Page 1 Arnaud Cauchy, EADS Astrium 6th of November 2013 ESA HMA AWG HMA-S WP6100 WPS2.0 Specification Session 4: State of the art technology and standards,

Slides:



Advertisements
Similar presentations
Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
® Making Location Count Copyright © 20101Open Geospatial Consortium Surface Water IE Update HDWG Delft Workshop April 2011 Co-sponsored by Sponsored and.
® Sponsored by OGC/WMO Hydrology Domain Working Group 95th OGC Technical Committee Boulder, Colorado USA David Arctur 13:00-14:45 Wednesday 3 June 2015.
® SOS 2.0 Profile For Hydrology 91 st OGC Technical Committee Geneva, Switzerland Simon Jirka (52°North) 11 June 2014 Copyright © 2014 Open Geospatial.
CANDU Owners Group Inc. “Strength Through Co-operation” 1 Presentation to CNC-IAPWS May 23, 2003 AN OVERVIEW OF CANDU OWNERS GROUP R&D PROGRAM for CNC-IAPWS.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
NCSR “Demokritos” Institute of Informatics & Telecommunications CROSSMARC CROSS-lingual Multi Agent Retail Comparison Costas Spyropoulos & Vangelis Karkaletsis.
INTERNATIONAL INSTITUTE FOR GEO-INFORMATION SCIENCE AND EARTH OBSERVATION Introduction to the OGC Web Processing Service (WPS) GIP – Meeting 20 April 2006.
WPS 2.0 developments and proposed features Umweltwissenschaften, FR Geowissenschaften, Professur f. Geoinformationssysteme Matthias Müller Castellón, June.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Copyright © AEA — Association of Enterprise Architects 2013 AEA Workgroup Charter Proposal Version of 1 August 2013.
® © 2009 Open Geospatial Consortium, Inc. Hydrology DWG Tentative Work Plan 71st OGC Technical Committee Mountain View, CA. USA Ilya Zaslavsky, David Lemon,
® Sponsored by OGC Alliances for Smart Cities, JTC 1 95th OGC Technical Committee Boulder, Colorado USA George Percivall, OGC 2 June 2015 Copyright © 2015.
52°North WPS. 52°North WPS Agenda  Motivation  WPS basics  behind the scences look  new features.
® Sponsored by GroundWaterML2 SWG 97th OGC Technical Committee Sydney, Australia Bruce Simons 02 December 2015 Copyright © 2015 Open Geospatial Consortium.
HMA January 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order AR January 2011.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
® Sponsored by SOS 2.0 Profile For Hydrology 90th OGC Technical Committee Washington, DC Michael Utech 26 March 2014 Copyright © 2014 Open Geospatial Consortium.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
® Sponsored by Architecture DWG 98th OGC Technical Committee Washington, DC USA Carl Reed, Joan Maso 10 March 2016 Copyright © 2016 Open Geospatial Consortium.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
Page 1 Arnaud Cauchy, Airbus Defence & Space 11th of June 2014 ESA HMA-S Project DDR Meeting WP6100 – WPS2.0 Specification HMA-S Final Presentation – WP6100.
® Sponsored byHosted by Groundwater SWG GroundWater2 (GWML2) Groundwater SWG GroundWater ML 2 (GWML2) 99th OGC Technical Committee Dublin, Ireland Boyan.
AR meeting Esrin, 26. January 2011 Slide 1 Ordering Services for EO Products Abstract (ATS) and Executable (ETS) Test Suite HMA FollowOn – Task 4 AR Meeting.
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
GroundwaterML2 (GWML2) HDWG Update
HMA Follow On Activities
Program / Interoperability Update CDB
XLIFF 2.x release cadence
HMA Follow On Activities
WPS updates from ESA Projects
Ordering Services for EO Products SWG ATS / ETS
HMA-S Final Presentation OGC DSEO Protocol
OGC Web Processing Service 2.0 SWG Insights from last TC OGC
Ordering Services for EO Products SWG ATS / ETS
Bringing the Web Processing Service to a new stage –
Sensor Services & Processing Services
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA Follow On Activities
Submission Title: Closing Report for the TG4n Session in May 2012
HMA Follow On Activities
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
CITE tests for and HMA-T Phase 2 Progress Meeting
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
Status OpenSearch Standardisation Activities - HMA-S Project
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Title: LE TG Closing Report for Session #63
SWE 2.0 – Current Status of Standards
First Canadian OGC Summit
Development roadmap Project name.
GRIDMAN Task Group Closing Report - Session #82
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
and perspectives for AIXM
HMA for Science Task 1 – Project Management
GWML2 Update Eric Boisvert, Boyan Brodaric &
QoS Metadata Status 106th OGC Technical Committee Orléans, France
OGC Happenings: OGC19-020: Testbed-15 Service Discovery
Presentation transcript:

Page 1 Arnaud Cauchy, EADS Astrium 6th of November 2013 ESA HMA AWG HMA-S WP6100 WPS2.0 Specification Session 4: State of the art technology and standards, 12/10/2012

Page 2 OGC WPS2.0 SWG ACTIVITY STATUS Session 4: State of the art technology and standards, 12/10/2012

Page 3 WPS2.0 Specification - Structure Copyright © 2012 Open Geospatial Consortium WPS 2.0 Generic Service Model WPS Features & general requirements WPS 2.0 Generic Service Model WPS Features & general requirements WPS 2.0 OWS Common WPS RPC-Style Comply with OWS common GetCapabilities, DescribeProcess, Execute WPS 2.0 OWS Common WPS RPC-Style Comply with OWS common GetCapabilities, DescribeProcess, Execute RESTful WPS To be defined … RESTful WPS To be defined … Platform Extension OGC WPS2.0 Transaxtional Extension OGC WPS2.0 Asynchronous Management Extension WPS 2. HTTP GET/POST Binding Extension WPS 2.0 SOAP Binding Extension OWS Common based Extensions … … Extensions for WPS-REST

Page 4 WPS2.0 Specification - Progress Copyright © 2012 Open Geospatial Consortium WPS 2.0 Generic Service Model WPS Features & general requirements 95% WPS 2.0 Generic Service Model WPS Features & general requirements 95% WPS 2.0 OWS Common WPS RPC-Style 60% WPS 2.0 OWS Common WPS RPC-Style 60% RESTful WPS To be defined … RESTful WPS To be defined … Platform Extension OGC WPS2.0 Transaxtional Extension ) OGC WPS2.0 Transaxtional Extension ) OGC WPS2.0 Asynchronous Management Extension 85% OGC WPS2.0 Asynchronous Management Extension 85% WPS 2. HTTP GET/POST Binding Extension 60% WPS 2. HTTP GET/POST Binding Extension 60% WPS 2.0 SOAP Binding Extension OWS Common based Extensions … … Extensions for WPS-REST Target Date: March 2014

Page 5 Change Request Status Session 4: State of the art technology and standards, 12/10/2012 State Submitted34 Accepted & Integrated21 62% Reject7 21% Postpone3 9% Under discussion2 6% Withdrawn1 3% Progress Accepted & Integ %6 29% 99%5 24% 20%2 10% ?8 38%

Page 6 WPS2.0 SWG & HMA-S WP Session 4: State of the art technology and standards, 12/10/2012

Page 7 HMA-S WP6100 – Tasks Tasks 1.Contribution to WPS 2.0 OWS Common WPS 2.Contribution to WPS 2.0 OWS Common WPS 3.Editing & Submitting to WPS2.0 SWG – OGC WPS 2.0 Asynchronous Management Extension – OGC WPS 2.0 Transactional Extension 4.Present at TC OGC of Sept. Session 4: State of the art technology and standards, 12/10/2012

Page 8 HMA-S WP6100 –Outcomes Outcomes 1.WPS 2.0 Generic Service Model –Objectives reached –Contribution done, continue to follow 2.WPS 2.0 OWS Common WPS –Objectives reached –Contribution done, continue to follow 3.OGC WPS 2.0 Asynchronous Management Extension –Objectives reached –V1 submitted, reviewed - V2 to edit and re-submit for final vote. Note: cancel operation move to WPS2.0 OWS Common WPS. 4.OGC WPS 2.0 Transactional Extension – Failed: WPS2.0 SWG opposition – V1 submitted, reviewed, but rejected (off) Session 4: State of the art technology and standards, 12/10/2012

Page 9 HMA-S WP6100 – Deliverables HMA-S WP6100 I45.1 WPS 2.0 Discussion Paper –Asynchronous Execution Management OGC submitted. To update & resubmit. Layout OGC into HMA-S template –Transactional Extension OGC submitted. Rework as a OGC Discussion Paper – see proposal HMA-S WP6100 I Schema –Asynchronous - to be extracted from OGC –Transactional – capture from SSEGrid HMA-S WP6100 I Comprehensive Examples –Asynchronous - to extract from 45.1 –Transactional - to extract from I45.1 Session 4: State of the art technology and standards, 12/10/2012

Page 10 Next - Facts & Proposal Facts –WPS2.0 SWG new target date: March 2014 –WPS-T rejected in off at last TC OGC –WPS2.0 ETS impossible to produce before target date. Proposal –Prototype WPS-T operations instead of WPS2.0 ETS (INTECS) –Discussion Paper focused on WPS-T including prototype results. (ASV GEO) –Submission of Discussion Paper, possibly presentation of prototype result (ASV GEO & INTECS) –Based on comment: submit WPS-T Extension or keep as Discussion Paper. Session 4: State of the art technology and standards, 12/10/2012

Page 11 Next - Roadmap Proposal By 01/2014 –WPS2.0 + WPS-T prototype - coding&testing –Discussion Paper on WPS-T - editing 01-02/2014 –Discussion Paper on WPS-T - submission –Review&Comment 03/2014 –Depending on review & comment outcomes –Submit WPS-T Extension or keep it as Discussion Paper. –Take final version of WPS2.0 ATS and dev associated ETS by June 14 06/2014 –WPS2.0 prototype and ETS available Session 4: State of the art technology and standards, 12/10/2012

Page 12 QUESTIONS & ANSWERS Thank You Session 4: State of the art technology and standards, 12/10/2012