Chad Perkins Marley Rutkowski John Olennikov Ben Younce Project Advisor: Robert J. Albright Industrial Advisor: Andy McConnell Client: Mark Utlaut.

Slides:



Advertisements
Similar presentations
1 By: Prof. Y. Peter Chiu 10 / 31 / 2010 POM Oct-2010 – Mid-Term Exam. #1 - A 卷 ~ SOLUTION 2 of 2 ~ #12 ~ #20.
Advertisements

Team Fire On The Mountain: Jennifer Bond, Rob Cagan, Michael Patterson, & Jonathan Smith Faculty Advisor: Dr. Joseph Hoffbeck Dr. Peter Osterberg Industry.
Magnetic Manipulator Team 125. Chad Perkins (Spring Team Lead) John Olennikov(Web Master) Ben Younce Marley Rutkowski(Fall Team Lead) Professor Robert.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
Senior Design 1 Team Shortnose Sucker: Project Auto-Shifting Bicycle Team –Tim Slevin-Vegdahl (Fall Team Lead) –Joan Javier (Spring Team Lead) –Cyrus Medrano.
Senior Design 1 Project Android Pilot Nation Stellar Sea Lions Team –Jordan Fryer –Andrew Olivier –Karen Echon –Jacob Hahn University of Portland School.
S TOPLIGHT PIZZA WIND POWERED ENTERTAINMENT Nicole Feliciano (Team Lead) John Figueira (Team Member) Noor Husain (Team Member) Kyle Grotjohn (Team member)
Temperature Controller for Infrared Paint Curing September 13, 2001 Dec01-11 Team Members Michael Burman, CprE Jonathan Johnson, EE Matthew McMullen, CprE.
Senior Design 1 Project RNG: Radiation-Based Random Number Generator Team Oregon Chub –Ashley Donahoo –Colton Hamm –Alex Brotherston –Matt Johnson University.
TEAM PCG Ben Co (Fall Team Lead), Wendelin Mueller, Garrett Gustafson, and Julia Weimar-East On Project LightBox Primary Faculty Advisor: Dr. Nuxoll Secondary.
Magnetic Manipulator Team 125 Chad Perkins Marley Rutkowski John Olennikov Ben Younce Project Advisor: Robert J. Albright Industrial Advisor: Andy McConnell.
Sun Tracking Solar Array Team Peacock Lane Team Members: Elise King, Caitlin Greeney, Beverly Raposa & Julius Raposa Advisor: Dr. Yamayee Secondary Advisor:
Senior Design 1 Team Bull Trout Project: Elevator Navigating Robot Team –Kelly Kofoed –Nate Whitmore –Shane Moser –Zach Uhles University of Portland School.
A UTOMATED Design Team 8 David Martinez - Robert Raley James Wilson A DJUSTABLE T ABLE Status Report #6 March 22, 2010.
Sun Tracking Solar Array Team Peacock Lane Team Members: Elise King, Caitlin Greeney, Beverly Raposa & Julius Raposa Advisor: Dr. Yamayee Secondary Advisor:
Senior Design 1 Project LDROP Team Howell’s Spectacular Thelypody –Zachary Faltersack (Spring Lead) –Brian Burns (Fall Lead) –Stephen Kam University of.
EE/CS 480/ /16/2015 9:02:14 PM University of Portland School of Engineering Project Yew Inline Power Monitor with Cost Analysis Team Zubin Bagai.
Darren Jordan Adam Huck Daniel Ortiz September 22 nd, 2010 Our design is to install an automated fire suppression system in a vehicle and in the act of.
DEVELOPMENT GATEWAY Solutions that empower. Government of Nepal.
Senior Design 1 Project LDROP Team Howell’s Spectacular Thelypody –Zachary Faltersack (Spring Lead) –Brian Burns (Fall Lead) –Stephen Kam University of.
Final Year Project 2 Systems and Networking Department.
Project Umpqua Electric Vehicle Drive System Team Abdullah Binsaeed Dustin Buscho Steven Arlint Advisor Dr. Albright Industry Representative Mr. Menig.
Senior Design 1 Project RNG: Radiation-Based Random Number Generator Team Oregon Chub –Colton Hamm (Team Leader) –Alex Brotherston –Ashley Donahoo –Matt.
FREQUENCY RESPONSE AUDIO VISUALIZER Team Couch Street Jake Nylund Kevin Ratuiste Robert Rodriguez Alex Arlint Academic Advisor: Joseph Hoffbeck Industry.
JOHN DOE PERIOD 8. AT LEAST 80% OF HUMANITY LIVES ON LESS THAN $10 A DAY.
A UTOMATED Design Team 8 David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report #5 March 3, 2010.
Abstract Due to a change in demand, high voltage transmission circuits can become overloaded. Overloads are resolved by the dispatch of power based on.
Senior Design 1 Project RNG: Radiation-Based Random Number Generator Team Oregon Chub –Ashley Donahoo –Colton Hamm –Alex Brotherston –Matt Johnson University.
A UTOMATED Design Team 8 David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report #7 April 5, 2010.
A UTOMATED Design Team 8 -David Martinez Robert Raley James Wilson A DJUSTABLE T ABLE Status Report # 8 April 14, 2010.
TEAM PCG JANUARY PROGRAM REVIEW Garrett Gustafson (Spring Team Lead) Ben Co, Wendelin Mueller, and Julia Weimar-East Project LightBox Primary Faculty Advisor:
Stoplight pizza Wind belt generator Kyle Grotjohn (Team Lead) John Figueira (Team Member) Noor Husain (Team Member) Nicole Feliciano (Team member) Dr.
Senior Design 1 University of Portland School of Engineering.
Parker Hannifin Corporation Advisor: Professor Kumar Group 23:
Jan 2016 Solar Lunar Data.
Timeline Roadmap Template
Automatic Shifting Bicycle

SCHEDULE Nov 1st - Assembly Table Complete

Multi-year Planning FY2018 – FY2021 August 29, 2017.
Annex 5: Milestones Action Determine sticker label design / features

2017 Jan Sun Mon Tue Wed Thu Fri Sat
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE


Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
PCS Day - Feedback 23th November 2016, Vienna.
Jan Sun Mon Tue Wed Thu Fri Sat


P16228 Magnetically Levitated Propeller

Transfer to Operations
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
XRN Feb 19 Minor Release - Status Update



Sep Oct Nov Dec Jan Feb Mar Apr May
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
IT Managed Services Transition Weekly Activity Report: May 14th, 2019
Digital Archiving Project
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
WSAQDW planning documents
Presentation transcript:

Chad Perkins Marley Rutkowski John Olennikov Ben Younce Project Advisor: Robert J. Albright Industrial Advisor: Andy McConnell Client: Mark Utlaut

* Magnetic Levitation * Small neodymium magnet suspended a minimum of 2 inches from solenoid * Secondary Objective * Movement Control * 1 st Vertical * 2 nd Horizontal

*Fri 22 Nov *Create initial plan for prototype build *Fri 6 Dec *Finalize prototype plans *Determine lead time for any technician help. *All parts purchased or ordered *Fri 17 Jan *Begin programming for Arduino

*Fri 24 Jan *Begin prototype build *Fri 31 Jan *Prototype build 50% complete *Fri 7 Feb *Begin testing/debugging of prototype

*Fri 7 Feb *Prototype build 100% complete *Begin testing/debugging of prototype

*Fri 21 Feb *Have at least 1 dimensional movement working *Fri 28 Feb *Comprehensive Exams *Fri 07 Mar *Complete Final Report Document initial write *Fri 21 Mar *Complete Final Report, first complete draft (ver. 0.9)

* Overloading the power supply * Reduce Voltage from source * Current Max = 6-A, to defeat gravity * Precise adjustments for negative feedback * Hall sensor output range from 0-5 V truncated to V, then expanded back to 0-5 V * Get a reasonably sized heat sink!!

* Overall Team 125 is on track! * Milestones * Oregon snow caused some “slipping” * Tele-comuting/ task delegation * Minor complication solutions being implemented!