Practical Examples of RIDM Application in the NPP Operation Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department.

Slides:



Advertisements
Similar presentations
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Advertisements

Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
ISO 9001 : 2000.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
PSAEA – CNRA Conference on OEF (Köln, 29-31/05/2006) The relationship between risk analysis and event analysis – PSA based Event Analysis P. De Gelder.
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
ESEA FLEXIBILITY RENEWAL PROCESS: FREQUENTLY ASKED QUESTIONS January29, 2015.
Isograph Reliability Software RiskVu V3. Isograph Reliability Software ESSM – The first risk monitor ? Essential Systems Status Monitor Installed at Heysham.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
Nuclear Research Institute Řež plc 1 DEVELOPMENT OF RELAP5-3D MODEL FOR VVER-440 REACTOR 2010 RELAP5 International User’s Seminar West Yellowstone, Montana.
Limited Proceedings Water & Wastewater Reference Manual1.
Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009 NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND.
IAEA International Atomic Energy Agency. IAEA Outline of the presentation Learning objectives General notes on reviewing review and assessment in IRRS.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
Diablo Canyon NPP Risk-Informed In-service Inspection
Risk-informed On-Line Maintenance at Cofrentes NPP IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
1 ISTOG QUESTIONS ISTOG QUESTIONS IST Program Plan Submittals to Regulators: Prior to OM-2001, and going back to ASME Section XI, there.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Applications Methodologies and Approaches. Status in OECD Countries Workshop.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Proposed Fire Risk Meter Workshop Information IAEA Workshop.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Initiating Event Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
2-6 November 2015 Lisbon, Portugal Regional Meeting on Applications of the Code of Conduct on Safety of RR's 1 Some aspects of the Code of Conduct on the.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Practical examples of RIDM application.
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Risk Monitoring tools: Requirements of Risk Monitors, relation with the Living.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
International Topical Conferences on Nuclear Safety, IAEA, June 6-9, 2017, Vienna Workshop 2: An Introduction and Further Explanation on Design Extension.
JSC Atomenergoproekt, Moscow, RF
Technical-economical study of Czech NPPs Long Term Operation P
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Complementarity of deterministic and probabilistic approaches
Diversity analysis for advanced reactor design
Practical experience of the Russian VVER design organization in the use of PSA for verification of compliance with single and double failure criteria.
Session Name: Ageing Management
IAEA Technical Support & Capacity Building Programme M. El-Shanawany
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
THE ROLE OF PASSIVE SYSTEMS IN ENHANCING SAFETY AND PREVENTING ACCIDENTS IN ADVANCED REACTORS Moustafa Aziz Nuclear and Radiological Regulatory Authority.
Mikael Olsson Control Engineer
Presentation transcript:

Practical Examples of RIDM Application in the NPP Operation Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA Risk informed decision making on nuclear power plant safety Technical Assistance Information Exchange Instrument & State Nuclear Regulatory Committee of Ukraine 27 – 28 January 2011, Kyiv, Ukraine

2 Presentation Outline  Examples presented for NPP Dukovany or NPP Temelín  PSA projects  Types of applications performed  Support for plant licensee submittals  Recent requests for Technical Specifications changes  Conclusions

3 Nuclear Power Plants in the Czech Republic  NPP Dukovany –VVER-440/213 –four almost identical units (2 twin units), uprated to MW e –commissioned in –a lot of safety modifications of original design  NPP Temelín –VVER-1000/320 –two units, 1015 MWe each –commissioned in 2000, 2002  The Czech Regulatory Authority –State Office for Nuclear Safety (SÚJB)

4 PSA Projects  NPP Dukovany –Living PSA project  developed and maintained in Nuclear Research Institute (NRI) Řež  regularly updated to reflect the current state of the plant and knowledge  a framework for all PSA related activities at NPP Dukovany  model reviewed by IAEA IPSART mission and the Czech Regulatory Authority  NPP Temelín –PSA project  developed and maintained by the plant  Utility guidelines for PSA –work procedure PP 0317r01 “PSA” –methodology guideline Me 0457r02 “Basis for Using Safety Monitor” –methodology guideline Me 0451r02 “Data Collection for PSA”

5 Living PSA Project for NPP Dukovany  General objectives –identification of design weaknesses –development of Living PSA model –basis and platform for PSA applications –support for RIDM  The current scope –Level 1 & Level 2, all release categories –all plant operational modes  shutdown operation is included only in Level 1 –internal event & hazards (area events) –human induced external events –risk from reactor core as well as from spent fuel pool  FDF = CDF + fuel damage frequency in spent fuel pool  The current activities –completion of the scope

6 Main Modeling Features  Computer code & model database –RiskSpectrum ® PSA  Platform for PSA applications –integrated Level 1+ model  no separate PSAs for hazards or shutdown operation  conditional probabilities for LERF and other release categories –specific models for odd & even unit in one RiskSpectrum database  cross-connected models via models of shared equipment for twin unit  effects of IE on the neighbor unit taken into account –all model modifications consider the usage in PSA applications  IE frequency handling to account for point-in-time (instantaneous) risk  symmetric models to account for different locations of IE occurrence –configuration management  a lot of system alignments possible to set  easy to obtain zero maintenance state

7 Main PSA Applications for NPP Dukovany  Assessment of plant modifications –evaluation of proposed design or operational changes  evaluation of the benefit  risk impact & ranking  proposal of alternatives  verification of the impact on the safety –final modeling in the frame Living PSA after implementation –recommendations based on PSA outputs  Risk monitoring –outage planning and evaluation of operation  Event analysis –support for the Czech Regulatory Authority  Support for accident management –identification of the scenarios to be covered with EOPs & SAMGs –recommendations of EOP changes based on PSA outputs  evaluation of the benefit

8 Main PSA Applications (cont.)  Evaluation of Technical Specifications –Allowed Outage Time (AOT) adequacy –support for AOT extension  including OLM (relocation of scheduled maintenance to power operation) –support for STI extension  Equipment categorization –based on PSA importance measures –to differentiate plant components for Plant Life Management (PLIM)  Risk informed inservice inspection (RI-ISI) –pilot study on primary circuit loops of reactor coolant system (RCS)  Training of the maintenance staff –to recognize the involvement & outputs of risk monitor  coordination of the outage, OLM DG

9 Risk Monitoring  Safety Monitor™ –used in NPP Dukovany and NPP Temelín –regularly updated due to Living PSA model changes  in the case NPP Dukovany –used off-line  Outage planning –outage assessment two months in advance –changes are proposed when instantaneous risk exceeds given criteria –feedback to the plant based on actual inputs  Evaluation of operation –quarterly reports to the Czech Regulatory Authority –monthly internal reports  Support for licensee initiated changes –monitoring the risk during OLM DG

10 Risk Monitoring (cont.)  Illustrative chart of Safety Monitor™ output

11 Risk Monitoring (cont.)  Example of Safety Monitor™ output from NPP Temelín

12 Support for Plant Licensee Submittals  Technical Specification changes –the most frequent licensee initiated change –AOT extension –STI extension  especially to utilize new outage scheme  Recent utility requests for TS changes –supported by risk-informed approach for justification of change  evaluated according to principles of regulatory instructions VDMI  high level legislation for use of PSA or RIDM is still missing –AOT extension for DG out of service –STI extension for comprehensive ESFAS test with actuation devices –change of conditions for RCS pressure hydrotests  lowering of the minimum allowed RCS temperature  a specific type of TS change different from AOT or STI extension

13 AOT Extension for NPP Dukovany  Issue of AOT adequacy –initiated by the utility in 2000  additional evaluations in the following years –a broad spectrum of LCO‘s evaluated (95 cases)  full-power operation (> 55% N nom ) mainly –comparison of single AOT risk with acceptance criteria  Level 1 risk measure only  all evaluated cases for single LCO events meets US NRC criterion ICCDP < 5 x –without additional failures or multiple LCO events  no specific guideline or acceptance criteria were given by the Czech regulatory body at that time –results were used as a support for justification of some AOT extensions to facilitate corrective maintenance, e.g.:  AOT for 2/4 hydro accumulators out of service from 4 hrs to 72 hrs  AOT for both reserve power supply lines out of service from 1 hr to 4 hrs  AOT for demi water 1 MPa (secondary circuit makeup) removed

14 Outage Pattern Comparison for NPP Dukovany  New outage scheme –fully implemented after 2008  The goal of the evaluation –risk impact on overall CDF change  justification using US NRC RG criteria would be expected when the output shows a risk increase –recommendations to reduce the risk Outage Type Typical Length Current SchemeNew Outage Scheme short outage (1/5 of the core reloaded) 32 days 3 times in 4 years 20 days 6 times in 8 years 32 days once per 8 years in the middle of the 8 year period long outage (complete refueling) 63 days once per 4 years 63 days once per 8 years

15 Outage Pattern Comparison (cont.)  Main assumptions –the dependency of equipment reliability on preventive maintenance frequency is not expected  frequency of preventive maintenance of some equipment is going to be reduced to once per three years –typical outage configurations for the current and proposed state compared  Considered issues –validity of support analyses for the shorter duration of the outage  higher decay heat after core reloading –change of IE frequencies for outage duration  proportional change of time dependent IE frequencies  new analyses for IE frequencies dependent on manipulations –avoidance of risk impact overestimation due to conservatism  the equivalent conservative assumptions for the current and the proposed state applied

16 Outage Pattern Comparison (cont.)  Positive risk impact due to: –shorter duration of POS with high instantaneous risk  i.e. operation with low level of water in RCS prior refueling pool flooding –more RCS loops available for RCS normal makeup  especially in case of RCS draindown –reduced number of heavy load transports per eight year period  Negative risk impact due to: –significantly increased time between tests of ECCS check valves  The overall (net) risk impact is positive –all types of outages considered (weighted) –all POS’s considered in impact assessment  average durations of at power operation is prolonged  Recommendations from evaluation –monitor the effect of reduced frequency of preventive maintenance –monitor the risk profile during outage –change of makeup discharge lines alignment during outage  to assure their availability without need of local manual opening of MOVs

17 AOT Extension for DG - NPP Dukovany  Up to 15 days at power operation –to allow on-line (at power) maintenance (OLM) of DG  Support analyses –PSA analyses  negligible risk increase due to OLM –both single AOT risk and overall risk  additional failures during OLM were considered  AOT extension acceptable –additional deterministic evaluations  OLM DG approved by the Czech Regulatory Authority –the following conditions are required  only once per year (only 1 division of DG under OLM)  full availability of reserve power supply & passive ECCS  tests of diesel sequencer (ELS) & DGs before OLM  risk monitoring & fulfilment of quantitative risk criteria during OLM –otherwise shutdown to Mode 5  follow-up evaluation to be submitted to the Regulatory Authority

18 STI Extension for ESFAS – NPP Dukovany  Relocation of comprehensive ESFAS test with actuation devices –digital ESFAS is implemented –test relocated only to extended refueling outage once per 4 years  some small parts of actuation paths are covered only by that test –compensatory measures  to improve efficiency of the remaining tests  System analyses –assessment against ESFAS reliability & availability targets  with new test intervals for some I&C components –probabilistic criteria are fulfilled  PSA calculations –compensatory measures taken into an account –overall neutral risk impact  STI extension approved by the Czech Regulatory Authority

19 Change of Conditions for RCS Hydrotests - NPP Dukovany  Lowering of the minimum allowed RCS temperature –by 30 to 80°C depending on the reactor unit and type of the test  to avoid long cooldown following an unsuccessful hydrotests  Deterministic analyses –new p-T curves for minimum allowed RCS temperature for hydrotests  based on RPV integrity assessment  results of qualified non-destructive testing for RPV material were used –set of comparatory analyses for the current and proposed operation  PTS or cold overpressurization –due to potential inadvertent actions during hydrotests –T-H analyses and subsequent RPV integrity assessments  to find differences in ability and time to reach given limit for potential brittle fracture  LOCA during hydrotests –T-H analyses to find differences in time windows for operator‘s actions

20 Change of Conditions for RCS Hydrotests (cont.)  PSA analyses –quantification of the risk impact of the RCS temperature decrease  unavailability of ESFAS signals vs. longer time windows for operator actions following LOCA  insignificantly shorter time windows for operator actions following potential inadvertent actions resulting in cold overpressurization  HRA output was crucial in both cases –small risk increase far below a limit  even using very conservative assumptions to emphasize negative effects of the change  risk impact calculated separately for the 1 st unit and the remaining units –sensitivity analyses  to assess additional model uncertainty  to show possible level of conservatism  Approved by the Czech Regulatory Authority –the following condition is required  availability of at least two ECCS divisions

21 Conclusions  Application of PSA in the frame of RIDM –is able to compare alternatives –helps to better understand the risk associated with the particular change –considers the effect of the change in much larger context  it may reveal unexpected impact  convolution of positive and negative effects to find the net impact  The risk-informed approach for evaluation of changes appears be viable option in the Czech Republic –the scope of issues, which could be subject of risk-informed evaluation, still broadens –it also helps to reduce unnecessary burden on the plant without compromising the safety

Thank you for your attention