1 Salt Water Disposal Pilot Project October 14, 2008.

Slides:



Advertisements
Similar presentations
EPA’s Underground Injection Control Program
Advertisements

Request for Approval of Alternative Waste Management Practices (OG-071) For Oil & Gas Operations in Pennsylvania.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer Camden County Municipal Utilities Authority Camden, New Jersey September 17, 2014.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
Mike Turner - Senior Vice President, Global Production License to Operate: Socio-economic Impacts and the Public-Industry Partnership.
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Staff Induction-Environmental Awareness
Parking on Block 1129: Challenges and opportunities Prospect Heights Neighborhood Development Council March 8, 2012.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Federal Energy and Environmental Regulation Agencies and Laws
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review April 28, 2014.
Greening of Fort Wayne, IN Partners for Pollution Prevention June 6, 2007.
Parking on Block 1129: Challenges and opportunities Prospect Heights Neighborhood Development Council March 8, 2012.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
EPA's Regulatory Approach : Climate Mitigation via Sequestration of CO2: by Rob Ferri (EPA - Underground Injection Control) This presentation has not been.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
March 12 th, 2013 Stormwater Rate Structure Discussion.
Water Management for the 21 st Century September 24, 2015 SPE – Ft. Worth Chapter.
 Nicole Capretz Director of Policy Councilmember Ed Harris WORKING DRAFT Climate Action Plan City of San Diego.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
Texas Innovative Water 2010 Kevin Morrison, P.G. Project Coordinator / Water Resources What has SAWS Learned about Concentrate Disposal Options for Inland.
Brownfields and Community Gardens. Purpose  The purpose of this presentation is to provide an overview of the Brownfields Program and how it can service.
Ch WAC Geologic Sequestration of Carbon dioxide John Stormon Hydrogeologist Washington Department of Ecology Seattle, WA October.
2014 Program Priorities January 23, Outline Major 2014 Goals 2013 Accomplishments Major 2014 Activities Partnerships 2.
Community Development Department APPLICATION #2457 GRAND HAVEN PUD AMENDMENT APPLICATION #2411 GRAND HAVEN NORTH: SMALL SCALE FLUM AMENDMENT APPLICATION.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
Overview of San Diego Climate Action Plan Nicole Capretz Director of Environmental Policy iMayor’s Office.
Northern Great Plains Water Consortium (NGPWC) Bakken Water Opportunities Assessment Water Resource Opportunities Meeting Bismarck, ND December 10, 2009.
Regional Recycling Solutions, LLC.   County purchased 103 acres in July of 1993 from Greene Land Company  Elchin Inc purchases 40 acres in April 1998.
Spent Fuel Pool Island Southern California Edison, San Diego Gas & Electric, Cities of Anaheim and Riverside CDP Application #: August 13, 2015.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
Planning & Community Development Department Lower Hastings Ranch Moratorium Extension City Council January 25, 2016.
Understanding the SWD Market in the Bakken Shale Play, North Dakota Authors: J. Daniel Arthur, P.E., SPEC; Bobbi Lorengo, EIT; Alex Zyskin.
Crude Oil Moratorium May 3, 2016 Vancouver City Council Workshop Sandra Towne, Planning Manager Brent Boger, Assistant City Attorney.
Garry Kaufman Air Pollution Control Division.  Background on Oil and Gas Air Regulation in Colorado  Basis for Additional Air Quality Requirements for.
ACQUISITION OF REAL PROPERTY LOCATED AT 2110, 2222 AND 2244 SOUTH AIRPORT WAY Stockton Redevelopment Agency October 7, 2008 City Council Agenda Item 6.13.
Town Hall Meeting MLK Community Center July 21, pm.
Air Pollution Control Program Regulation Update Presented to City Council Public Safety and Health Subcommittee Mamie Colburn, M.S, R.S. Missoula.
Why Collect and Recycle Electronics -Clive Hess. Benefits of Recycling Establishes more jobs, economic development, and tax revenue Makes less impact.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
ITEM 6.B ZONING TEXT AMENDMENT AT CITY COUNCIL PUBLIC HEARING AUGUST 25, 2009.
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
City of Charlottesville
Finance Committee & City Council October 10, 2016
Manchester’s CSO Program: A Look Behind and a Look Ahead
Green Energy and Green Spaces
Tam O’Shanter Rezoning
Mohr Separations Research, Inc.
4.3 Cycling Of Matter I. __________ Cycle
Joint City Council / Planning Commission
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Board of County Commissioners
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

1 Salt Water Disposal Pilot Project October 14, 2008

2 Purpose Review City’s current requirements on Salt Water Disposal well (SWD) use Outline proposal for urban salt water management pilot Discuss next steps Answer questions

3 Current Regulations Prior to 2006 –no commercial salt water disposal wells within City After 2006 –non commercial salt water disposal wells allowed –lease use only –Must meet requirements of Section of the Gas Ordinance –identified on the Railroad Commission form Moratorium on salt water disposal wells currently in effect.

4 Issues Related to Salt Water Disposal Trucking waste water –Wear and tear on roads –Air pollution contributions Potential benefit in recycling water Establishment of environmental standards for piping and disposal of salt water

5 Issues Related to Salt Water Recycling Recycling salt water remains a challenge –Saline content varies widely –Wells are not consistent –No two technologies are alike Testing of technology at Brentwood site On-going support of other technologies elsewhere

6 Water Evaporation System Intevras’ EVRAS system Chesapeake has plans to install four EVRAS water evaporation units at the Brentwood SWD site in Fort Worth. Employs natural process of evaporation to turn water into water vapor Uses “waste heat” from compressor; no need to consume fuel This nominal EVRAS unit in Cresson, which has only one evaporative section, is half the size of the four proposed units for the Brentwood SWD, which will use two evaporative sections each. Evaporative section

7 Water Evaporation System About 1,200 barrels per day (BPD) of water can be evaporated out of 3,000 BPD of highly concentrated salt water (produced water) Result: less water to be injected into salt water disposal wells Clean water vapor is released into the atmosphere, where it will naturally return to the earth as rain This EVRAS unit operating in Cresson for Carrizo Oil & Gas has the capacity to produce 175 barrels of water per day. The four units planned for the Brentwood SWD will produce approximately 1,200 barrels of evaporated water per day from 3,000 barrels of produced water. Each of the four proposed units for the Brentwood SWD uses a minimal footprint of 45’ x 20’ x 15’ deep.

8 Water Evaporation System 8

9 Brentwood Salt Water Disposal Site Located on East First Street next to old Arc Park Permitted with the Texas Railroad Commission Permitted by the City in 2006 before moratorium adopted Only permitted SWD site within City

10 SWD Pilot Proposal Goals: –Decrease truck mileage on Fort Worth Roads –Verify recycling technologies –Increase the volume of water being recycled –Develop a long range plan for the management of saltwater in the City of Fort Worth City will partner with Chesapeake to permit a broader use of the Brentwood SWD under specific conditions –evaluate benefits of piping and local disposal of salt water

11 SWD Pilot Proposal Brentwood SWD will remain non-commercial and exclusively for Chesapeake’s use Chesapeake gas wells in the “Brentwood Pilot Corridor Area” will be allowed to use the Brentwood SWD for handling salt water. Currently: –31 pads –81 wells –Approximately 6,000 bbl water daily Pilot Program will include: –Increased monitoring and reporting SCADA Salinity out/in Volumes out/in –Include recycling component –Traffic reduction plan –Reduce impact on the environment

12 Brentwood Pilot Corridor Area

13 Proposed Plan Combines EVRAS system & SWD injection Phase I: All Brentwood Corridor – trucked Phase II: 3 months; Trinity South – piped (& trucked)* Phase III:12 months; Trinity North – piped (& trucked)* Phase IV: 15 months; East of 820 – piped (& trucked)* *Goal is to pipe as much as possible

14 Phase-In Approach Phase I –all trucked

15 Phase-In Approach Phase IV – 15 months: East of 820 piping completed Phase III – 12 months: Trinity North piping completed Phase II – 3 months: Trinity South piping completed Phase I – all trucked

16 If maximum trucked to Brentwood: 1,374,250 miles saved per year If maximum piped to Brentwood: 1,645,055 miles saved per year *The four EVRAS units proposed for Brentwood SWD can handle 3,000 barrels per day, out of which approximately 1,200 barrels per day will be evaporated. **Goal is to pipe as much as possible. Some trucking is inevitable.

17 Information and Outreach August 28, 2008: Met with leadership of neighborhood associations directly affected by pilot September 9, 2008: Met with Chamber of Commerce to address concerns about trucking and disposal of drilling waste Future Meetings with Neighborhood Associations, as requested, to delineate plan.

18 Next Steps Finalize pilot agreement with Chesapeake Bring to City Council for approval October 2008 Extend Salt Water Moratorium for 9 months to July 2009 –Monitor operation and efficiency of Brentwood Pilot –Begin conceptual discussions with other operators How do we expand the Brentwood Pilot model citywide, if successful Consider the creation of Citywide Saltwater Management Utility –Consider franchise opportunities –Liability