Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab.

Slides:



Advertisements
Similar presentations
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Advertisements

New PS one-turn delay feedbacks and further developments
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Linac 4 LL RF Hardware Architecture and Design Status
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
The AWAKE Project at CERN and its Connections to CTF3 Edda Gschwendtner, CERN.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Feedback and Beam Control Section (FB) Activities and Highlights 2014 Outlook Wolfgang Hofle FB Section at 2014 RF Group Meeting - December
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T.
LLRF FOR THE SPS 800 MHZ CAVITIES G. Hagmann, P. Baudrenghien 12/12/2013LIU meeting 1.
LLRF FOR CRAB CAVITIES A FEW SELECTED ISSUES AND RELEVANT EXPERIENCE FROM THE LHC MAIN CAVITIES (ACS) P. Baudrenghien CERN BE-RF 2 nd HiLumi LHC/LARP Frascati,
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
LLRF FOR THE SPS 800 MHZ CAVITIES P. Baudrenghien, G. Hagmann 4/4/2012LIU meeting 1.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
AB-RF-FB LLRF Developments at CERN Historic Overview, Highlights, Future Challenges Flemming Pedersen.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
New PS one-turn delay feedbacks and further developments Thanks to Alfred Blas, Heiko Damerau, Guido Sterbini, Simone Gilardoni, Letizia Ventura, Valentin.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
PSB Finemet upgrade: overview, preliminary results & planning LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada (RF/FB, RF/CS)
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
LHC RF re- commissioning for run 2 with planned operation at 6.5 TeV/c and 0.55 A DC current P. Baudrenghien BE-RF with contributions from J.E. Muller,
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Working Group 1 Synchrotrons/LHC Summary Report Mike Brennan Philippe Baudrenghien Four Talks, and much discussion (LHC)
BCC-35 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), S. Rey, D. Stellfeld, D. Valuch, P.Baudrenghien.
RF/BR section 2014 highlights. RF/BR section in 2014 ARGYROPOULOS Theodoros BOHL Thomas BORGMANN Silke CALAGA Buchi Rama Rao CASPERS Friedhelm CHAPOCHNIKOVA.
Coupled bunch instabilities in the CERN PS
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
Experience with the commissioning and operation of the new CERN Digital LLRF family M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J. Sanchez Quesada,
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Status of the RF System 09/03/2016 AWAKE RF Status2 D. Barrientos, T. Bohl, A. Butterworth, H. Damerau, W. Höfle, T. Levens, J. Molendijk, S. Rey, U.
DLLRF: existing & possible applications M. E. Angoletta, M. Jaussi, J. Molendijk, J. Sanchez-Quesada CERN, BE/RF Finemet ® Review, September 2015.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Digital Receiver and Modulator Architecture for Multi-harmonic RF Finemet Operation 03/11/2015 LLRF15: Digital Receiver and Modulator Architecture for.
Phase Drift Compensation with sub-picosecond Precision over an Optical Link of 3 km for the AWAKE Experiment 06/11/2015 LLRF15, Phase Drift Compensation.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
BE-RF-FB THE LINAC4 LOW LEVEL RF 02/11/2015 LLRF15, THE LINAC4 LOW LEVEL RF2 P. Baudrenghien, J. Galindo, G. Hagmann, J. Noirjean, D. Stellfeld, D.Valuch.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
RF acceleration and transverse damper systems
Controls & software Andy Butterworth.
Philippe Baudrenghien, Grégoire Hagmann, BE-RF,
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Longitudinal beam parameters and stability
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J
Superbeams with SPL at CERN
LHC (SSC) Byung Yunn CASA.
Beam dynamics requirements after LS2
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Presentation transcript:

Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk

Overview CERN LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk Advanced Proton Driven Plasma Wakefield Acceleration Experiment LHC 2015: 6.5 TeV reached, half nominal Luminosity; upgrades for HighLumi: crab cavities  challenging LLRF SPS: major LLRF and RF upgrades under way: 4  6 MHz, 800 MHz system upgrade Roll-out of DLLRF: PSB, LEIR, AD, ELENA; new Finemet system for PSB PS: Coupled Bunch feedback with Finemet cavities HIE-Isolde, 100 MHz SRF with DLLRF LINAC4: staged commissioning: Connection to PSB: 2018/2019

Last two years: Restart after Long Shutdown 1 (LS1) LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk Physics Beam commissioning Shutdown Powering tests FMAMJJASONDJFJFMAMJJASOND MA beam to beam available for works LHC Run 2: 2015 (6.5 TeV), 2016, 2017, flat out Preparing for Long shutdown 2 (LS2) LHC Injector Upgrades: LLRF for SPS, new RF system for PSB (Finemet), LINAC4 connection, crab cavity tests in SPS

LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk LHC LLRF: controlled noise injection  Studies on the use of colored noise and RF modulation to shape the longitudinal bunch profile (needed for stability and longitudinal blow-up)  LHC RF phase noise generation, phase loop, and bunch length feedback implemented in new numerical code “BLonD” to include the LLRF  Implementation of LLRF control and blow-up in software H. Timko, E. Shaposhnikova, P. Baudrenghien Initial Final Talk by A. Butterworth on CERN LLRF Software Architecture

LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk Linac4 LLRF J. Noirjean, J. Galindo, D. Stellfeld, G. Hagmann, P. Baudrenghien, M. Ojeda May 2014 Cavity Filling Ramp (50  s) Feedback On Zoom  Installed on RFQ, Bunching cavities 2-3, DTL1  Observed ripple: 0.06% voltage, 0.05 deg, without beam  Transient beam loading: 1% voltage with 8 mA beam  Pulse to pulse reproducibility: deg LHC LLRF type VME platform See Talk by J. Galindo

LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk 6 New PSB Digital LLRF system Four operational Digital LLRF systems (Ring 1 to 4) + development ring (ring 0) which operates Ring 4 beams in PPM with Ring 4 DLLRF. Big RF group investment (manpower) for Meyrin machines. PSB operational LLRF after LS1 Mandatory for PSB Finemet R&D campaign ( ). Will be deployed in LEIR in 2015 and in ELENA (Anti-proton deceleration) in The hardware The results Talks by M.E. Angoletta and J. Molendijk

LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk CERN-MedAustron collaboration (HLRF + LLRF) Successfully delivered & contributed to commission Digital LLRF (PSB-style) + HLRF (Finemet-based ) systems for MA synchrotron. MA milestones so far: LLRF team to keep supporting MA Ring RF system when possible.  26 May ‘14: first capture  20 Oct ‘14: first extraction to MeV  6 Nov ‘14: 10E8 protons extracted to MeV MedAustron synchrotron Irradiation Room 3 (IR3) MedAustron complex M. E. Angoletta, M. Jaussi, J. Molendijk, M. Paoluzzi, J. Simonin, J. Sanchez Quesada

HIE-Isolde DLLRF LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk Front end computer 6x LLRF controller LHC type VME Platform radioative ions post acceleration (low intensity) only 16 meters long, final stage: 32 superconducting cavities (100 MHz) challenge to control the cavity, only few Hz bandwidth LLRF entirely digital, direct RF sampling, direct RF generation 32 solid state RF amplifiers, 700 W each commissioning started in summer 2015 (1 RF module with 5 cavities) first Beam successfully accelerated last month D. Valuch, M. Elias, M. Mician Poster (M. Mician) and Talk (D. Valuch)

PS Coupled Bunch Feedback LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk -3 dB 66 Splitter + amp. Coupled- bunch feedback Comb. + att. Beam- loading reduction Wall current monitor f clk = 256 f rev  Single LLRF driving all six cells Cavity return sum  Two feedbacks: 1. Beam  Finemet cavity, 2. Cavity return  cavity  no detrimental effect on beam stability observed so far See Talk by H. Damerau

LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk  One-Turn delay feedback added on TWC800MHz Cavity 1 for compensation of transient beam loading LIU SPS: LLRF for 800 MHz TWC (1) G. Hagmann, P. Baudrenghien, D. Valuch, S.J. Calvo  Cavity Vector sum (37 cells)

LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk LIU SPS: LLRF for 800 MHz TWC (2) G. Hagmann, P. Baudrenghien, T. Bohl, M. Ojeda, A. Rey, F. Killing, J. Noirjean  Amplitude and phase of measured cavity voltage (800MHz)  Very effective compensation of the transient beam loading  To be deployed on 200 MHz RF system as well  RF (800MHz) demod to IF (25MHz)  ADC’s & Digital IQ (BW=12MHz)  FPGA:100MSPS signal processing  DAC’s & SSB Modulator to RF  ≤3.2Gbits/s links (SFP) Nov. 26 th, 2014 Feedback Gain=1 Feedback Gain=25 See Talks by G. Hagmann and C. Rivetta

LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk SPS – Damper (transverse feedback) 12 G. Kotzian, T. Levens, D. Valuch A. Rey, Y. Le Borgne 4x new Board 120 MHz clocked complete new LLRF commisioned in 2014

Data recording: Observation Box LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk Linux kernel Driver Stack Transmitter SPEC Fiber Transmitter SPEC Transmitter SPEC TransmitterSPEC PCIe (DMA) FESA 3 RDA 3CMW ObsBox class Java RDA 3 OP application Ethernet Computer in TN LHC / SPS /.. Observation Box GPGPU RAM syscalls & sysfs CUDA/OpenCL VME modules with integrated Transmitters 4 x 1 / 2.5 Gb/s Objective: Overcome limitation of VME for data transfer to fully explore diagnostic potential of the digital LLRF systems SuperMicro’s SuperServer 6028U-TR4+ Simple PCIe FMC carrier (SPEC) RF specific firm ware: T. Levens A. Butterworth, M. Ojeda et al. ICALEPCS’15, WEPGF062

LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk LHC future upgrades: Crab Cavities  Transverse emittance growth caused by CC RF noise can reduce the integrated luminosity much  The dominant noise comes from the LLRF demodulator that must be improved: target= kHz offset.  Conceptual design of feedbacks is advancing  Test with a prototype cavity foreseen in the SPS in coming years For all betatron bands, the demodulator noise dominates the TX noise (filtered by cavity). 100 kHz regulation band T. Mastoridis, P. Baudrenghien

AWAKE Experimental Program LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk  Proton driven Plasma Wakefield experiment at CERN  Phase 1: Understand the physics of self modulation instability processes in plasma.  Phase 2: Probe the accelerating wakefields with externally injected electrons. 15 Laser dump e-e- SPS protons 10m SMI Acceleration Proton beam dump RF gun Laser p Proton diagnostics BTV,OTR, CTR e - spectrometer Plasma cell  Rb vapour source Proton beam  drives the plasma wakefield + undergoes self-modulation instability.  LHC-type proton beam, 400 GeV/c, 3E11 protons/bunch,  = 400 ps long Laser beam:  ionizes the plasma + seeds the self-modulation instability of the proton beam.  4.5 TW laser, 100 fs Diagnostics  BTVs, OTR, CTR Electron source and beam  Witness beam to ‘surf’ on the wakefield and get accelerated  16 MeV/c, 1.2 E9 electrons/ bunch,  = 4ps long Electron spectrometer system LLRF: Synchronisation of LASER with proton beam in SPS and electron beam Fast timing See Talk by J. Molendijk (fiber link drift compensation)

Summary  CERN Focus is on Injector Upgrades during the coming years: many LLRF challenges  New Projects: AWAKE, HIE-Isolde, ELENA  Make or buy ?  make  Platform ?  VME  Solution for data recording (ObsBox) LLRF'15 Shanghai, China - W.Hofle CERN Lab Talk