St Mary’s, Melton Mowbray – November 2013 “The stateliest and most impressive of all churches in Leicestershire”

Slides:



Advertisements
Similar presentations
Options for change to schools in Melton Mowbray and the Vale of Belvoir Second Stage of Consultation Have your say Leicestershire County Council is consulting.
Advertisements

Cathedrals Romanesque Gothic. Floor plan of Canterbury, pre 1350.
AGM 2012 Proposed Redevelopment Proposed Redevelopment of Church Entrance & Foyer APCM 2012 St Peter s Church Bishop Waltham St Peter s Church Bishop Waltham.
Development Strategy nd Consultation. Our Mission To proclaim Gods kingdom and call people to worship God in Streatham To seek to serve our community.
Newport News Scottish Rite Your Logo Here Welcome to the Newport News Scottish Rite Masonic Center 65 Saunders Road.
Andrew renfree PULSE - home. andrew renfree PULSE - home.
1. Background 2. Design 3. Cost 4. Fundraising PLACE OF WORSHIP – there are around 500 members of St John’s and services are held throughout the week.
Welcome Car Parking Standards. It is important to remember that this is only a Partial Review of selected elements of the RSS – not a Full Review. It.
St Swithun’s Open Meeting 30 th June What is the state of the church? ( Hint, look around you) The architect’s report identified some urgent issues.
Rha RHA Architects Ltd 17. The Diocese of Portsmouth The Improved and enlarged St Joseph Parish Church: Romsey Existing st Joseph Church Location.
1 Andy Sheppard Arup Low Carbon refurbishment of Heritage Buildings.
Erica Ness Moreno Valley High School
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
The Gothic Cathedral. THE GOTHIC CATHEDRAL OBJECTIVES Understand the key structural components of the Gothic cathedral Explain the origins of the Gothic.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
UNIT Eight: the high middle ages. Romanesque Architecture Links to good romanesque web sites: Santiago de compostella.
Gothic Cloze. The cluster of piers in the nave of Gothic Cathedrals are also called c___________ p_____. The Gothic Cathedral with two western façade.
ALTERATIONS TO HARTLEY DODGE MEMORIAL HOLT  MORGAN  RUSSELL ARCHITECTS.
Church Renovation/ Expansion Proposals Willowdale.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
A Christian community with so much to offer…. We are aiming to improve our premises to enhance our mission.
Bath Tourism Plus – Tourism Forum Footprint People and place fully alive Charles Curnock 10 th March 2015.
Duluth, MN Cara Prosser and Katie Benz
Welcome Renewable Energy 3 rd June. It is important to remember that this is only a Partial Review of selected elements of the RSS – not a Full Review.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
TML: 2012 and Beyond thomasmemoriallibrary.org. TML: 2012 and Beyond thomasmemoriallibrary.org Thomas Memorial Library Library Improvement Program An.
Hinckley Baptist Church Sanctuary Refurbishment Proposals 2010.
INVESTING IN THE FUTURE Information Session April 6, 2014 St. Paul’s United Church Accessibility Committee 1.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
St. Peter Lutheran Church East Peoria, Illinois SacredSpace liturgical design consultants What do we want from our building? Architectural Programming.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
First United Methodist Church Katy, Texas Preliminary Master Plan Presentation September 29, 2009.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Wales Building Regulations 2013 Part L Existing non-domestic buildings September 2012.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Gothic 1. Gothic Art - Theme “The Quest for Height and Light.” focus on the new light (lux nova) desired by Abbot Suger for St. Denis the competitive.
Gothic Fu Hui Yan. Gothic Arose in Northern France In the later Renaissance From 2 nd half of the 12 th century to the beginning of the 16 th century.
Chelmsford Cathedral case study Cathedrals and Climate Change 2 nd November 2009 Daniel Kenning CEng CEnv Principal Environmental Consultant Harrison Group.
Gothic Architecture Architectural History ACT 322 Doris Kemp.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
The Cathedral The Cathedral The Cathedral of Cagliari, dedicated to St. Mary, is situated in Piazza Palazzo in the historical quarter of Castello. The.
Business Technology Mr. Bernstein Design the Physical Layout November 20, 2013.
Vocabulary to know- Shape of a typical Gothic church – cross Nave – long center aisle Transept- “arms” of the cross Choir – beyond the transept “Head”
“Unless the Lord builds the house...” Psalm 127:1 Church Reordering 2016 Appeal Launch.
Building Team Formation: Background Information St. Andrew Presbyterian Church March 27,
MASTERPLAN Drivers for Masterplan: There are a number of drivers determining the need for – and direction of a Masterplan covering the entire St.
+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.
St Mary's Church is the largest and "stateliest" parish church in Leicestershire.
ARC 102 FINAL PROJECT PRESENTATION VACATION HOUSE ARC 102 FINAL PROJECT PRESENTATION.
Aldeburgh Golf Club Club House Proposals 1 September 2015.
Campaign Story Periods of input and analysis Periods of action Periods of commitment Project Commitment Listening Phase Preparing Phase Financial Commitment.
Everybody wants to have a beautiful and nice home where we live more pleasant and comfortable life. The interior decoration of home is.
Shore Green Supported Housing Manchester
“kicking on to the finish”
St Michael’s Bishop Middleham
The way forward – May 2015 How are we doing?
“Gather & Grow” Agenda Welcome & Opening Prayer Monsignor Bronkiewicz
Gothic 1.
All Saints Church proposal
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
ST PAUL‘S CATHEDRAL.
Shore Green Supported Housing Manchester
Part 5 : What Are Our Opportunities?
City Council Meeting November 5, 2018
Stoughton Public Library
CHELMSFORD DAC DESIGN AWARDS 2019
Presentation transcript:

St Mary’s, Melton Mowbray – November 2013 “The stateliest and most impressive of all churches in Leicestershire”

A Historic Church for the 21st Century Key Issues Access – 19 th Century restorations lowered the floor by 13 inches! Facilities – Lack of welcoming entrance, meeting, crèche and refreshment areas Existing Plan Where were we??? The Previous Proposals

Three Interrelated Elements / Areas 1.West Porch and Nave 2.North Transept 3.Vestries Proposed Plan

West Porch and Nave Disabled Access – Raised Levels Glazed Draft Lobby and Heating Improved Lighting Display / Welcome Area

North Transept Access Refreshment Facilities Flexible Seating / Social Area Accessible Toilets Vestries Flexible Meeting Spaces Crèche Sound Separation Easy Access to Toilets Reorganised Choir Vestry

The West Porch The design approach for the internal west porch has been driven by the desire to create a contemporary light touch intervention that is fully reversible. The design and sizing of the new internal porch to St Mary’s has been developed to allow disabled persons to operate the doors unassisted. Where are we now??? Development of the Proposals

Glazed Draft Lobby Precedent – Ripon Cathedral

The North Transept Three key objectives have remained the same however there form has changed.

Flexible Meeting and Crèche Facilities – Sightlines The form and size of the pod has been arrived at so as to reduce its visual impact upon the interior of the church. To achieve this careful consideration has been given to the key sightlines within the church and the relationship of the pod to the stain glass windows within its proximity.

Flexible Meeting and Crèche Facilities – Sightlines

New Facilities - Pods Precedents St Botolph, Boston All Saints, Hereford

New Facilities – Kitchen Facilities Precedent – St Botolph, Boston

Supporting Work 1.A Statement of Need 2. A Statement of Significance including archeologically assessment University of Leicester Archaeological Services 3. Our Stage C Design Report by Buttress Fuller Alsop Williams 4. A report on the organ produced by Paul Hale with recommendations 5. A bat survey produced by Christopher Smith MRICS MSc CEnv. 6. An access audit produced by Phil Chambers Consultancy. 7. A report on the condition of the floor by the QI architect Peter Rogan.

Summary of Key Responses – English Heritage and the DAC Three levels of response received. A.Support to bring forward proposals for:- 1. Renewal and elevation of the floor including new services. 2. Organ B.Tentative support for:- 1. Internal West Porch (EH and DAC not in complete agreement!) 2. Tea Brew Facility 3. WC’s in north transept but also in west porch Further studies requested (Spatial Audit to inform options appraisal) C. Opposition to current Meeting Room / Crèche Smaller more traditional form preferred.

Possible Ways Forward Phasing of the Works Produce Spatial Audit and Option Appraisal Contest Objections! Q & A