The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.

Slides:



Advertisements
Similar presentations
Networking Essentials Lab 3 & 4 Review. If you have configured an event log retention setting to Do Not Overwrite Events (Clear Log Manually), what happens.
Advertisements

Section 7: Recovery Undo logging Redo logging ARIES.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
1 Deadlocks Chapter Resource 3.2. Introduction to deadlocks 3.3. The ostrich algorithm 3.4. Deadlock detection and recovery 3.5. Deadlock avoidance.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
Week:#14 Windows Recovery
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
Backup and Recovery Part 1.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Deadlocks in Distributed Systems Deadlocks in distributed systems are similar to deadlocks in single processor systems, only worse. –They are harder to.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
ATONR Database Tests – 17th Feb. Schedule and Goals & Results Florbela Viegas, CERN ADP 18/09/20151.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Software Development Software Testing. Testing Definitions There are many tests going under various names. The following is a general list to get a feel.
1 Instant Data Warehouse Utilities Extended (Again!!) 14/7/ Today I am pleased to announce the publishing of some fantastic new functionality for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
1 Deadlocks 2 Resources Examples of computer resources –printers –tape drives –tables Processes need access to resources in reasonable order Suppose.
Operating Systems 软件学院 高海昌 Operating Systems Gao Haichang, Software School, Xidian University 22 Contents  1. Introduction** 
1 Deadlocks Chapter Resource 3.2. Introduction to deadlocks 3.3. The ostrich algorithm 3.4. Deadlock detection and recovery 3.5. Deadlock avoidance.
Patching recap Install.net all by itself (can fail the first time if all put together)
06/04/2012Steve Hahn — AEM Meeting1 MINOS Status Report Rack cleanup –All racks vacuumed –All filters cleaned –Wiener power supply/chassis checked for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
P3 - prepare a computer for installation/upgrade By Ridjauhn Ryan.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Debugging of # P. Hristov 04/03/2013. Introduction Difficult problem – The behavior is “random” and depends on the “history” – The debugger doesn’t.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
RunControl status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 14/10/2015.
© 2008 Wipro Ltd - Confidential Informatica & ETL Testing Rahul Parashar.
Verification & Validation
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
INFSO-RI Enabling Grids for E-sciencE FTS failure handling Gavin McCance Service Challenge technical meeting 21 June.
Sequential Processing to Update a File Please use speaker notes for additional information!
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
“Lab. 5” – Updating Lab. 3 to use DMA Test we understand DMA by using some simple memory to memory DMA Make life more interesting, since hardware is involved,
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
S. Batsouli DAQ Trouble-shooting. DAQ Trouble-shooting -1 1.If some of the atp/ seb/ ebc machines are not initialized correctly (appear red after the.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
How to Fix Missing WMVCore.dll Error in Windows 10
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
SQL Server Failover Effects on Applications Connected to the Cluster
Test-rigs outside CERN
Loaders and Linkers.
The Troubleshooting theory
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015

Data Live time, Mar ×10 19 POT MINERvA 94.9% MINERvA*MINOS 94.3% For Mar –3 of the days had efficiencies which were clearly not correct. Therefore, Mar will be presented next week. 2

Data Mar 10 – 96.4% –Efficiencies rerun & went to 97.2% Mar % –For 2 consecutive runs, RC was unable to start a new subrun, so the restart DAQ script was run on both subruns Mar 14 – 96.8% –Again the RC froze trying to start a new subrun so the restart DAQ script had to be run Mar 16 – 95.3% –In an attempt to fix this problem with RC moving to the next subrun, 2 obsolete RC files on the DAQ machine were updated. The DAQ had to be restarted to get the new files. 3

Data Mar 19 – 71.4% –A FEB caused a chain to fail. The failed chain prevented the run from starting. The usual reset commands were run to get the chain working, including power cycling the chain. The experts went into the MINOS hall to try recover the chain. In the process of trying to recover the chain, the VME crate showed problems. The crate was power cycled a couple of times and the crate still had problem. After the experts took a short break, everything work! –This kind of failure has happened a couple of times during the ME run with a crate having this kind of problems. –The FEB which caused the original problem has not shown the problem again. Note, that because the readout is a daisy chain of 6-10 FEBs, we do not know which FEB caused the original problem. 4

AC Down Day Mar We replaced a CROC-E in Crate 0 Croc 5 to try to address the Device Header problem. We have not gotten a Device Header problem since replacing the CROC-E. Occasionally we had gotten a Device header problem on another CROC-E, but that has not happened since Mar 18. –There were 3 problem with the header length since Mar 18. All the data on those runs were recovered To try to fix the problem we are having with RC going to the next subrun, We updated mnvonlinelogger to specify the server for NTP to use. As previously stated for Mar 16 live time, we updated some of the DAQ files. As stated in the AEM report 2 weeks ago, we changed how the copying is done from the DAQ machine to the logger. But we are still having problem with RC starting the next subrun. Usually it succeeds, but sometimes it requires manual intervention to go to the next subrun. 5

Rock Muons/POT We are seeing reduced tracking efficiency from the high luminosity. 6 POT/Pulse Rock Muons/POT

Event Display 7 Nuclear Target CC Event X ViewV ViewU View

NuMI Beam Plots Mar , xx

NuMI Beam Plots Mar 23-29, xx

Protons for the Week 10 xx 0.96×10 19 POT Mar 16-22, ×10 19 POT Mar 23-29, 2015

Protons for ME Run ×10 19 POT - Sep 6, 2013 at 15:00 – Mar 29, 2015 Record week for ME Run with 1.14×10 19 POT Previous record Mar ×10 19 POT xx

All NuMI Protons 12. xx The record week for All NuMI protons