22 October 2008 With Euroluna to the moon on board Romit European Lunar Exploration Association and Euroluna Ltd.

Slides:



Advertisements
Similar presentations
Unit 3, Chapter 9, Lesson 9: Space Systems Engineering 1 The Systems-engineering Process Trading Requirements We use the requirements loopa necessary and.
Advertisements

MAE 4262: ROCKETS AND MISSION ANALYSIS Orbital Mechanics and Hohmann Transfer Orbit Summary Mechanical and Aerospace Engineering Department Florida Institute.
“NEFTOGAZ TECH” LLC President of the Group of companies “ND” Leonid Pashkevych, 2014 Specialized presentation about the System of complex automation of.
Preliminary Design Review. Rocket & Payload Schematic.
Special Programs Presentation Nano-Satellite Program Exploring Frugal Engineering in India Living Lab in the Communities.
1 Pacific International Science Center for Exploration Systems (PISCES) Conference – Nov 12, 2008 Commercial Lunar Business Perspectives John Kohut Chief.
Understanding the Systems Engineering Process
Lunar Lander / Orbiter CubeSats Dr. Carl Vermont Technical College (Voice) Randolph Center, VT USA
SATELLITES What They Do and How They Work Michael J. Mackowski Aerospace Engineer October 2013 With Updates from Shawn Shepherd.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
AAE450 Spring 2009 Slide 1 of 8 Orbital Transfer Vehicle (OTV) Masses and Costs Ian Meginnis March 12, 2009 Group Leader - Power Systems Phase Leader -
Project X pedition Spacecraft Senior Design – Spring 2009
Intelligent Ground Vehicle Competition 2006 Brigham Young University.
Page 1, 2010, © EUROLUNA Ltd. Euroluna: Progress and current status, April 2010 Palle Haastrup.
METEOR BACKGROUND This is a foundation project in an ambitious endeavor to provide the RIT research community with a means to conduct near space.
UHM CanSat Team Members: Chris Ho: Team master, software Tyson Fukuyama: Hardware.
National Aeronautics and Space Administration Centennial Challenges Program Space Technology Mission Directorate Cube Quest Challenge Lunar Derby and Deep.
Flying, Hopping and Perching Microbots for Extreme Environment Exploration Deployed Using CubeSats Jekan Thanga 1, Jim Bell 1 Space and Terrestrial Robotic.
History The cold war inspired a space-race between the Soviet Union and the US during 1950’s and 60’s. The Soviet Union became the first country to reach.
Dr Mark Cresswell Satellite Sensors EG5503.
Launching, Orbital Effects & Satellite Subsystems
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
CubeSat Design Guidelines Professor A. Chen Professor J. Juang Teacher Assistant J. Vannitsen 16 Oct SPACE SCIENCE AND SATELLITE SYSTEM ENGINEERING.
CRASH AND BURN ARIANE 5 Kristen Hieronymus SYSM6309 Advanced Requirements Engineering
1 Formation Flying Shunsuke Hirayama Tsutomu Hasegawa Aziatun Burhan Masao Shimada Tomo Sugano Rachel Winters Matt Whitten Kyle Tholen Matt Mueller Shelby.
TC2-Computer Literacy Mr. Sencer February 3, 2010.
1 Formation Flying Project Proposal 2/5/07 Rachel Winters (Team Lead) Aziatun Burhan Tsutomu Hasegawa Shunsuke Hirayama Matt Mueller Masao Shimada Shelby.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
UPC TEAM Ferran Casulleras Gisela Detrell Sergio Mainar Miguel Angel Villarejo Meritxell Viñas Didac Zorita Miquel Sureda (prof.)
8 marts 2009 With Euroluna to the moon on board Romit European Lunar Exploration Association and Euroluna Ltd.
UPC TEAM Sustainable profit-making long-term plan Google Lunar X PrizeUPC Team.
Air-launched Earth-observing Ground Information System Carleton University’s 4 th Satellite Design Team Introduction to AEGIS.
LUNAR ROVER Concept proposal meeting Dr. Ashish Dutta Indian Institute of Technology Kanpur Kanpur, INDIA ( *** for private circulation only)
M E T ROVER MSCD Engineering Technology Critical Design Review Metropolitan State College of Denver April 2004.
Pioneer Anomaly Test – Jonathan Fitt 1 Design Assessment of Lunar, Planetary and Satellite Ranging Applied to Fundamental Physics Jonathan Fitt Friday,
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Can - SAT Project. Agenda Project Description CanSat Objectives Project Objectives Project Rules –Mandatory –Optional History of CanSAT Design Goals Team.
Problem Statement Overview of tasks Requirements for selection test.
1 Arizona State University Senior Design ASU/JPL Flight System Group Members: Robert Hoffman, Dusty Terrill, Adam Nikolic, Josh Ruggiero.
RASC-AL 2010 Topics. TECHNOLOGY-ENABLED HUMAN MARS MISSION NASA is interested in eventual human mission to the Martian surface. Current Mars design reference.
FAST LOW THRUST TRAJECTORIES FOR THE EXPLORATION OF THE SOLAR SYSTEM
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
DemoSat II Colorado Space Grant Consortium Design (EPICS) Division Colorado School of Mines Golden Colorado Critical.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
1 Jet Propulsion Laboratory JPL Flight Team Adam Nikolic Josh Ruggiero Bob Hoffman Dusty Terrill.
Teams- Moon  Navigation  Life Support  Remote  Medical  Isolation  Data  Communication  Probe  PAO (if needed)
1. 2 Content: ► 1pc Magnus Fusion Aircraft Vantage ► 1pc - Notebook based workstation for camera control and video display and storage ► 1pc - Peripherals.
John Martin April 5, 2001 SuperNova/ Acceleration Probe (SNAP) Introduction.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
After-workshopactivity Mars Rover Challenge Image credit: NASA/JPL-Caltech/MSSS.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
The Future of Human Spaceflight *** A Journey to Mars
Simulation-to-Flight 1 Additional Resources:
Planetary Lander PDR Team Name
Technical Resource Allocations
Development and Principles of Rocketry
Bellwork 12/22 What kinds of design differences would there be in planning a mission to Jupiter versus sending a satellite into Earth’s orbit?
Space Travel Present & Future
Ideal Operating Time for Minimized Power System
Project Introduction Spring 2017.
EagleSat 2 – Mission and Development Overview
Team A Propulsion 1/16/01.
The Lunar Lion By: Hannah Flick.
Presentation transcript:

22 October 2008 With Euroluna to the moon on board Romit European Lunar Exploration Association and Euroluna Ltd.

22 October 2008 Agenda for meeting Welcome 2. Introduction to the GLXP competition 3. Presentation of the Euroluna project 4. Presentation of Team members 5. Questions and Comments 6. Discussion 7. Close

22 October 2008 Euroluna European Lunar Exploration Association, registered in Denmark. Euroluna AG, registered in Switzerland Volunteer based, shoe-string budget

22 October 2008 Team name: Euroluna President: Palle Haastrup Craft Name: ROMIT Main web site: Euroluna News at Blog: news.euroluna.dk

22 October 2008 Collaborators Clyde Space Inc. Langtved Data Micro Aerospace Solutions, Inc Xx Preliminary contacts with: Jamesburg disc

22 October 2008 Key team members Palle: Team leader Tor: Software Soeren: Mechanical design Sten: Trajectory Signe: Press Erik: Software operator Mogens: Embedded software xxxxxx

22 October 2008

Mission Put a remote operated vehicle on the moon Participate in the GLXP challenge

22 October 2008 Google Lunar X prize 20 million $ 1 st prize 5 million $ 2 nd prize 5 x 1 million $ prize

22 October 2008 To win Be the first team Private funding Get to the moon Drive/move 500 m Send back “video”

22 October 2008 GLXP mission requirements RequirementEuroluna plan Unspecified payload 10 MB transmitted to craftMinimum 64 MB memory Roam 500mDrive, 1 cm/s Colour camera with pan tilt and zoom capabilities, minimum resolution 0,3 milliradians per pixel Multiple pinhole cameras with digital zoom, resolution of 3000*3000 pixels Videos

22 October 2008 Euroluna technical solution One integrated craft Small rover Bi prob rocket motor Solar powered Minimum design of space component.

22 October 2008 Key mission parameters Departure from LEO (800 km) Trajectory: Weak Stability Boundary Design: no redundancy Time planning: launch opportunity end 2009

22 October 2008 Romit Subsystems 1.PROPULSION 2.POWER 3.ATTITUDE CONTROL 4.ONBOARD CPU 5.WHEELS AND MOTORS 6.GPS 7.CAMERAS 8.COMMUNICATION 9.STRUCTURAL CONNECTIONS

22 October 2008 Thermal Analysis Design temperature in space: ° C Design temperature on the moon: ° C This leads to an acceptable α/ε of between 0.65 and 0.88 The outer coating: shade of grey and heat conducting

22 October 2008 Other specs HAL specs (linux) Connections: USB Operation (out of rocket, attitude control, burn 3100 m/s, wait 4 month, turn around, break, land..) Link budget: large disc needed.

22 October 2008 Mechanical and vibration analysis Mechanical issues on connection between the two tanks. Vibration analysis not made yet, but assumed to be no serious problem…

22 October 2008 Link budget

22 October 2008

Solar cell navigation (!) By measuring the solar input to the 6 solar cells, we get a rough direction/orientation of the spacecraft. Power measurement can handle this ?

22 October 2008

SystemConsumption/Production in Watt Motors10 W for normal operation, 5 w/motor for exceptions Camera3 W Motor for turning camera1 W Computer1.5 W Radio Transmitter3 W Production with 3 layer solar cells, max 17 W Power consumption

22 October 2008

Trajectory design Weak Stability boundary route Advantages: all launches can be used Disadvantage: time to moon, precision

22 October 2008

Mission plan outline

22 October 2008 Mission plan TimeAction 0Ejection from storage bay, Health check, status of all systems. Transmit to ground control Use GPS, navigation cameras to determine position Calculate orbit, using position data Calculate time to burn (T1). Change attitude for 1 st burn, initiate rotation about longitudinal axis

22 October 2008 TimeAction T1First burn, constant GPS position measured for monitoring Position determined from GPS, Earth-Moon- Sun images. Course compliance monitored for possible corrections Calculate time till arrival in hyperbolic trajectory, T2 Determine whether there is fuel enough for orbiting the Moon or if landing has to be immediate.

22 October 2008 TimeAction T2Arrival in Moon Hyperbolic trajectory. Decision is carried out; attitude corrected and thruster fired If we obtain a circular orbit, Newtonian height and velocity are calculated and correlated with crater images. Results are transmitted to ground control Calculate optimal landing place and time (T3) T3Initiate landing sequence Send confirmation of successful landing

22 October 2008 Moon operation mission plan Given by GLXP requirements Turn craft if upside down, drive 500 m Long term survival prize for restart after lunar night. Insulate components, other options ?

22 October 2008 Discussion Main conceptual design frozen Mechanical design still evolving Offer for launch end of We need to go commercial off the shelf, rather than custom designed.