The Petoskey WWTP Leachate Disposal Option Bay Harbor Regional Stakeholders Group April 28, 2010.

Slides:



Advertisements
Similar presentations
Wastewater Lagoon Cleanout How do they do that? Why is it important?
Advertisements

Got Capacity? A Case for Special Allocation Limits
Engineers scientists architects constructors Case Study UV Disinfection Interference at Big Rapids WWTP 83 rd Annual Conference Michigan Water Environment.
Engineers scientists architects constructors Case Study UV Disinfection Interference From Industry MWEA Industrial Pretreatment Seminar October 24, 2007.
LEACHATE MANAGEMENT AND TREATMENT
What's New for Whole Effluent Toxicity (WET) Bill Dimond MDEQ Aquatic Toxicology Laboratory.
Proposed Regulatory Framework for Wastewater Presented by Claude Fortin Winnipeg, Manitoba December 6, 2007.
Indiana Department of Environmental Management
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Whole Effluent Toxicity (WET) Testing Water Quality Standards Workgroup Meeting June 26, 2007.
Treatment of Slaughterhouse Wastewater
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Detroit WWTP NPDES Permit Informational Meeting Michigan Department of Environmental Quality October 23, 2014.
Introduction to Environmental Engineering Code No. (PE389) Lec. 6.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
WWTF’s MPCA Permit Renewal January 14,  Our current NPDES permit expired Sept. 30,  NPDES permits are a 5 year term.  Upon expiration,
 Carry both sewage and storm water.  During average rainfalls the volume of water is 5-15 times greater than normal.  Sewage treatment plants are not.
Jerald O. Thaler, P.E. Fishbeck, Thompson, Carr & Huber, Inc. Elaine J. Venema, PE. Fleis & VandenBrink Engineering, Inc.
Part III Solid Waste Engineering
Greater Vancouver Regional District’s Liquid Waste Management Plan.
WASTEWATER SYSTEM MANAGEMENT by John Lisenko Wastewater systems are indispensable for community health. One of the signs of progress and civilization is.
WASTEWATER ENGINEERING
The Clean Water Act Objective: To restore and maintain the chemical, physical, and biological integrity of the nation’s waters PHOTO OF 2007 OUTFALL AT.
1 Wastewater Treatment System of New York City December 17, 2008 Lindsey Walaski Wastewater Treatment.
Michigan Water Environment Association Annual Conference June 2013 Curtis M. Goodman Marquette Area Wastewater Treatment Facility Jerald O. Thaler, P.E.
1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
Wastewater Treatment Plant
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
Wastewater generation
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
MWRA Massachusetts Water Resources Authority Water Treatment History.
► engineers scientists architects constructors ► Managing Mercury Mania Jerald O. Thaler, P.E. Fishbeck, Thompson, Carr & Huber, Inc. Michigan Water Environment.
Detroit WWTP NPDES Permit Informational Meeting Michigan Department of Environmental Quality October 17, 2013.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Human Waste Disposal More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement through water. More than 500 pathogenic.
Tammy Klemens & Darla Topp, Kent State University Stark Campus, North Canton, Ohio, USA What’s the Stink About Sewage?
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
Source Control Planning for Municipal Wastewater System Permit Compliance Environmental Trade Fair & Conference Austin, TX. May 6, 2015 David James Santiago.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
November 17, 2015 NC AWWA-WEA Annual conference
Introduction to Environmental Engineering Dr. Kagan ERYURUK
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Public Information Meeting Wastewater Treatment January 26, 2016.
1 Public Meeting Regarding US Steel’s Gary Work NPDES Permit Renewal September 26, 2007 IN Department of Environmental Management.
Streamlining Rules for Pretreatment Regulation Requested changes to Chapters 922 & 923 of the City of Zanesville Codified Ordinances Presentation to City.
Environmental Science  Mid-1800s, 25,000 people living along the River Thames in London died of cholera  River was declared “dead” by 1950  Walk.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
5th Annual Water and Sanitation Workshop
CTC 450 Review WW Sludge Processes.
Effluents Standards In Pakistan Environmental protection agency (EPA) is responsible for all aspects of the environment; regulation of sanitation and.
FUTURE REQUIREMENTS AND GOALS
Module 17: MIXING ZONES A limited area or volume of water where initial dilution of a discharge takes place and where numeric water quality criteria.
Cara Cowan Watts Graduate Student Biosystems Engineering
Wastewater Treatment.
Wastewater Treatment.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Sewage Treatment.
Jim Flechtner, PE Executive Director April 26, 2018
Wastewater Treatment.
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Wastewater Facilities Upgrade Project
Industrial Pollutants in the Haw: Community Impacts and Action
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Wastewater Treatment.
Wastewater Treatment.
Presentation transcript:

The Petoskey WWTP Leachate Disposal Option Bay Harbor Regional Stakeholders Group April 28, 2010

Agenda Overview/Wrap-upDan Ralley City Manager Key Infrastructure Issues Dennis J. Benoit, P.E. Hubbell Roth & Clark, Inc. Key Operational & Regulatory Issues Jerald O. Thaler, P.E. Fishbeck, Thompson, Carr & Huber, Inc.

Potential Issues Commercial Users Residential Users Industrial Users WWTP Treated Effluent Biosolids ̶ Infrastructure ̶ Regulatory Leachate ̶ Infrastructure ̶ Operational ̶ Regulatory

Key Infrastructure Issues

The WWTP  1.5 million gallons/day current flow  Discharge to Little Traverse Bay CapdetWorks ®

System Improvements Necessary to safely and reliably accommodate leachate, and to optimize treatment for 20% increase in flow  Dedicated Pipeline (isolate leachate from wastewater)  Equalization Tank (store leachate and provide controlled blend with wastewater)  WWTP Modifications (ensure effective treatment and high quality effluent) While some WWTP modifications in City’s future capital improvement plan, must implement now for uninterruptable service

Dedicated Pipeline Forcemain separate from sanitary sewer 4-mile route with air reliefs, cleanouts, block valves City offering existing pipe through congested area Directional drilling will minimize surface disruption

Equalization Tank 1 million gal estimated total volume at Turcott Field Blend high TDS/low BOD leachate with wastewater  Flow balancing to stabilize leachate:wastewater ratio  Load balancing to stabilize food for microorganisms Buried tank will preserve park setting Previous site construction validates constructability

WWTP Modifications Upgrade headworks  Provide “clean” wastewater for blending Add third primary settling tank  Provide redundancy in case of unscheduled outages Improve aeration control  Promote health of potentially TDS-stressed microorganisms  Prevent foaming, bulking sludge, etc. Mitigate odors  Odors can form when leachate and wastewater mix Enhance biosolids handling  Solids can form when leachate and wastewater mix SCADA and laboratory  Support significantly increased control/monitoring requirements

Key Operational/Regulatory Issues

Effluent and Biosolids Quality Effluent to Little Traverse Bay  Tightly regulated by MDNRE  City has excellent compliance history Biosolids disposal via land application  Tightly regulated by MDNRE  City easily meets all applicable standards Neither can be compromised by accepting leachate

Industrial Pretreatment Program (IPP) Tightly regulated by MDNRE Required to protect WWTP effluent and biosolids  Sewer Use Ordinance  Nondomestic User Permits (e.g., Northern Michigan Hospital)  Surveillance by City staff Basis for leachate regulation  Flow of up to 300,000 gal/day  Self-monitoring requirements  Appropriate discharge limits

Mercury Bioaccumulative Chemical of Concern (BCC) in aquatic environment : City’s current NPDES permit limit is 10 ng/L (ppt)  “Level Currently Achievable” under MDNRE’s variance for existing dischargers  Long-term goal is water quality standard of 1.3 ng/L  Mercury Minimization Program required

Mercury Minimization City’s program extremely successful  Six consecutive years below water quality standard No change during/after leachate discharge in past: Included untreated leachate (except part of 2004) Leachate discharge ceased in July 2006

Mercury Treatment Monitoring data indicate excellent removals Expected effect of leachate on effluent:  0.5 ng/L → 0.7 ng/L  Well within water quality standard (1.3 ng/L) Expected effect of leachate on biosolids:  1.8 mg/kg → 2.1 mg/kg  Well within land application standard (17 mg/kg) Soluble>98% Insoluble~100% Total>99%

Whole Effluent Toxicity Acute toxicity ̶ Lethal to 50% of test organisms after hours ̶ Strictly prohibited by water quality standards Day-to-day, not average, requirement Standard test organisms Ceriodaphnia dubia Larval Fathead Minnow

Initial Evaluation by City Effluent mixed with:  Bay Harbor leachate (1:1:1 ratio of Seep 1, Seep 2, and Edge Drain)  East Park leachate  75/25 blend Acute toxicity when leachate content exceeded: December 2008-January 2009 LeachateCeriodaphniaFathead Minnow Bay Harbor13%20% East Park60%>100% 75/25 Blend(~8.5%)17% Great Lakes Environmental Center Traverse City, MI

Initial Evaluation by CMS Effluent mixed with  Approximately same blend of Bay Harbor and East Park leachates (75/25)  Bay Harbor leachate was 1:1:0.25 ratio of Seep 1, Seep 2, and Edge Drain Acute toxicity when leachate content exceeded December 2009 LeachateCeriodaphniaFathead Minnow 75/25 Blend23-29%-- AECom Environment Fort Collins Environmental Toxicology Laboratory Fort Collins, CO

Acute Toxicity Threshold Critical parameter relative to maximum allowable leachate flow (300,000 gal/day requested)  10% corresponds to about 150,000 gal/day  25% corresponds to about 375,000 gal/day Previous test results suggest significant influence by sources making up Bay Harbor leachate  City test based on 1:1:1 ratio of Seep 1, Seep2, and Edge Drain; CMS test based on 1:1:0.25 ratio  No data with Pine Court, which as reactivated in 2009  Unknown impact of day-to-day variations in Bay Harbor leachate “cocktail” (specific ion-ion interactions, not just TDS, known to influence toxicity)

Sensitivity Analysis City requested additional tests to evaluate effect of potential variation in Bay Harbor leachate “cocktail” Six tests, representing actual peak days for different leachate sources during plus average for 4 th Quarter of 2009: Requested tests have not been performed Date Seep 1 Seep 2 Edge Drain Pine Court East Park June 26, 2007:42%30%28%0% November 1, 2008:4%4%70%26%0% February 11, 2007:23%31%46%0% March 3, 2009:20%15%11%31%23% December 18, 2009:19%13%12%0%56% Average, Q4 2009:27% 11%22%

Wrap-up

SUMMARY Leachate can be accommodated if necessary system improvements are provided  Dedicated Line  Equalization Tank  WWTP Modifications Questions remain over acute toxicity threshold (leachate fraction in effluent ) and maximum allowable flow  Requested sensitivity tests must be performed Lower discharge mercury expected with WWTP disposal than direct discharge option

Questions and Discussion