PROVISION OF FIT FOR PURPOSE GUARDING SERVICES AT MAJUBA RAIL PROJECT.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Correctional Certification Subpart 1. Purpose: establish program certification requirements that govern facilities providing correctional program.
Managing the Health and Safety of Contractors
SEPTEMBER 2009 CONSIGNOR | OTHER GENERAL INFO ON PART 108
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
Generation Business Line
PART 108 – Presentation by Denver F. Wright November 2008.
Unified Carrier Registration (UCR) Update August 24, 2006.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Contractor Safety Management
Eurotech Monitoring Services Ltd Eurotech Monitoring Services.
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
1 Licensing Scheme for Drug Dependent Persons Treatment and Rehabilitation Centres.
1 Perimeter Security System. 2 Performance Objectives 1. List the four key duty posts of the Perimeter Security System. 2. Explain the purpose of perimeter.
■ This Training Module is designed to educate Management on FMCSA Compliance Review (CR).
THE NATIONAL SITUATION ON THE HEALTHAND THE SAFETY AT WORK in Poland prepared by: Małgorzata Żydło Danmar Computers.
Basics of OHSAS Occupational Health & Safety Management System
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
Federal Aviation Administration (FAA) Presented by Jim Gardner, AFS-200 Proposed Amendment To Annex 6, Part I International Commercial Transport – Aeroplanes.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
K RIEL C OLLIERY Anglo Coal Contractor Management.
NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
1 HEALTH & SAFETY FIRE SAFETY SATUTORY RESPONSIBILTIES FOR MANAGERS.
Accessible, Practical Learning for Staff Induction and General Health & Safety Awareness Welcome to ‘Getting Started in Health and Safety’
Prime Responsibility for Radiation Safety
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Development of Agreement Concerning the Adoption of Uniform Conditions for Periodical Technical Inspections of Wheeled Vehicles and the Reciprocal Recognition.
Quiz for supervisors. 2 Question # 1 From the list below, identify supervisor responsibilities described in the Workers Compensation Act (WCA) and the.
Training Standards & Guidelines Moscow September 2004
Authorization Part III. Content of a license Structure of a license General elements General and specific conditions Annexes Documents attached (e.g.
Authorization and Inspection of Cyclotron Facilities The Authorization Process.
CCTV SECURITY & MONITORING SERVICES DAY SEVEN TECHNOLOGY CONSULT DSTC Monitoring Services Ltd DSTC.
Agreement concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such.
Contractor Health & Safety Requirements Project :GSU Transformer System Date: 16 May 2014 A Stuart SHEQ Manager – Gx Coal 2.
Clarification Meeting: Supply and Delivery of performance and testing equipment for Boiler, Turbine and Auxiliary equipment at Kusile Power Station Project.
13/01/2015 ANKERLIG & GOURIKWA POWER STATION STATION OCGT Tender Presented by Obert Mgwenya.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
SHEQ presentation Date 9 July SCOPE This applies to all contractors acquiring to conduct meter reading, disconnecting and reconnection work throughout.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Clarification Meeting: Provision of laundry services at the Kendal Contractor’s Village and Wilge Artisan Village 14 August 2015 Tender no: Tender no:
PRE-BID MEETING CONSTRUCTION OF MEDUPI-BORUTHO SECTION A & B 400kV TRANSMISSION LINES PRE-BID MEETING SECURITY MANAGEMENT Presented by: Peter Joseph 13.
POWER DELIVERY PROJECTS Central Grids Simmerpan - Civil works. 10 July 2015 Vusi Mthimunye.
SOUTH EASTERN EUROPE REGIONAL SEMINAR June 2005, Sofia, Bulgaria Arms Export Control and Customs Administration BULGARIAN NATIONAL CUSTOMS AGENCY.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
SHE Requirements for the Eskom Procurement and Supply Chain Management Process ( ) Nomusa Leburu.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
GROUP CAPITAL DIVISION Majuba Rail Project Clarification Meeting Boreholes Health and Safety Insert image here Lebo Ramoleko Date: 05 May 2016 Time: 10h00.
Clarification Meeting: Provision of Recruitment Services for Majuba Rail Project 19 June 2014.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
04 March 2014 Request for Proposal (RFP) the provision of professional services for the Eskom Academy of Learning (EAL) Refurbishment project for a period.
Clarification Meeting : CORP 3309 FOR THE PROVISION OF CONFIGURATION MANAGEMENT SERVICES FOR A PERIOD OF FIVE (5) YEARS Auditorium 1, Eskom Enterprise.
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
GROUP CAPITAL DIVISION Majuba Rail Project Pre-Bid Horticulture and Maintenance Contract Health and Safety Presentation Insert image here Lux Mphela.
Minimum Set of Requirements for Suppliers
We always have time to work safely
Minimum Set of Requirements for Suppliers
Safety Inductions CPNZ Basic Training
PowerPoint presentation
AERODROME MANUAL.
Contractor Control system
Contractor Control system
Superior Security Solutions
Safety is part of our culture at Halliburton
Contractor Control system
Chemical Purchasing.
LEGAL REQUIREMENTS FOR ACT 13 OF 2006
Contractor stand-down Western Region 2018
Presentation transcript:

PROVISION OF FIT FOR PURPOSE GUARDING SERVICES AT MAJUBA RAIL PROJECT

CONTENTS SCOPE TENDER RETURNABLES APPLICABLE LEGISLATION AND STANDARDS TECHNICAL PROCESS (EVALUATION) TECHNICAL EVALUATION OBJECTIVES HUMAN RESOURCE COMPLIMENT EQUIPMENT REQUIRED QUESTIONS AND ANSWERS 2016/06/122

SCOPE OF WORK The Service provider shall furnish on a continuous 24-hour basis for the defined period with fully trained (as defined in paragraph 8 of this document) male and female uniformed Private Security Industry Regulatory Authority (PSIRA) registered security officers. The Service provider shall be required to provide personnel with PSIRA Grades C for the various tasks required by this project. The duties of the Services Provider’s officers shall be those specified herein. Shifts to be covered and shift times: Day shift:06:00 – 18:00 Night shift:18:00 – 06:00 Weekends and Public Holidays Dayshift:06H H00 Weekends and Public Holidays Nightshift:18H H00 The security services shall be required at the Majuba Rail Project Offices and at various sites as per the project plan. In addition to structural buildings and construction yards, security services will also be required during the construction of the physical railway line as well as the associated structures. 2016/06/123

SCOPE OF WORK CONT…. The services will be required at the entry/access points detailed hereunder in accordance with existing security procedures. Please note that these locations are subject to change, in alignment with the construction and security operational requirements. KM 06 KM 41 KM 47 Koppieskraal UCG MRP offices Any other point as determined in accordance with identified risks 2.5The Service Provider shall furnish Eskom Holding SOC Ltd (ESKOM) with four (4) site supervisors performing site inspections during dayshift (2) and night shift (2), seven days a week respectively. The site supervisor shall be duly responsible for the supervision of the security officers assigned to Majuba Rail Project. 2016/06/124

TENDER RETURNABLES Firearm licences for all company firearms Competency certificates for all guards who will be issued with a firearm Proof legal compliance in terms of firearm compliance List of all company firearms Personnel file with –proof of PSIRA registration (PSIRA certificate) PSIRA letter of good standing. Proof of Firearms control act 60 of 2000, regulation 21 training. Firearm Safety plan /Ammunition management plan Copy of Identity Document (ID) of guards Medical certificate of guards List of patrol vehicles and registration number of vehicles 2016/06/125

APPLICABLE LEGISLATION AND STANDARDS  PSIRA,FIREARMS CONTROL ACT(Act 60 of 2000),  Criminal background checks  OHS ACT  Eskom cardinal rules(Life saving rules)  Eskom vehicle safety policy  Eskom substance abuse procedure  Medical fitness  Standard for ballistic resistance of body armour  Wearing of PPE by Security personnel  NRTA(AARTO)  Unendorsed drivers licenses  Roadworthy vehicles  Proof of ownership 2016/06/126

TECHNICAL PROCESS: EVALUATIONS  To visit the shortlisted contractor sites to evaluate the premises  To conduct fitness for purpose inspection on fleet and equipment  Inspect documentation  To assess organisational and operational requirements 2016/06/127

TENDER EVALUATION OBJECTIVES THE OBJECTIVES OF THE TENDER PROCESS ARE INTENDED TO ENSURE THAT:  Procure security services through the prescribed legal, commercial, and ethical requirements;  Mitigate the risk of procuring goods and services that are substandard; and  Ensure compliance with legislative and organisational requirements  Provide equal opportunities to all the bidders 2016/06/128

Human Resources Compliment 2016/06/129

EQUIPMENT REQUIRED Panic buttons (linked to a 24/7/365 control centre) Remote armed response capability PPE (Ballistic vests (Level 111 SA mix), Appropriate clothing for inclement whether conditions). Two –way radios and Mounted base station linked to a 24/7/365 control centre Cell Phones Torches Batons Hand Cuffs Reflective jackets Safety shoes Breathalysers in line with Eskom Substance abuse procedure Clocking stations Patrol vehicles suitable for a construction site(preferably 4X4 as per Eskom Vehicle safety requirements) Firearms Firearm safes (SANS /SAPS approved) 2016/06/1210

Q & A