+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.

Slides:



Advertisements
Similar presentations
Design Guidelines for Primary and Social Care focus on the Modernisation agenda integration of care: Traditional GP services Community services Social.
Advertisements

Professor Dave Delpy Chief Executive of Engineering and Physical Sciences Research Council Research Councils UK Impact Champion Competition vs. Collaboration:
THE HOUNSLOW EXPERIENCE: A CASE STUDY Mark Steward MAX Associates 28 th April 2009.
Energy Conservation Energy Management.
29/05/ Floodlights on Over Recreation Ground Floodlight Project Team.
Complex PV Projects Financial Planning. Overview Impact of FITs Development, capital & operational costs Bulk discounts Income Returns Roof options Scenario.
NEW Sport & Physical Activity Strategy Michelle Adams Sport & Leisure Services Manager Stoke-on-Trent City Council.
External Funding Opportunities for the Arts A presentation by Calum Murdoch, Senior External Funding Officer 7 December 2011 REGENERATION & HOUSING.
Designing meaningful career paths – to take account of changes in the structures of law firms
SB306 Clean Air Tax or Fee Final Report January 2015 Northwest Economic Research Center College of Urban and Public Affairs.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Part of the BRE Trust BRE: Investigation into Longtown Heating Systems David Butler 9 October 2014.
The View From Bristol Dave Cowley Policy & Projects Officer Bristol City Council.
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
A Christian community with so much to offer…. We are aiming to improve our premises to enhance our mission.
Whistler Lodge Survey December 2012 Commissioned by the VP Administration.
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
Riverview Community Wellness Place A place to grow wellness in Riverview!
North Tuddenham Village Hall Facilities Upgrade Project 2012.
Executive Report Keith Lilley Director of Facilities Management.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Funding and Finance for Community Centres and Hubs (from donations, to grants, to contracts and social finance – and planning!)
1 Community Facilities Unit The Future Management of 5 Leisure Facilities Welcome and introductions Facilities within scope Context Community protections.
Opportunities for Participation - key concepts
TRICS and Continuing Care Retirement Communities (CCRCs) IAIN WARNER, TETLOW KING PLANNING.
2012/13 Housing Capital Programme. What is the Capital Programme? It is the planned major refurbishment and improvement work such as kitchen & bathroom.
Copyright 2009 Northumberland County Council A Neighbourhood Plan for Broomhaugh and Riding Peter Rutherford, Northumberland.
Gilsland Village Hall Refurbishment Project. Built in 1893 as a reading room for the village Large function room upstairs and smaller hall, kitchen and.
London’s challenges for ECO Sebastiaan van Dort Head of Green Deal & ECO 11 th July 2013.
Oxford City Leisure Facilities Review Ian Brooke Head of City Leisure Temple Cowley User Group 11 th March 2010.
Community Energy What is a community scheme ? Various options How our generation will change The community opportunity The Gwent Energy way Some of our.
NSW Department of Education & Training NSW Public Schools – Leading the Way My School Financial Data Explained Sample Primary School.
1 ANNUAL GENERAL MEETING Saturday 23 rd March
Maintenance Review 2004 A review of the procurement of repair and maintenance works for Hertfordshire County Council.
Green Deal and ECO Hilary Tanner, LGA Insert date
Wales Building Regulations 2013 Part L Existing non-domestic buildings September 2012.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
Grant Application Guidelines Club Voice Day INEC Killarney
Service Property Priorities 2005/6 for Adult Care Services Presented by Mark Lobban.
Review of Grant Aid – Proposed Changes. Today’s agenda Introductions Grant Aid schemes - proposals Any questions? Update on Protection of Vulnerable Groups.
City of Rehoboth Beach Summary of Master Plan Consultations, Recommendations and Progress to date By Stan Mills for July 7 Board of Commissioner's Meeting.
Caistor Old Co-Op John Mather Lincolnshire Community Land Trust.
Update on Options September Issues for this meeting:  Green Hotel options  Other site/building options  Business Plan  Funding.
Energy options for your community building Alison Lax Project Manager – Low Carbon Communities.
Process of Planning, Designing and Financing a Hospital
Housing Refugees and Maximising Income Julian Prior - Action Foundation Action Housing – Asylum seekers with NRPF – ARE Action Letting – New refugees –
Review of Grant Aid. Today’s agenda Introductions Short presentation Group discussions Feedback from groups What next?
The Organisation of Sport Unit 1- The Sports Industry.
1 LESSON OBJECTIVE To understand leisure provision. LESSSON OUTCOME To be able to explain public, private and voluntary sectors.
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
Chelmsford Cathedral case study Cathedrals and Climate Change 2 nd November 2009 Daniel Kenning CEng CEnv Principal Environmental Consultant Harrison Group.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
REGIONAL AQUATIC CENTER PUBLIC OUTREACH & NEED ASSESSMENT FINAL REPORT GLOBE CITY COUNCIL APRIL 28, 2015.
Proposals for a Transit Site for Gypsy Travellers Steve Hansford Chichester District Council.
Planning Performance Agreements in Islington PAS Pre-Application Services Workshop 19 th June 2014 Victoria Geoghegan Head of Development Management &
Planning Performance Agreements in Camden PAS Pre- Application Services Workshop - 10 June 2014 Frances Wheat Head of Development Management.
PAS Peer Day 10 th February 2015 Zoe Willcox Service Director Planning Place Directorate Positive Planning: Delivering Housing Unblocking stalled sites.
Initial Budget Proposals 2015/16 Initial Budget Proposals 2015/16 Presentation by Leader of the Council and Portfolio holder for Performance and Efficiency.
Project implemented with financial support provided by the European Social Fund within the Community Initiative EQUAL Krzysztof Żmijewski Program Content.
Big Lottery Fund Sarah Carroll Funding Officer (Local) 11 June 2014.
Budget 2005/2006 Focusing on Our Priorities BUDGET CONSULTATION Social Care and Health Scrutiny Committee 25 th January 2005.
Thank You for attending
“kicking on to the finish”
Planning successful bike share schemes
The Council Finances to
LGA update on energy, fuel poverty and climate local
SINKING FUNDS AND EXTRACARE FACILITIES
Threlkeld Village Hall
Presentation transcript:

+ The Future of the Community Centre

+ What we did Test the feasibility of running the Centre without the County Council Building survey Consultation of users, local people and groups Learning from other centres Review of costs and income

+ Findings: Uses Currently well used and well liked Wide variety of uses by most parts of the community Unmet demand at peak times limited by flexibility of space Potential to bring in more daytime uses (e,g, health) and weekend uses (e.g. private hire)

+ Findings: Breaking even Currently just about break even Scope to reduce costs – mainly in staffing & energy Scope to increase income through: Growing existing activities Providing new activities Hire of space Higher fees Need to strengthen management and promotion to improve viability

+ Findings: Repair & Maintenance Significant investment required: Flat roofs need replacing Windows are rotten Heating and electrics are at the end of their economic life Female toilets are in need of refurbishment

+ Findings: Potential improvements Access External appeal Security Circulation Flexibility and space constraints Lack of facilities or inadequate facilities

+ Before & After

+ Findings: Sources of funding County Council Charitable Trusts Landfill Tax Green Deal Community Fundraising ‘Social investment’ Lottery ‘Power to Change’ (not in report)

+ Options Two main options: 1.Extensive refurbishment: Phase 1: Essential repairs, changing facilities, fitness suite, new entrance, new heating system Phase 2: Further internal layout changes, new toilets & lighting, further repairs 2. New build (smaller centre)

+ Recommendations & Next Steps Committee to agree on preferred option Confirm costings through full Feasibility Study, to include: Detailed design and costing Further essential surveys (e.g. asbestos and bats) Additional business planning Bid writing Agree Heads of Terms with County Council Simplify leasehold arrangements for 3 parts of the building