Mahakali. Sarada Agreement 1920 sharing of the Mahakali River India exchanged 4000 acres of land for 2898 acres of land of Nepal Maintenance, Operation,

Slides:



Advertisements
Similar presentations
WHY DO WE NEED PARLIAMENT?
Advertisements

Jeopardy Legislative Executive and Judicial Checks and Balances AmendmentsThe Preamble Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400.
Indo-Nepali Water Relations Meg Patterson International Water Law April 7, 2009.
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
Water and the Confederated Tribes of Warm Springs.
The President’s Job/Making Foreign Policy
Prime Minister of India
Hydropower Development: Experience of Nepal
Warm Up : What does JUDICIAL REVIEW mean
EU: Bilateral Agreements of Member States
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
Separation of Powers Checks and Balances
Electricity Reforms and Regulations in Nepal Navin Dahal South Asia Watch on Trade, Economics & Environment (SAWTEE)
Unit 6: Chapter 12, Section 4 Title: Texas Becomes A State Title: Texas Becomes A State Main Idea: Efforts for Texas annexation were given a boost by the.
INDUS RIVER SYSTEM AUTHORITY (IRSA) “Water Apportionment Accord 1991, Indus River System Authority”
 The executive branch of the Government is responsible for enforcing the laws of the land. 1. President 2. Vice President 3. Cabinet Members  Advises.
BOTTLENECK IN NEPALESE ECONOMY THIS SLIDE IS PREPARED BY CA IPCC AJAY ADHIKARI Hatemalo Nepali Students Group Page 1 NEVER TAKE EXCUSE ALWAYS TAKE RESPONSIBILITY.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Developing the Transboundary Waters of Afghanistan Infrastructure Working Group United States Embassy 2 March 2010 Margaret J. Vick, JSD Senior Water Rights.
Hydro Electric Power Plant
Institutional and Legal Issues in Managing shared Water Resources The Arab Region's Experience Chara Ksia League of Arab States.
Government Systems.
1. 2 Amendments Allowed by Article V The Constitution proposes two methods for proposal and two methods for ratification This makes four total methods.
THE RHONE RIVER BASIN Alex Houston February 23, 2012.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
Manuel Lago, Ljubljana,Slovenia, 12/02/20131 Economic analysis of water use: future solutions for the Hydropower sector Dr Manuel Lago “Future water use.
THE US CONSTITUTION Chapter 4 - A CLOSER LOOK. THE CONSTITUTION 1.Based on six principles: a. The rule by the people – democracy! b. Limited powers –
Pancheshwar Multipurpose Project Pancheshwar Development Authority (PDA)  In pursuant to Article 10 of Mahakali Treaty, Indo Nepal Pancheshwar Development.
The Constitution is the United States’ fundamental law The Constitution is the United States’ fundamental law It is also “the supreme Law of the Land”
Kosi Barrage: Farakka Mahakali Ganga. Kosi Barrage Originates autonomous region of Tibet Total catchment area 92,538 km 2 : Tibet 30%, Nepal 50%, India.
CONSTITUTIONAL GOVERNMENT. Constitutional Basics The Constitution is seen as the supreme law of the land It provides citizens with information about their.
Presentation Pro © 2001 by Prentice Hall, Inc. Magruder’s American Government C H A P T E R 3 The Constitution.
Constitutional Powers. Constitutional Provisions Expressed powers: the legislative powers of Congress as described in Article 1 of the Constitution Necessary.
El Gallo Hydroelectricity Project PDD Analysis
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Miss Smith 7 th Grade Civics *pgs Civics in Practice.
Essential Question How is the Constitution structured?
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
Institutions of American Government Module 4.2: The Presidency Section 5: Constitutional Provisions for Presidential Power.
Annexation Unit 6: Ch. 12, Sect. 4 Title: Texas Becomes A State Title: Texas Becomes A State Main Idea: Efforts for Texas annexation were given a boost.
Presented by: Dr. Hem Raj Subedee Program Co-ordinator Department of conflict, peace and Development studies Tribhuvan University, Kathmandu Nepal Water.
By: Maggie Curran, Cara LaMotta, and Tara McKeon.
1 UN CONVENTION ON THE LAW OF THE NON- NAVIGATIONAL USES OF INTERNATIONAL WATERCOURSES.
Three Gorges Dam China By: zach russell.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Negotiations and Agreements Between Ganges River Basin Riparians Khalid Khan Khalid Saifullah Muhammad Arif Goheer.
1. Composition of House: The Lok Sabha is the popular House. Its members are directly elected by the people. But the members of the Rajya Sabha are indirectly.
Relations Between the Executive and Bureaucracy in Turkey Konuralp Ercilasun Kwangwoon University – Seoul Maltepe University – Istanbul.
Ratifying the Constitution.  Federalists - supporters of the Constitution - supported strong national government  Argument - protection for individual.
Multi purpose river projects and Integrated water resources Management Std X CBSE As per NCERT geography textbook Contemporary India II Dam – it!
WHY IS INTEGRATED RIVER BASIN PLANNING IMPORTANT? Module 1 pp 1.1.
A Jurisprudential Model for Sustainable Water Resources Governance By Professor D. E. Fisher.
The Constitution By Mr. Hunt. Structure and Principles Article I Creates Congress Legislative Branch Describes the two Houses How to make laws.
The Supreme Law of the Land
05,April, th India Water Week 2016 April 4-8.
Nepal’s Water Resources at a Glance
The Blackfeet Water Rights Settlement Act
Separation of Powers Checks and Balances
Prime Minister of India
Separation of Powers Checks and Balances
Separation of Powers Checks and Balances
Separation of Powers Checks and Balances
ELECTION COMMISSION.
Constitution and I’ll Law
Separation of Powers Checks and Balances
Prime Minister of India
Separation of Powers Checks and Balances
Chapter 2 – Section 3.
Transboundary cooperation in the Dniester River basin
Presentation transcript:

Mahakali

Sarada Agreement 1920 sharing of the Mahakali River India exchanged 4000 acres of land for 2898 acres of land of Nepal Maintenance, Operation, Protection of Sarada Barrage At Banbasa (Uttar Pradesh) Provisions 14,000 cusecs of water to India and 1000 cusecs of water to Nepal

Tanakpur Treaty in 1991 Severe criticism within Nepal Built a weir part away across the river Mahakali flowed away from the weir took away 33 acres of Nepal land 1000 cusecs capacity head regulator at Tanakpur 150 cusecs of water to irrigate border side of both India and Nepal Between ha of land on Nepalese side irrigation India 10 MW of energy at a special cost to Nepal despite the loss of power supply from the Tanakpur Power Station

Tanakpur Power Station Major Obstacle between two countries No Cooperative engagement As Constitution was promulgated on 9 th November 1990 in Nepal, Article 126 deemed it necessary for a parliamentary ratification by two-thirds India’s controlling interest over the major rivers for economic reasons

Tanakpur Agreement remained undisclosed to the Nepali public Not produced in the Parliament in the pretext that it was only an ‘understanding’ not a treaty. Severe criticism from all quarters of Nepal. Media inform the people of the pros and cons of the Tanakpur project Koirala and his party Nepali Congress faced still opposition from the opposition. Scathing attack to the Tanakpur agreement from street to houses. Rostrum of lower house was gheraod (encircled) for eight hours by the UML on 28 February 1991.

Supreme Court decided that the Tanakpur agreement waas indeed a treaty and not just an understanding Required Parliamentary ratification To ratify the tanakpur agreement by simple or special majority was left to the Parliament. A Commission was headed by Lok Raj Baral Six point Criteria to analyse Commission concluded that Tanakpur agreement was ‘ all encompassing serious and long term nature’ and recommended to ratify with a simple majority

Nepali Congress, Rastriya Prajatantra Party, and Sadbhawana coalition government Visit of Indian PM, Foreign Minister and Water Resources Minister Clarify the uncertainities and realities of Tanakpur treaty.

Mahakali Treaty signed in February New prospects of harnessing the Himalayan Rivers for hydropower, irrigation and flood control Valid for 72 years, reviewed every 10 years Principle of equitable and reasonable use. Replaces earlier understanding on Sarada Barrage, Tanakpur Barrage and the proposed Pancheshwar Project cusecs in the wet season and 150 cusecs in the lean season. If Sarada becomes non-functioning minimum flow of 350 cusescs downstream to preserve river ecosystem

Joint operation of the head regulators and waterways. 70 million KW of energy on a continuous basis anually Free of Cost 132 KV transmission line up to Nepal-India border from Tanakpur Power Station Tanakpur Power Station 120 MW capacity, generates million KW of energy Provision for incremental energy to Nepal against payment. Prime Consideration for Nepal’s water requirements and irrigation.

Approved by 2/3 of the majority of the Parliament of Nepal. Equitable distribution of water Nepali politicians digruntled over range of real and perceived reasons