Energy savings & molding costs retrofit motor speed control 1 Energy Savings & Molding Costs Fred Pratt Business Development CCS SyncroSpeed what can retrofit.

Slides:



Advertisements
Similar presentations
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Advertisements

Energy Conservation Energy Management.
Market-Based Management
1 Irrigation Efficiency Webinar September 23, 2014 Ron Rose Energy Efficiency Consultant Nebraska Public Power District.
Jim Pauley, P.E. Vice President, Industry and Government Relations – Schneider Electric Chair, NEMA High Performance Building Council Building Star An.
Opportunities for Demand Response in California Agricultural Irrigation Gary Marks iP Solutions Corp. 10/15/2012.
ENERGY CONSUMPTION: MANZANITA HALL ENERGY UPGRADES BEN COHNDANNY GARNETT AUSTIN FROGGEPAUL SAIGEON MATT DUNCAN.
Optimizing Pump Systems for Energy Efficiency Gunnar Hovstadius,Ph.D., Director of Technology Don Casada, SR. Development Associate, Oak Ridge NL Goulds.
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
TUBA PLAST Survey Report Conducted By: Green Line Company.
Design Envelope Pumps – Value Proposition 2012 Lowest Installed Cost Lowest Life Cost.
Let’s Talk Energy Savings: The City of Norwalk partners with Conservation & Load Management (C&LM) Mayor Alex Knopp November 18, 2004.
KV Patri, Mgmt of Tech. Inn., Case Study: Electrical IMM for HK 1 Quest for New Technology by Hong Kong’s Plastic Injection Molding Machine Manufacturers.
Sital Marble (MFG.)L.L.C Survey Report Conducted By: Green Line Company.
1 Kevin Cope Imperial College London Head of Building Operations Carbon Management Plans - achievements, maintenance and the future.
1 Xcel Energy Webinar October 24, :30 am to 1:00 pm CT VFDs Drive Efficiency: Learn how Variable Frequency Drives can benefit your facility.
Total Energy Usage As A Measure of Building Performance 30% Building Energy Savings Through an Energy Lifecycle Approach to Building Construction, Retro-fitting,
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Hawke’s Bay Refrigeration
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
People who care Increasing Profit & Contributing to Global Sustainability (Reducing carbon footprint through effective compressed air management) Presented.
Directional Control Valve CV691. Present system New Proposed System with CV691 valve Directional Control Valve CV691 with integrated Flow Control Valve.
AL WADI Survey Report Conducted By: Green Line Company.
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
Name of Building(s) or Project Speaker(s) Organization(s)
Effective Energy Management. 1.Develop baseline 2.Identify and quantify savings opportunities 3.Measure and benchmark to sustain efforts.
The EnergyMizer Power Reduction & Conditioning System ®
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 AF M&V Template K. Quinn Hart, P.E Air Force Facilities Energy.
Robert Williams Chief Energy Efficiency and Climate Change Unit UNIDO Industrial System Energy Efficiency An Overview.
New Line 5000 Dryers Dryer T5290 – T5550 – T5675
Marble Company 2 Survey Report Conducted By: Green Line Company.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
MAIS PLASTIC Conducted By: Green Line Company. Power Factor Readings: Load Percentage: Predicting the Energy savings Before Installing Powerboss Formula:
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
RAYAN PLAST Survey Report Conducted By: Green Line Company.
Cutting Machine 22kW Survey Report Conducted By: Green Line Company.
Research in the Irrigation Industry The Rubicon Water University of Melbourne Relationship Tony Oakes Rubicon Water 7 September 2015.
Better together... we deliver MODELLING, CONTROL AND OPTIMISATION OF A DUAL CIRCUIT INDUCED DRAFT COOLING WATER SYSTEM February 2016 C.J. Muller Sasol;
CITY OF LEOMINSTER. Customer Charge The cost of providing customer related service such as metering, meter reading and billing. These fixed costs are.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
E6xPage 1 Finn-Power E6x The perfect Machine tool for your first FINN-POWER.
Kaeser Compressors, Inc.
SDK/TT - PRM BNN | 27/03/2014 | © Robert Bosch GmbH All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution,
Data Analytics – A Cost Effective Approach to Reducing Operating Costs Automatically “find what matters” in the data from building equipment systems and.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
Introducing Adaptive 3D Control for Sigma Air Manager™
Enhancing The Efficiency Of New And Existing Cooling Systems Dr Robert Lamb CEng FInstR Group Sales & Marketing Director Star Refrigeration Ltd.
© INTECHNICA Energy efficiency assessment Systematic Approach to Green Production Energy Efficiency Assessment Supported by: The sole responsibility.
20/11/161 NEW E5 FINN-POWER e-technology - 14 years of excellence.
Robert Greenwald, P.Eng, MBA February 26, 2004
AXUG Partner Showcase – Introducing Preactor
Portugal Cove - St. Philip’s
Aircon Mechanical Systems
Seminar On Energy Audit Submitted To: Submitted By:
The perfect Machine tool for your first FINN-POWER
Kaeser Compressors, Inc.
Economic Operation of Power Systems
Parul Institute of Technology
FINN-POWER e-technology - 14 years of excellence
ME444 ENGINEERING PIPING SYSTEM DESIGN
Oddgeir Gudmundsson, Jan Eric Thorsen and Marek Brand
Unisab III - Turns a compressor into a highly efficient engine
Title RTWD Water-Cooled Chillers subtitle START
VERTICAL MACHINES NEXEEN – V100 TO NEXEEN – V200 Note: MODEL
January 2019 TSSM Training Topic Matt Toms
Presentation transcript:

energy savings & molding costs retrofit motor speed control 1 Energy Savings & Molding Costs Fred Pratt Business Development CCS SyncroSpeed what can retrofit motor speed control achieve?

energy savings & molding costs retrofit motor speed control 2 what to expect from this session how much savings to expect the cost of retrofit installations what makes a good system perform well how to avoid poor results & failed investment

energy savings & molding costs retrofit motor speed control 3 molding costs relative and rising costs of –material –labour –energy –maintenance, depreciation, overheads energy is not the greatest spend, but costs can be managed and reduced

energy savings & molding costs retrofit motor speed control 4 savings in perspective

energy savings & molding costs retrofit motor speed control 5 energy savings in perspective energy for the molding machines is most of the utility bill source

energy savings & molding costs retrofit motor speed control 6 energy savings in perspective power consumption operating hours savings potential cost of realisation risk

energy savings & molding costs retrofit motor speed control 7 savings index motors and heaters offer the greatest potential but not the least risk

energy savings & molding costs retrofit motor speed control 8 hydraulic IMMs what’s not to like?

energy savings & molding costs retrofit motor speed control 9 moulding machine hydraulic losses Q p actual pump discharge actual discharge pressure true flow demand USEFUL POWER WASTED POWER true working pressure requirement prime cause of losses is mismatch of power supplied to true demand

energy savings & molding costs retrofit motor speed control 10 how the savings are made matching supply to demand –speed of movement –volume of oil from the pumps –regulation of required oil volumes reducing pressure losses attack the over supply of oil volumes and pressures

energy savings & molding costs retrofit motor speed control 11 performance … what to expect reduction in motor energy consumption –25% to 55% reduced load on oil cooling system –additional 5% to 15% of above machines to operate as normal still working 10 years on a developing technology that delivers measurable results

energy savings & molding costs retrofit motor speed control 12 examples of savings

energy savings & molding costs retrofit motor speed control 13 plasticising injection hold cooling 47 kW 21 kW injection estimate power reduction is 55% Sandretto 1100t machine study

energy savings & molding costs retrofit motor speed control 14 actual power reduction is 30% Husky EW1150ES ps 28s

energy savings & molding costs retrofit motor speed control 15 manufacturertonnagetotal motor power kW saving motor loading Engel kW41.1% LG550104kW33.3% Demag50055kW36.5% Meiki850110kW35.4% Van Dorn kW38.2% Krauss Maffei kW44.7% Oima40045kW51.7% Negri Bossi33030kW66.4% Mitsubishi65090kW34.0% MIR20030kW60.1% Stork44090kW52.4%

energy savings & molding costs retrofit motor speed control 16 annual savings by tonnage annual operating hours6000 energy costEuro 0.10 / kWh oil coolingtower ♦ annual savings

energy savings & molding costs retrofit motor speed control 17 annual savings by motor size annual operating hours6000 energy costEuro 0.10 / kWh oil coolingtower ♦ annual savings

energy savings & molding costs retrofit motor speed control 18 cost vs annual benefit annual operating hours6000 energy costEuro 0.10 / kWh oil coolingtower ♦ annual savings ♦ system cost

energy savings & molding costs retrofit motor speed control 19 typical system inverter to drive the motor controller to regulate the inverter signal interface with host machine user interface for information techniques & experience –installation design & specification –maximise energy savings –deal with host machine faults

energy savings & molding costs retrofit motor speed control 20 typical installation

energy savings & molding costs retrofit motor speed control 21 main screen The main screen displays essential operational information; drive (inverter) status motor speed motor power averaged energy savings

energy savings & molding costs retrofit motor speed control 22 calculate power savings The ‘re-calculate’ button forces the motor to run at full speed for three cycles, then revert to speed control. The Full Power data is retained and the SyncroSpeed data refreshed every three cycles. Users can establish benchmarks of energy performance for every job. Setters have the vital information to refine the job setup to further optimise energy saving performance.

energy savings & molding costs retrofit motor speed control 23 power consumption This screen provides useful information for the user concerning power consumption and energy costs. The ‘energy cost per kWh’ is set by the user. The consumption and cost variables are automatically updated and displayed every 3 cycles of the machine.

energy savings & molding costs retrofit motor speed control 24 candidate machine factors to consider when selecting machines

energy savings & molding costs retrofit motor speed control 25 candidate machine all variablemixedall fixed pumps /7 hours single 55kW motor size cycle 40s static time 50% screw speed = 100% screw speed < 100% job setup Euro 0.06Euro 0.10 energy, kWh nonesoft loans$$ per kW or kWh incentives thin wall ppabs, pathick sections, pvc, pc material & form

energy savings & molding costs retrofit motor speed control 26 candidate retrofit system limited configurabilityconfigured for dynamic performance inadequate overload capacitysized for massive overloads unknown performanceinternational reputation immunity to ‘nuisance trips’ vsd specification it’s ok, it’ll take just a few weeks to put in a bigger one guessworkengineered solutions focus on time & material costsfocus on codes & good practice installation standards oops, no-one told me to ground just one end of the braid

energy savings & molding costs retrofit motor speed control 27 candidate retrofit system commissioning knowledge I don’t know why it’s started to do that... does it matter? apathyproject champion interest, understanding, authority lack of control or proceduresmethods commitment how long have these energy savers been switched off? patchy process knowledgeunderstands IMMs in depth missed linksoperation, control, malfunctions

energy savings & molding costs retrofit motor speed control 28 candidate retrofit system software just like the iPhone 4S – it’s all about the software manually set for each job‘transparent’ to the user fixed speedsfull speed-range response no visual informationstatus & performance screens

energy savings & molding costs retrofit motor speed control 29 in summary vsd retrofits can deliver great savings management understanding and commitment is needed at the start supplier knowledge and experience is the route to the desired result lost savings today are lost forever

energy savings & molding costs retrofit motor speed control 30 checklist for success

energy savings & molding costs retrofit motor speed control 31 success with retrofit MSC … planning select good candidate machines management commitment reliable assessment of energy savings accurate overall project cost

energy savings & molding costs retrofit motor speed control 32 success with retrofit MSC … project installation installation work to correct standards optimal delivery of savings

energy savings & molding costs retrofit motor speed control 33 success with retrofit MSC … delivery IMM productivity OK verify the results

energy savings & molding costs retrofit motor speed control 34 centrally based in the UK retrofit MSC installations around the world CCS SyncroSpeed

energy savings & molding costs retrofit motor speed control 35 energy savings & molding costs Fred Pratt CCS SyncroSpeed, England Robert Knaster CCS SyncroSpeed, New York (914) CPT CCS SyncroSpeed, Cincinnati