UITF ODH Assessment UITF Safety Review May 10, 2016.

Slides:



Advertisements
Similar presentations
Flammable and Combustible Liquid & Compressed Gas Handling and Storage
Advertisements

Spallation Neutron SourceOak Ridge December 5-9, 2005 Impact of BL 13 NPDγ Experiment H 2 Target on SNS Safety Basis: I. Introduction II. USID III. Hazard.
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Liquids and Gasses Matter that “Flows”
Fires and Explosions.
Oxygen Deficiency Hazards ODH SAF 103 Patty Hunt.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Review of Helium Venting Analyses
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Current status Arkadiy Klebaner November 21, 2012
Patrick Thornton, SNS/FPE June 9, 2008
March 14, 2002GJG NCSX CRYOGENICS DESIGN DEVELOPMENT STATUS WBS-63.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Ventilation of the LH2 Target GHS In MPF-35: The target gas handling system (GHS), target cryostat, and part of the vent stack are covered by a tent that.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF ODH Discussion How to avoid ODH2 conditions? August 5, 2015.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
1 14 gases, pressure, Boyle’s Law & Bernoulli’s Principle RQ: 4, 13, 15, 17, 20. Exercises: 7, 56. Problems: 1, 2.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Explosion An explosion is a rapid expansion of gases resulting in a rapid moving pressure or shock wave. The expansion can be mechanical or it can be.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Turn Liquid Nitrogen tank vent towards the wall Dewar vented into Custodian’s ear as they walked into a lab To prevent injuries, turn Vent and Relief Valves.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
SCH Controls Readiness Review: Site SCH Controls Readiness Review: Site UNIQUE HAZARDS: Significant fields in adjoining magnet cells Magnetic field.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
SAFETY WITH CRYOGENIC SYSTEMS. Safety aspects 1. Physiological 2. Suitability of materials and construction 3. Explosions and flammability 4. Excessive.
ORNL is managed by UT-Battelle for the US Department of Energy Considerations for Engineering (and other) Controls for Oxygen Deficiency Safety Kelly Mahoney.
What is a Cryocar? It is a liquid nitrogen powered vehicle. Propulsion systems are cryogenic heat engines in which a cryogenic substance is used as a.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
Avogadro's Principle “Equal volumes of gases at the same temperature and pressure contain equal numbers of particles” It doesn’t matter what type of gas.
Vacuum tank relief for Super-FRS long multiplet cryostat CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Oxygen Deficiency Hazards Analysis for MAJORANA Temporary Clean Room Steve Elliott Los Alamos National Laboratory.
Carbon Dioxide System Design
UITF Laser and Gun High Voltage John Hansknecht UITF Operational Review March 18, 2016.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
UC Davis Departmental Safety Coordinator Meeting
2 K Coldbox Safety and ESH
Magnet cryogenic system update.
UITF – Upgrade Injector Test Facility
LARP Vertical Test Facility
MDS Selection.
ESS elliptical cryomodule
Helium collector CFD analysis
CTF Users’ Perspective
Upgraded Injector Test Facility
Presentation transcript:

UITF ODH Assessment UITF Safety Review May 10, 2016

UITF Layout

Sources of ODH Hazards SourceGasLocation Gun Power SupplySF6 GasCave 1 ¼ Cryomodule (400 L)Liquid HeliumCave 1 Nitrogen Supply LineNitrogen GasCave L DewarLiquid HeliumCave L DewarLiquid HeliumCave L DewarLiquid NitrogenCave 2 In Beam Cryostat (IBC)Liquid HeliumCave 2

Table of Vents Vent size No. of Vents Location Credited for mitigation 0.25 m (10”) diameter6 Cave 1 Ceiling No 0.76 m (30”) diameter, active 2.1 m 3 /s & 3.5 m 3 /s 2 Cave 1 East Wall No 0.3 m x 0.46 m (12” x 18”)3 Cave 1 Ceiling No 0.15 m diameter (6”)3 Cave 1 West Wall Used for vent stack 5.6 m 2 (60 sq. ft)1Cave 2Yes

6” Vents, West Wall 30” Vents, East Wall (active) Roof Vents Vents in Cave 1

ENTRY/EXIT The main entry/exit to UITF is through a labyrinth with chain-link fence gate, approximately 1.8m (6’) wide and 2.4m (8’) tall, which also provides an escape path for helium gas and/or a path for makeup air. The vent tubes, penetrations and chain-link fence gate allow lighter than air mixtures of ODH gases to leave the enclosure to the high bay.

High Bay –Equivalence to Outside The Test Lab high bay volume roughly m 3 (81.4m L x 40.5m W x 12.2m H) = 1.4 million cubic feet To justify the claim that the high bay volume is large enough to be considered equivalent to the outdoors, consider 1,900 L of LHe released simultaneously from the quarter cryomodule (400L) and from the HDIce target (500L buffer dewar and a 1000L fill dewar). This amount of LHe would expand to 1481m 3 (52,315 ft 3 of gas) with a resulting O2 concentration of 20.2% in the Test Lab high bay.

Vent in Cave 2 Elevated roof section over Cave 2 60 sq.ft (5.6 sq.m) vent. Roof tiles rest on the steel structure Roof tiles of elevated section removed

ODH Assessment Used two independent methods for ODH analysis with respect to Helium – Dana Arenius’s numbers for venting helium through a ceiling vent – For Cave 2, by calculating the release of helium and venting of helium using Bernoulli principle and gas laws The conclusions from the two methods agree

Relevant Data Percentage of Oxygen in ambient air = 21% Oxygen level below which ODH exists = 19.5% Ambient temperature = 300K Cave 1 Volume = 259 m 3 Cave 2 Volume = 469m 3 Cave 2 ceiling vent area = 5.6 m 2 Rate of escape of Helium = 0.25kg/s/m 2 (from Dana Arenius) Volume of Helium venting through 1 m 2 vent= m 3 /s Volume Helium venting capacity of 5.6 m 2 vent = m 3 /s

Cave 2 - Cryogen Container Data Pressure in liquid Helium dewars = 13.8 KPa Mass of liquid Helium in 1 m 3 dewar = 125 kg Transfer pipe radius of 1 m 3 dewar = m Mass of liquid Helium in 0.5 m 3 dewar = 62.5 kg Transfer pipe radius of 0.5m 3 dewar = m Expansion factor for 4K He = 750 Expansion factor liquid N 2 = 700 Pressure in liquid Nitrogen dewar = 139 KPa Mass of liquid Nitrogen in 100 L dewar = 81 kg Transfer Pipe radius of Nitrogen dewar = m

Equipment Failure in Cave 1 and Passive Vent Rates Item and Event Spill Rate kg/sec Passive Vent Rate kg/sec based on 5.6m 2 vent area Ratio (Spill Rate)/(Vent Rate) If /=1 “Issue” Rupture 4K Supply Ok Blocked 4K Return Ok Rupture Shield Supply Ok Blocked Shield Return Ok ¼ CM Insul Vac Loss Concern + ¼ CM Beam Line Vac Loss Concern + Rupture 300K Helium Supply Ok

Concerns There are two concerns to be addressed. The venting of the entire helium inventory upon the loss of beam line vacuum in the ¼ cryomodule will take place in approximately 70secs with a large discharge plum. While the passive venting can handle the volume, the direction of flow from the reliefs (close to head height) and the distance to the 5.6 m 2 vent is a concern if an actual event were to occur. To ensure clear egress and clear flow of the spill out of the cave, the primary relief, the secondary parallel plate relief and the burst disk on the new ¼ CM must be diverted to the outside of the cave.

Roof over Cave 1 ¼ Cryomodule in Cave 1 ODH Concern Mitigation – Cave 1 Diverted to high bay using the vents On west wll

Equipment Failure in Cave 2 and Passive Vent Rates Item and Event Spill Rate kg/sec Passive Vent Rate kg/sec based on 5.6m 2 vent area Ratio (Spill Rate)/(Vent Rate) If /=1 “Issue” Rupture HDice 50L IBC NA1.50NAOk Rupture transfer line 500L Buffer Dewar Ok Rupture transfer line 1000L Dewar Ok Rupture 500L Dewar 63kg1.50NAIssue* Rupture 1000L Dewar 125kg1.50NAIssue* Rupture HDice boil off return line <<1Ok Rupture 100L LN2 Dewar 81kg1.50NAOk

Things to note Instantaneous failure of 50L IBC results in a 19.9% O 2 concentration in the cave with a fatality factor of 0. Instantaneous failure of nitrogen dewar dumping entire contests results in O 2 concentration of 18.8% resulting in a fatality factor of 0.

Issues Instantaneous failure of dewar dumping entire contents results in O 2 concentration of 8.8% for 500L dewar and inerts the cave for 1000L dewar The median failure rate for a dewar is /hr with a fatality factor of 1 (EH&S manual ) The resulting Probability x Fatality = which is ODH 1. rating for a 500L or larger helium dewar However, instantaneous dumping of the entire dewar contents would occur only during the movement of such a dewar and not when the dewar is stationary

ODH Assessment Standard UITF Configuration 1.UITF will have a chain link entry gate 2.UITF will have the primary reliefs of the ¼ Cryomodule diverted outside the cave through the vents on west wall 3.The passive vent areas will be kept free and clear for the passage of helium gas

ODH0 Conditions for UITF 1.From the floor to an elevation of 9’ whether the roof is fully installed or not 2.When the elevated section of Cave 2 roof is removed for work on the HDice target

ODH1 Conditions for UITF 1.From 9’ up to the ceiling 2.When a 500L helium dewar or larger is being moved into/out of UITF 3.When the cave roof is fully installed, during u-tube operations to connect or disconnect the ¼ Cryomodule Signage will indicate the ODH0 and ODH 1 areas. UITF will have ODH monitors and alarms (PSS)