributed arrangement to minimize heating in any crystal and minimize any thermal re-population. Cryo amplifier essentially runs DC

Some Numbers Restrict ourselves to 1  m laser wave length, compare results of cryogenic amplification of the mode-locked seed laser with our requirements. The published results are a first demonstration of an ultra-fast amplifier SCLNo fieldXStrong fieldX Freq [Mhz] Pulse energy [uJ] Pulse width(rms) [ps] Pulse width(FWHM) [ps] Average power [kW] Peak power

Conclusions There is a desire for injection directly into the Main Injector – Requires small injection time on the order of 10’s of ms to keep MI dwell time short -> CW low linac current or fast linac cycle 60 hz – There is currently not the technology for strip injection of CW beams – Need continued R&D effort in laser stripping or alternative foil designs If we were to forced to decide on a pulsed linac configuration TODAY Pulsed (3-8 GeV) linac is operated with 2-4 mA, ~ 1-2 ms, 10 Hz for 1.3 GHz there is a 5-MW Klystron TH2104C (2 ms, 10 Hz) 2-4 CM’s per Klystron (150 – 300 kW per cavity) At 25 MV/m, 2-4 mA need kW per cavity for beam Do not need fast shifters From Proton Driver studies  For injection from a pulsed linac injection prefers higher beam current and lower injection time

Conclusions IF we delay decision on 3 to 8 (6) GeV linac design – Set up R&D into power sources for CW linac – Continue R&D into laser stripping as an enabling technology – CW would enable direct injection into MI (bypassing fixed energy RR) – Both CW and laser stripping link directly into upgrades for future Neutrino Factory/Muon Collider Laser Stripping will work for either Pulsed or CW linac – Continue collaboration with SNS, LBNL, Salt Creek for further laser amplifier and optical cavity development