Wastewater Department Staff Report 2015
Gravity Thickener and pumps Replacement of both thickener pumps, valves, controls, grinder and electrical system Replacement of entire G.T. to include new coating, concrete repair, walkway, instrumentation, drive shafts, energy displacement baffles, flights, weirs and scum trough.
Primary Dewatering Processes Belt Filter Press, 12-14% Solids Screw Press, 30-32% Solids Replacement of entire system to include new dewatering equipment, inlet valves, sludge pipeline, electrical system, polymer system, flow meter, conveyors, holding area, instrumentation and structure
Secondary Clarifiers Replacement of entire system to include new drive shafts, inlet valves, energy displacement baffles, flights, chains, wear shoes, weirs and scum troughs Increased reliability, stability and capacity of the biology system and compliance
Blowers Existing natural gas blowers were replaced with high efficiency electric turbo blowers Saving the city an average of $8,000 per month in utility fees
Aeration Basins Replacement of entire system to include new stainless steel piping, diffusers, fiberglass walls, valves, and instrumentation Increased reliability, stability and capacity of the biology system and compliance
Supervisory Control and Data Acquisition Replacement of entire system to include new programmable logic controllers, human machine interface, fiber optic lines, servers, computers, instrumentation and program Provides real-time monitoring and controls and the ability to track and trend the system
Real-Time Monitoring
Effluent Sampling Biochemical Oxygen Demand January February March April May June July4.90 NA August16.30 NA September6.50 NA October5.10 NA November6.80 NA December2.80 NA Yearly Avg Min Max
Effluent Sampling Tjeldahl Nitrogen
Effluent Sampling Ammonia-Nitrogen
Effluent Sampling Nitrate-Nitrogen
Effluent Sampling Total Nitrogen
Utility consumption (electrical)
Pond Maintenance Restoration of Pond 1, 2, 3, and 5 including Restored 3:1 slope Leveled top bank and bottom bed Removal of brush Pond 4 still needs to be rehabbed, found a large amount of material in the bottom due to lack of maintenance done in the past. Increase in percolation efficiency and pond capacity
Dean’s Wash Complete Restoration of Dean’s Wash including 2 Box culverts Primary effluent lines Primary sludge lines Electrical duct banks Compacted slopes Fencing
Collection System Staff Report
Manhole Maintenance and Repair Replacement of entire unit Increase in reliability and accuracy of permit required samples
General Cleaning
Restaurant Cleaning & Inspections
Sewer Cleaning & Inspections