S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID 423630-2-52-01 Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.

Slides:



Advertisements
Similar presentations
Project State Road 434 Outfall Ditch to the Little Wekiva River
Advertisements

Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
Insert project map NOTICE OF PUBLIC INFORMATION MEETING Florida Department of Transportation Project History The Florida Department of Transportation (FDOT),
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Service Provider Title VI Training Civil Rights Act of 1964 Presented By: Tennessee Department of Intellectual and Developmental Disabilities.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Thursday, August 9, p.m. Jennings County High School.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
From Island Estates Parkway to St. Johns County Line.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
PALM COAST COMMERCIAL & INDUSTRIAL CENTER – PHASE Application No. SP-MAJ
Free Summer Meals for Kids in (name of the city or organization) Open to anyone age 18 and under Food That’s In When School Is Out.
Name Title Location, Kansas Helping People Help the Land.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Equal Opportunity and Compliance Renisha Gibbs, SPHR Assistant Vice President for Human Resources/ Finance and Administration Chief of Staff August 17,
2011 CDBG Applicants’ Workshop Fair Housing/ Equal Opportunity and Section 3.
JUNE 19, 2012 BCC APPEAL HEARING ON BZA #SE , April 5, 2012 APPLICANT/APPELLANT: TONY RAHBANY.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
OHIO STATE UNIVERSITY EXTENSION Document Title Sub d OSUE SNAP-Ed Adult or Parent Curriculum (change per participant). SIGN UP FOR COOKING CLASSES TODAY!
PUBLIC HEARING Draft Amendments FY 2011/12 – 2015/16 Transportation Improvement Program (TIP)
CIVIL RIGHTS FOR SCHOOL NUTRITION PROGRAMS Presented to School Nutrition Managers and Employees North Carolina Department of Public Instruction Safe and.
Phase 2: 30% Design Plans September 4 th, 2012.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
2013 CDBG Recipients' Workshop Fair Housing/Equal Opportunity.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Civil Rights Overview for Conservation Districts.
You may use this slide before your presentation begins. If you choose not to use this slide, delete and start with Slide 2 in presentation.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
TJ Goodsell, Direct Certification Grant Coordinator.
Civil Rights & USDA Child Nutrition Programs 2015.
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
SEMINOLE COUNTY Financial Project IDs: & Public Meeting December 6, 2011 Presented By: Stephanie Ghezzi, PE.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
S.R. 520 (West Merritt Island Causeway) SR 520 (West Merritt Island Causeway) From West of Myrtice Avenue to S.R. 3 Courtenay Parkway FPID
WELCOME! Please sign-in at Front Desk and pick up a Project Brochure and Speaker Request Card Feel free to review project displays and discuss project.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
Begin Project End Project Welcome to the SR 530/US 192 Highway Improvement Project Informational Meeting Thursday, February 8, 2007.
Request #2 Request #1 Segment built by LCPS.
US1 AT CANAL STREET INTERSECTION DESIGN DEVELOPMENT
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
STREETS & STORMWATER DEPARTMENT
The School of Forest Resources Presents….
S.R. 30 (U.S. 98) Tyndall Parkway
PROJ. 566(17) LOR PID MAJOR WIDENING
S.R. 26 Road Rehabilitation in Clinton County
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
"The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs on the basis of race, color, national origin, sex religion, age,
Event Photo Event title (Event host’s name) Event time and date
Charter Applicant Informational Meeting: New CHARTER SCHOOL Application Submission June 5, 2019 at 9:30 AM Location: KCW Board Room, 600 SE 3rd Avenue,
Polk Transportation Planning Organization
Presentation transcript:

S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT

S.R. A1A SIDEWALK PROJECT This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Matthews, 719 South Woodland Boulevard, Deland, Florida or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner.

S.R. A1A SIDEWALK PROJECT Exhibit Review Slide Show Presentation One-on-One Questions and Answers Comment Cards

S.R. A1A SIDEWALK PROJECT

Pre-Design Phase Gathering Information Existing Right-Of-Way is Not Defined Working Closely With City of Cocoa Beach City Council Voted to Support Project

S.R. A1A SIDEWALK PROJECT Proposed 8-ft Sidewalk on the East Side of the Northbound Travel Lanes From South 16 th Street to South 1 st Street

S.R. A1A SIDEWALK PROJECT

Proposed Swales From Edge of Pavement to Front of Sidewalk No Right-Of-Way Acquisition Locate Existing Right-of-Way (Right-Of-Way Mapping) Existing Right-of-Way Will Need to be Cleared Parking Landscaping

S.R. A1A SIDEWALK PROJECT Parking Landscaping

S.R. A1A SIDEWALK PROJECT Replace Existing 8-ft Asphalt Path on the East Side of the Roadway From Orlando Avenue to Wakulla Lane

S.R. A1A SIDEWALK PROJECT

Maintain Existing Drainage Adjustment of Existing Inlets within Existing Asphalt Path No Right-Of-Way Acquisition

S.R. A1A SIDEWALK PROJECT Lane Closures will be Restricted to Night Time Hours Maximize Activity During Day Light Hours Existing Speed Limits Shall be Maintained During Construction Maintain Property Access During Construction

S.R. A1A SIDEWALK PROJECT Survey and Design Begin – Fall 2011 Public Information Workshop – Spring 2012 Final Plans – Spring 2013 Advertising for Construction – Summer 2013 Begin Construction – Fall 2013

S.R. A1A SIDEWALK PROJECT Please turn in tonight or mail in by July 27th. The mailing address is on the form.

S.R. A1A SIDEWALK PROJECT Derek Dixon FDOT, District S. Woodland Blvd Deland, Fl Office (386) Jeremy Dilmore, P.E. FDOT, District S. Woodland Blvd Deland, Fl Office (386)